Hashim Halim

Survey Manager at Saudi Bin Ladin
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Makkah, Saudi Arabia, SA

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • Construction
    • 700 & Above Employee
    • Survey Manager
      • Dec 2019 - Present

      Lead the survey team and supervise the construction survey such as, Mentoring and supervise the horizontal rock cutting to be sure the required level is already made Mentoring and supervise the constructions of High Rise building (Service buildings zone 12 ) Set out marking and levels the boundary and construction line for blinding concrete, raft concrete, retaining wall include the horizontal and vertical construction joints, columns and slabs Roads and landscape survey work All surveying work in steel work ,anchor bolt and raised floor All finishing work ( slab on grid-block wall - lintel beams – Marble - Ceramics) Show less

    • Singapore
    • Design Services
    • 700 & Above Employee
    • Lead surveyor engineer
      • Oct 2017 - Oct 2019

      Project owner: - National Authority for Tunnels (NAT) Project contractor: - Crec-Avic and many of Egyptian companies Project consultant: - Khatib & Alami consulting Engineering Main project component (Tracks, Buildings, Roads, Fence, Steel, Infra) Review project drawings, Method of statement and specification Supervision of all activities in sites (Track lines (on concrete, on basalt, on steel Posts), Roads, Buildings, Infra, Steel work, CCTV…) Calculate the Cut & Fill quantities Arranging the survey work with other departments to be sure the work progress run as per specifications. Preparing daily, weekly and monthly reports. Show less

    • Lead Survey engineer
      • Jul 2016 - Dec 2017

      Supervising the construction of 75 buildings in the tenth of Ramadan And the receipt of all the works of surveying and cadastral from the work of the Travers and the work of the necessary rubbers. Supervising the construction of 75 buildings in the tenth of Ramadan And the receipt of all the works of surveying and cadastral from the work of the Travers and the work of the necessary rubbers.

    • Saudi Arabia
    • Construction
    • 700 & Above Employee
    • Surveying Engineer
      • Jun 2013 - Jun 2016

      Lead the survey team and supervise the construction survey such as, Establish and adjust the traverse control points Mentoring and supervise the rock cutting include sloops, platforms, and rock anchoring Mentoring and supervise the horizontal rock cutting to be sure the required level is already made Mentoring and supervise the constructions of High Rise building (Security building plt1 and plot 3) Lead the survey team and supervise the construction survey such as, Establish and adjust the traverse control points Mentoring and supervise the rock cutting include sloops, platforms, and rock anchoring Mentoring and supervise the horizontal rock cutting to be sure the required level is already made Mentoring and supervise the constructions of High Rise building (Security building plt1 and plot 3)

    • Site survey engineer
      • Jun 2011 - Jul 2012

      I work raise Surveyors by GPS from the old Laith way to the new Laith way to the Red Sea about 45 km length with I km width fixed the control points of project and connected to the geodesic grid with length about 45 kilometers by static method work raise of the topographic earth natural by (Rtk) method raise the roads and sidewalks by (stop & go) method I work raise Surveyors by GPS from the old Laith way to the new Laith way to the Red Sea about 45 km length with I km width fixed the control points of project and connected to the geodesic grid with length about 45 kilometers by static method work raise of the topographic earth natural by (Rtk) method raise the roads and sidewalks by (stop & go) method

    • Technician Office engineer
      • Oct 2010 - Jan 2011

      Worked as an technician Office engineer for the work of the General plan for the village and the work plan of each part of the village (Sanitation - roads - Villas - Gas Agriculture- Irrigation) Worked as an technician Office engineer for the work of the General plan for the village and the work plan of each part of the village (Sanitation - roads - Villas - Gas Agriculture- Irrigation)

    • Site survey engineer
      • Sep 2009 - Sep 2010

      Worked with a group of surveying works detailed for Haoutat Bani Tamim city to Alaflg city his distance from the approximately 400 kilometers to the work of cadastral maps for this part of the UK Worked Dalam Municipality Project (Aldahy Park) and I make stake out during the Project Has signed plan (abandoned Valley Alaqimi) with an area 150000 m 2, and sign a promise to raise property other lands Worked with a group of surveying works detailed for Haoutat Bani Tamim city to Alaflg city his distance from the approximately 400 kilometers to the work of cadastral maps for this part of the UK Worked Dalam Municipality Project (Aldahy Park) and I make stake out during the Project Has signed plan (abandoned Valley Alaqimi) with an area 150000 m 2, and sign a promise to raise property other lands

    • Survey Engineer
      • Sep 2008 - Jul 2009

      Worked in Al Rehab City in New Cairo as atechnician office engineer and calculation quantities for the earth work of the construction works and roads Worked in Al Rehab City in New Cairo as atechnician office engineer and calculation quantities for the earth work of the construction works and roads

Education

  • https://feng.bu.edu.eg/
    2004 - 2008

Community

You need to have a working account to view this content. Click here to join now