Hazem Adel

Project Coordinator at Canal telecom Eng. Co
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
United Arab Emirates, AE

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • Telecommunications
    • 1 - 100 Employee
    • Project Coordinator
      • Oct 2018 - Present
    • Insurance
    • 1 - 100 Employee
    • Site Engineer
      • Aug 2017 - Jul 2018
    • Microwave Transmission Engineer
      • Aug 2015 - Jul 2017

       Installation 1. Installing New Microwave millimeter Links (IPASO-EX) all outdoor equipment. For (RAN Sites , Mini-OLT and Private customers) 2. Installing all outdoor version of Microwave PASO Links (IPASO-IX). 3. Install deferent types Microwave NEC PASO links (XPIC and SD)  Migration / Swap 1- Traffic migration and Core IP migration. 2- Cold and Hot Swap from NEO/ V4 to (IPASO-400, IPASO-IX and IPASO-EX). 3- Traffic shifting after installing new parallel Links 4- Indoor to Outdoor Swap.  Extra Activities 1- Installing and troubleshooting PNMSj (PASOLINKS Network Management System JAVA) in Etisalat Network (Level one support). 2- Troubleshoot fluctuation problems and BER issues and critical cases at Etisalat MW network.  Install Huawei Links Show less

    • Microwave Transmission Engineer
      • Oct 2014 - Apr 2015

      1- Hot Swap # Swap PASO links (NEO, NEO Standard,) To IPASO (200, 400 , 400A and 1000) At Madinah , Yanbu , Hail And Tabouk. # Swap Traffic (2G , 3G and BB) from RTN and Nokia Links to NEC. # Swap Traffic (2G , 3G) witch connected to link from E1's to Vlans.2- Upgrade # Upgrade Links From (1+0 and 1+1) to (2+0 , 4+0 and 8+0) # Upgrade Rings and Sub Rings to carry heavy traffic. # LTE upgrade and craet it's Vlans. 3- Acceptance # Quality check visits as per NEC and Zain standards. # Preparation of sites for PAT (Provisional Acceptance) & FAT (Final Acceptance) Show less

    • Transmission Engineer
      • Nov 2012 - Oct 2014

      1- Hot SWAP for NEC Equipment. Swap PASO links (NEO, NEO Standard, and V4) To IPASO (200, 400 and 1000) At (Alexandria, Port Said, Dumyat, Faqus, and working now at Hihya). Swap Traffic ( 2G and 3G) to be worked at IPASO links and make cross connection for different E1’s from Site to BSC.2- New Implementation (Rollout).3- New Parallel Implementation. Install MW NEC link with different antennas diameters (0.3 to 1.2m) and different configurations (1+0, 1+1, 2+0, 2+2). ( At Alexandria, Port said , Dumyat and Sharkia ) Troubleshooting Links (High BER, fluctuation, LOF (line of site problems) etc...)4- Cutover. Swap traffic (2G and 3G ) from Different vendors to NEC Equipment ( IPASO 200,400 and 1000) At ( Alexandria, Dumyat, Matrouh and working now At Hihya)5- Acceptance. Quality check visits as per NEC and Mobinil standards. Preparation of sites for PAT (Provisional Acceptance) & FAT (Final Acceptance). Show less

    • IT and Network Engineer
      • Jan 2011 - Nov 2012

      1- Full maintenance, hardware & software for PCs & Servers & full network maintenance. 2- Familiar with Cisco and Cyberoam devices. 3- Aware of VMware and ESXI virtualization. 4- Familiar with Monowall , Pfsense and D-link firewalls. 5- Built a network infrastructure & installed about 1000 points, rack to rack and from rack to phase plate in sakkr language school. 6- Built a network infrastructure & installed about 100 points, rack to rack, from cameras to rack and from phase plate to rack in Emethanex. 7- Full computer, firewall and Server maintenance at (Quality foods co, EL deep for industries, Ain shams and Energy Allies for petroleum Services, etc,). 8- Install more than 10 CCTV at El Orouba Resort. 9- Install more than 70 IP and CCTV cameras at different places in Alexandria and Cairo. 10- Install finger prints at different places in Alexandria. 11- Install kaspersky management console at El deep for industries and Alexandria for plastic injection. Show less

Education

  • Alexandria Higher Institute of Engineering & Technology
    Bachelor's degree, Electrical, Electronics and Communications Engineering
    2004 - 2010

Community

You need to have a working account to view this content. Click here to join now