Hassan Khan (Environmental Engineer)
Environmental Specialist at Fouad Al-Saleh & Khaled Al-Dhowalia Environmental & Engineering Consultants Company- Claim this Profile
Click to upgrade to our gold package
for the full feature experience.
-
English Professional working proficiency
-
Urdu Full professional proficiency
-
Arabic -
Topline Score
Bio
0
/5.0 / Based on 0 ratingsFilter reviews by:
Experience
-
Fouad Al-Saleh & Khaled Al-Dhowalia Environmental & Engineering Consultants Company
-
Saudi Arabia
-
Civil Engineering
-
1 - 100 Employee
-
Environmental Specialist
-
Jan 2020 - Present
Project: Development and Implementation of Environment, Health, Safety (EHS) & Firefighting Management System at Saudi Central Bank (SAMA) Head Quarter and all its branches in KSA. Roles & Responsibilities: ➢ Environmental Gap Assessment • Environmental gap assessment carried out for SAMA’s Head Office and all its branches against ISO 14001 – 2015 (EMS), RC – 14001 (Health, Safety, Security & Environment), KSA Environmental Rules and Regulations, EPA/ WHO/ COSHH/ OSHA guideline, and international best practices. • Prepared environmental desktop review system against ISO 14001 – 2015 EMS. • Carryout environmental field effectiveness verification with respect to SAMA processes. • Prepared EMS Gap Assessment Report against criteria. ➢ Environmental Monitoring: • Conduct environmental monitoring of parameters such as Noise, Light, Temperature, Humidity & Windspeed by standard environmental instruments to comply with OSHA standards as per client requirements. • Potable/ non-potable (drinking/ domestic) and wastewater quality analysis to meet compliance obligation requirements. • Exhaust emissions testing and monitoring to fulfil legal requirements. • Prepared environmental monitoring survey reports. ➢ Development of Waste Management System: • Designed Hazardous and Non-Hazardous waste management system for all SAMA processes with the consideration of environmental aspects. • Prepared system based on 3Rs hierarchy: Reduce, Reuse and Recycle. • Developed process followed by waste segregation and sorting on the basis of category/ kind of waste generation on site and disposal off-site into color coded dumpsters and respective purpose build containers or bags. • Disposal of recyclable, non-recyclable, and hazardous waste through licensed or approved waste management contractor. ➢ Prepared Environmental Management Plan (EMP): • Made environmental management plan (EMP) based on environmental aspects and associated impacts related to all SAMA processes. Show less
-
-
-
-
Environmental Engineer
-
Jan 2019 - Dec 2019
Project: Hawaiyah to Uthmaniah Gas Pipeline of 56-km Roles & Responsibilities: ➢ Environment Management System • Assist manager in routine/ non-routine activities, development and implementation of environment management system and procedures. ➢ Environmental Management Plan (EMP): • Prepared environmental management plan related to identified environmental aspects and associated impacts. ➢ Waste Management Plan (WMP): • Prepared waste management plan and assured its implementation on site. ➢ Assurance of Compliance: • Fulfilled the compliance with the requirements of the Saudi ARAMCO, GAMEP and CEMP regulations. ➢ Environmental Monitoring: • Ambient air monitoring including SOx, NOx, CO, PM10 and PM 2.5. • Vehicular exhaust emissions. • Noise monitoring. • Potable and non-potable water testing. ➢ Environmental Aspects and Impacts: • Identification of environmental aspects and associated impacts with mitigation plan. ➢ COSHH (Control of Substances Hazardous to Health): • Conduct COSHH assessment and rectification of non-conformances. ➢ Environmental Incident/ Accident Investigations: • Carrying out environmental incident/accident detailed investigations, propose counter measures (CMs) & follow-ups for implementation to prevent its recurrence. ➢ 5S (Sort-out, Set in order, Sweep & Shine, Standardize & Sustain): • Management of planed/surprise 5S Walk Audit (weekly) by management, Ranking, follow-ups of Non-conformances (NCs) rectification & Awards distribution. ➢ Events Celebration: • World Environment Day celebration to motivate employees to protect environment from harm. Show less
-
-
-
-
Environmental Coordinator
-
Jan 2018 - Dec 2018
Project: Jizan Infrastructure & Port Division by Saudi Aramco Roles & Responsibilities: ➢ Implementation of Saudi Aramco General Instruction 298.010 (Administration Procedure of Contractor Camp). ➢ Implementation of Saudi Aramco General Instruction 151.006 (Sanitary Code). ➢ Prepared Environmental Management Plan (EMP) and associated procedures for Saudi Aramco Project Management Team (PMT). ➢ Attended Saudi Aramco PMT and EPD planed and random audits/ inspections. ➢ Control the fugitive dust emission by various methods with respect to applicability. ➢ Assessment and monitoring of potable and non-potable water. ➢ Preparation and submission of environmental management report on monthly basis to Saudi Aramco PMT. ➢ Implementation of Waste Management Plan and report submission on monthly basis. ➢ Conduct ambient air and noise monitoring and reports submission to Saudi Aramco PMT. ➢ Exhaust emissions monitoring of heavy vehicles and reporting. Show less
-
-
-
Power Cement Ltd
-
Pakistan
-
1 - 100 Employee
-
Assistant Manager EHS
-
Mar 2016 - Dec 2017
Roles & Responsibilities: ➢ Assurance of Compliance: • To ensure legal & social compliance with respect to Environment, Health & Safety and Fire which includes Pak-EPA laws & regulations, ILO Convention C155 (Labor Laws), Factories Act 1934 and Civil Defense Act 1952/1994. ➢ EIA for Power Cement Line 02 of 7700 Tons/Day Project: • Has played a key role to carryout EIA as coordinator from Power Cement Ltd (PCL) (Client) in liaison with Environmental Protection Agency & Environmental Management Consultant. ➢ Implementation of ‘Environmental Management Plans: • Implementation of Environmental Monitoring Plan which includes; Drinking & Waste Water, Ambient Air, Stack Emissions, Vehicular Emissions, Noise, Soil, etc. • Implementation of Solid Waste Management Plan. • Implementation of Hazardous Waste Management Plan. • Control of Particulate Matter from Stacks by installation of Filter Bag House. • Control of Fugitive Dust Emission by Roads Pavement, Water Sprinkling, installation of fitter bag house at conveyer’s transfer points, lemmatize the speed of heavy vehicles etc. • Control of exhaust gases from stack by controlling the operation and material & fuel chemistry. ➢ Implementation of EMP for “Coal Handling and Transportation” which include: • Coal Dust Management. • Coal Fire Control. • Leachate Management. • Traffic Hazards. • Environmental, Occupational Health & Safety. ➢ Assist in development & implementation of EHS Management Plan for the Project PCL Line 02 of 7700 Tons/Day which was supervised by World Class FLSmidth Denmark and Construction & Installation by TEPC Chinese Contractor; Foreign funded project which includes: • Development of Procedures, Plans, Reports & EHS related documents. • Conduct accidents/Incidents investigations. • Recommend & review Policy /Regulations and Working Guidelines/Instructions. ➢ Intended International Cardiac Ambulance Fully Equipped. ➢ Intended International Standard Fire Fighting Tender having multi extinguishing mediums. Show less
-
-
-
Pakistan Space and Upper Atmosphere Research Commission (SUPARCO)
-
Research Services
-
100 - 200 Employee
-
Trainee Environmental Engineer
-
Jan 2015 - Feb 2016
Roles & Responsibilities: ➢ Documentation for ISO 17025& 14001 of SUPARCO Environmental Lab. ➢ Preparation of Proposals, Liaison and Follow-up with Clients. ➢ Preparation of Environmental Management Plan (EMP). ➢ Preparation of Quarterly Report for Environmental Monitoring at Kannup (K-2/K-3). ➢ Conducted Environmental Monitoring for Various Commercial Clients. ➢ Environmental Modeling of Keenjhar Lake using ArcGIS. Roles & Responsibilities: ➢ Documentation for ISO 17025& 14001 of SUPARCO Environmental Lab. ➢ Preparation of Proposals, Liaison and Follow-up with Clients. ➢ Preparation of Environmental Management Plan (EMP). ➢ Preparation of Quarterly Report for Environmental Monitoring at Kannup (K-2/K-3). ➢ Conducted Environmental Monitoring for Various Commercial Clients. ➢ Environmental Modeling of Keenjhar Lake using ArcGIS.
-
-
-
Pakistan Steel Mills Corporation
-
Machinery Manufacturing
-
700 & Above Employee
-
Internee
-
Jun 2013 - Jul 2013
-
-
-
WWF - Pakistan
-
Non-profit Organization Management
-
400 - 500 Employee
-
Internee
-
Jun 2012 - Jul 2012
-
-
Education
-
NED University of Engineering and Technology
Master of Engineering - MEng, Environmental Management -
Dawood University of Engineering and Technology
Bachelor of Engineering - BE, Environmental and Energy Engineering -
SGS Academy Perú
ISO 14001 - 2015 Environment Management System -
Pakistan Engineering Council (PEC)
Short Course 'Environmental Impact Assessment' (EIA), Environment, Health and Safety -
CORSHE
NEBOSH-IGC, Health, Safety and Environment -
SGS Academy Perú
Lead Auditor, ISO-45001 - 2018 (Occupational Health and safety Management System) -
SGS Academy Perú
Lead Auditor, ISO 9001 - 2015 (Quality Management System) -
Energy Updates
Attend International Conference, Alternative Energy -
Energy Updates
Attend International Conference, Power Generation -
Solarization Welfare Organization
Attend Conference, Energy Conservation -
ILO
Short Course, Essentials of Occupational Health and Safety (EOSH) -
Safety Trends International
IOSH (Managing Safely), Health, Safety and Environment -
Safety Trends International
OSHA Confined Space Safety, Health, Safety and Environment -
Safety Trends International
OSHA Hazards Communication, Health, Safety and Environment -
Safety Trends International
OSHA 10 Hours, Health, Safety and Environment -
Safety Trends International
OSHA Scaffolding Safety, Health, Safety and Environment