Hassan Nasir

Electrical Engineer at Balloki CCPP at TNB Remaco Pakistan (Private) Limited
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Pakistan, PK
Languages
  • English Professional working proficiency
  • Urdu Full professional proficiency

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

5.0

/5.0
/ Based on 1 ratings
  • (1)
  • (0)
  • (0)
  • (0)
  • (0)

Filter reviews by:

Muhammad Shoaib Dahar

Hassan has a good knowledge of Electrical and Instrumentation field.

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • Industrial Machinery Manufacturing
    • 1 - 100 Employee
    • Electrical Engineer at Balloki CCPP
      • Sep 2017 - Present

      ¨ Managing all aspects of Electrical Maintenance of complete power plant and 500KV Switchyard in consistent with protecting the Owners investment and achieving site KPIs in a safe, reliable, economical and environmentally friendly manner.¨ Leading the team of Engineer and technicians for smooth execution of maintenance activities.¨ Co-ordinated with owner engineers and Client for issuance of punch points to EPC against deficiencies.¨ Issuance of warranties in defect liability period and assist the management in terms of punch point closure settlement. ¨ Preparation and implementation of SOPs with respective maintenance check sheets/Work instruction and incorporation of PMs in maintenance tool maximo based on OEM guidelines.¨ To prepare outage plans , work scheduling & execution of outages with resource management.¨ Budget planning (up to 185 Million) for electrical section in line with site overall budget targets.¨ Preparation of FMEA & Critical spares planning in line with FMEA and procurement till final inspection.¨ Technical evaluation of received quotations of spares, Services and projects.¨ Preparing outage and monthly maintenance reports to be shared with customer and efficiently completing all tasks assigned by senior management. ¨ To initiate, coordinate, monitor & execute preventive, predictive, corrective and condition-based maintenance activities of power plant Electrical and HVAC equipment as per OEM guidelines and recommendations.¨ Troubleshooting faults and managing major/critical corrective maintenance activities to reduce possible down-time.¨ Working as an authorized Competent Person ensuring EHS compliance.¨ Prepare and execute MOCs & cost saving projects.¨ Prepare the Scope of work , BOM & BOQ for various services and projects.¨ Root Cause Analysis (RCA) of different equipment/system failures and considering subsequent preventive measures.

    • Pakistan
    • Oil and Gas
    • 700 & Above Employee
    • Manager Preventive Maintenance(Distribution)
      • Nov 2016 - Sep 2017

      Managing the Preventive Maintenance activities of LV equipment and network.Ensuring the availability of material and other resources for timely completion of projects.Planning and technical review of System improvement proposals of aerial bundled conductors (ABC) for management approval and Performance evaluation of contractors.Managing and performance evaluation of the human resources including engineers & technicians.Ensuring the Compliances of SOPs and HSE policies of company.

    • Lead Electrical Engineer
      • Aug 2016 - Oct 2016

      Projects: Sachal Wind power Project Jhampir (As an Owner Engineer) Tenaga Wind Power Project Gharo (As an Indepandant Engineer) Foundation Wind Energy-II Gharo(As an Lead End of Warranty Engineer)Responsibilities:• Preparation of daily and monthly progress reports.• Liaison between the EPC contractor and vendors for project related issues.• Co-ordinate with Govt authorities (NTDC, HESCO, GoS Energy Deptt etc) for site execution works.• Issuance of punch points & non Conformances reports in case of deficiencies or deviation from the EPC contract or non-compliance of International standards.• Technical review of Issued for Construction/Approval(IFC/IFA) electrical schematics,test protocols/procedures, layouts and dwgs for Substation (132/22KV) equipments, CT/VT, LV Swgr (0.38KV), SCADA, ABB MV Swgr (22KV) and GIS, battery system, UPS system, lighting system and Earthing system.• Technical review of SLD/Metering& protection system of Substation.• Technical review of Wind turbine generator (WTG) equipments layouts and dwgs for GSU transformer & RMU (22/0.62KV), Lighting and earthing system.• Technical Review of installation & commissioning procedures/protocols and also the Material approval request (MAR) for approval.• Implementation of Permit to work.• Inspection of electrical installation and commissioning ensure all work is carried out as per EPC contract and approved energy purchase agreement (EPA) and protocols.• Inspection of installtions, commissioning and testings of various equipments (ABB 132/22KV GIS, Transformers, MV/LV Swgr etc) of substation.

    • United Kingdom
    • Oil and Gas
    • 700 & Above Employee
    • Electrical Engineer (Commissioning & Maintenance)
      • Dec 2012 - Jan 2016

      Ensure the effective achievement of Electrical Commissioning functional objectives through the leadership of the department setting individual objectives, managing performance, developing and motivating staff, provision of formal and informal feedback and appraisal in order to maximise subordinate and departmental performance.• Planning and Execution of daily electrical commissioning, preventive and corrective maintenance activities of project.• Ensure completion of all documentation, Sign off and acceptance of all compliant documentation.• Liaison with client (SEC), Consultant (LI) subcontractors & vendors (GE, Siemens & ABB) for project related issues.• Review of IFC Electrical & control Schematics/Dwgs/SLDs (480v, 4.16KV&18KV) of Electrical installation & equipments.• Managing & Supervision of pre-commissioning, commissioning, O&M activities of 335 MVA GE hydrogen cooled Generator (324LD) and its control panel (Mark VIe).• Supervision & execution of pre-commissioning, commissioning & Maintenance activities of MV/LV switchgears, MCCs, CBs (ACB, VCB&SF6), CTs &VTs.• Managing & Supervision of pre-commissioning, commissioning, O&M of 290/386 MVA (400/18 KV) generator step up, 25 MVA (18/4.16 KV-4.16/0.48 KV) unit auxiliary & 2.15MVA (18/0.84 KV) excitation transformers as per vender provided procedures.• Execution of pre-commissioning, commissioning, energization, maintenance of GE Warm Back Up 100mm Excitation System EX2100 (& its brush collector compartment) of Generator and Generator Protection System GP2100 (consists of GE C60, G60, T60, T60ET etc relays) including secondary injection of various Electrical equipments.• Execution of STG stability test, inter-trip & interlock scheme of plant, PI test of generator and also the HI-POT test of MV Cables. • Supervision of Commissioning & periodic maintenance activities of GE D11 steam turbine, its BOP (Lube oil, emergency DC lube oil system, lift oil and TG system of STG) and Common system of plant.

    • Pakistan
    • Industrial Machinery Manufacturing
    • 300 - 400 Employee
    • Electrical Engineer(E&I Maintenance)
      • May 2011 - Oct 2012

      • Planning and Execution of Preventive and corrective maintenance activities of plant.• Managing the outages (Forced/Planned) of 132KV transmission line and power dispatch with the co-ordination of KESC and National control center (NCC).• Execution of Operation & maintenance activities 132KV Switch yard containing SF6 CB, GE protection relays (L90, D60, T35 etc), 50/62.5 MVA (11/132KV) transformers, CTs, VTs, isolators, & transmission line.• Execution of corrective maintenance activities of Basler rotating diode excitation system of generator.• Execution of maintenance & operation activities of MV & LV Switchgear (11KV&0.38KV), GEC Alsthom Alternators (14MVA) its auxiliaries keeping in view all necessary safety precautions & SOPs.

    • Pakistan
    • Glass, Ceramics and Concrete Manufacturing
    • 400 - 500 Employee
    • Deputy Manager(Electrical Maintenance)
      • Aug 2008 - May 2011

      • Carried out complete management of process plant reliability / maintenance - preventive and corrective (schedules and un-scheduled - both), maintained stores / spares inventories, inspection schedules. • Execution of PM&CM activities of MV/LV Switch gear, Distribution System & transformers.• Managing the execution of CM activities on PLC based control panels, HMIs, Relay based control system and pneumatic system.• Aware of PLC programming of Omron PLC and trouble shooting of OMRON & Siemens Variable Frequency AC Drives (VFDs) &DC Drives.• Project Team Member of setting up new tile manufacturing plant of STCL.• Supervision and execution of erection and commissioning work of MV/LV panels, control panels and field instruments.• Managing and supervision of Installation & commissioning work for process machines control Panels & cable trays, cable laying & Conduting.

    • Plastics Manufacturing
    • 200 - 300 Employee
    • Trainee Engineer-Electrical
      • Aug 2007 - Aug 2008

      Execution of O & M of 2 X 2MW Niggata HFO fired GENSET.Execution of corrective & preventive maintenance of Plant electrical equipment and its auxiliaries as per manufacturer recommendation. Execution of O & M of 2 X 2MW Niggata HFO fired GENSET.Execution of corrective & preventive maintenance of Plant electrical equipment and its auxiliaries as per manufacturer recommendation.

Education

  • NED University of Engineering and Technology
    M.E, Electrical Power Systems
    2008 - 2010
  • Quaid-e-Awam University of Engineering, Sciences and Technology Nawabshah
    B.E, Electrical Power
    2003 - 2007
  • B.I.E.Karachi
    HSSC, Pre Engineering
    1999 - 2002
  • B.S.E.Karachi
    SSC, Science
    1997 - 1999

Community

You need to have a working account to view this content. Click here to join now