    • India
    • Oil and Gas
    • 300 - 400 Employee
    • Project Manager
      • Jun 2018 - Present

      o Construction works like▪ Erection▪ Welding▪ Testing▪ Electrical CablingBasically Electrical EPC contract work. Electrical Penetration Assemblies (EPA) And Cable Sealing Materials For 700 MWe PHWRs. It is first of its kind in India under Make in India concept.Site management - Man power mobilization/de mobilization, billing follow up, Training and building work culture, safety tool box talk, client meeting (1st project completed 2018-2019 / 2nd project started on December 2020 & is almost completed)

    • Lead Mechanical Engineer
      • Jan 2017 - May 2018

      Site fabrication of Mounded LPG bullets x 3 Nos and erection testing, Commissioning etc.7.00 Mtr. Diameter x 100 Mtr length with PWHT process. Man power handling, Day to day work plan etc.

    • United Arab Emirates
    • Oil and Gas
    • 500 - 600 Employee
    • Sr Mechanical Engineer
      • Oct 2015 - Dec 2016

      Pipe Spools Fabrication, Erection and Hydro Testing, Preparing Hydro Test Packages. Pipe Spools Fabrication, Erection and Hydro Testing, Preparing Hydro Test Packages.

  • Adarsh Engineering
    • Pune/Pimpri-Chinchwad Area
    • Technical Manager
      • Feb 2014 - Jul 2015

      Overall factory management, mainly manufacturing, client interaction, safety look out, training program Overall factory management, mainly manufacturing, client interaction, safety look out, training program

    • India
    • Oil and Gas
    • 300 - 400 Employee
    • Resident construction manager (RCM)
      • Jan 2013 - Jan 2014

      Worked as RCM on IOCL Refinery project a Paradeep Odisha, India. It was LSTK contract. Site fabrication of 22 numbers storage tanks with associated piping. Max. dia. of doom roof tanks was 80m (Volume : 70 Million Liter). Site fabrication of LPG mounded bullet 6.0 M dia. x 90.0 m long x 42 mm thk SA516 plate x 3 nos Total manpower was 1000+ Worked as RCM on IOCL Refinery project a Paradeep Odisha, India. It was LSTK contract. Site fabrication of 22 numbers storage tanks with associated piping. Max. dia. of doom roof tanks was 80m (Volume : 70 Million Liter). Site fabrication of LPG mounded bullet 6.0 M dia. x 90.0 m long x 42 mm thk SA516 plate x 3 nos Total manpower was 1000+

  • L & T Modular Fabrication Yard
    • Sohar, Al Batinah North Governorate, Oman
    • Training Manager
      • Feb 2009 - Dec 2012

      Special Task Completed in Larsen & Toubro Modular Fabrication Yard Sohar, Oman ● Managed welding training center exclusively for Omani Trainees with designed curriculum by imparting training (theory and practical) to upgrade and develop them as a skilled welder ● Number of trainees recruited and developed were over 150 and the best were absorbed in company. Special Task Completed in Larsen & Toubro Modular Fabrication Yard Sohar, Oman ● Managed welding training center exclusively for Omani Trainees with designed curriculum by imparting training (theory and practical) to upgrade and develop them as a skilled welder ● Number of trainees recruited and developed were over 150 and the best were absorbed in company.

  • Bilfall Heavy Engineering
    • Jubail Industrial City, Eastern, Saudi Arabia
    • Construction in-Charge (Modular Fabrication Yard - MFY)
      • Jun 2008 - Nov 2008

      Executed desalination project for Yanbu Power Plant Weight. 1900 MT each Total 9 Units Executed desalination project for Yanbu Power Plant Weight. 1900 MT each Total 9 Units

  • Mohammed Al Mojil (MMG)
    • Rabigh, Makkah, Saudi Arabia
    • Welding superintend
      • Sep 2007 - Apr 2008

      Work on Pero Rabigh Saudi Arabia. Worked with multi national skilled welders. Number of welding foremen, Welding supervisors reporting me were almost 20 each to handle 200 welders. I have to look after welder raining center, welder qualification, Interaction with client officers. Work on Pero Rabigh Saudi Arabia. Worked with multi national skilled welders. Number of welding foremen, Welding supervisors reporting me were almost 20 each to handle 200 welders. I have to look after welder raining center, welder qualification, Interaction with client officers.

  • Sparkon Engineers Pvt. Ltd.
    • Chakan, Pune Maharashtra, India
    • Production Manager
      • Dec 2004 - Aug 2007

      ● DRDO Project at Chhattisgarh –Vacuum Casting Chamber, Defense Project related to AGNI Missile Launching. Completed fabrication, Erection & Commissioning of the project with soft ware SCADA system for proper mixing of propellent for missile launching. ● Al Hiswa Yemen Skid Mounted Evaporators (Desalination – TCD120) x 3 Nos, Weight 90 MT each. ● L'Oréal shampoo mixing project a Chakan Talegaon, Pune factory. ● DRDO Project at Chhattisgarh –Vacuum Casting Chamber, Defense Project related to AGNI Missile Launching. Completed fabrication, Erection & Commissioning of the project with soft ware SCADA system for proper mixing of propellent for missile launching. ● Al Hiswa Yemen Skid Mounted Evaporators (Desalination – TCD120) x 3 Nos, Weight 90 MT each. ● L'Oréal shampoo mixing project a Chakan Talegaon, Pune factory.

  • Hi-Tech Systems
    • Ad Dammām, Eastern, Saudi Arabia
    • Fabrication Engineer
      • Aug 2002 - Aug 2004

      Manufacturing of chemical process plants. Site fabrication and erection, testing etc. Man power mobilization, Purchase, Man power training Manufacturing of chemical process plants. Site fabrication and erection, testing etc. Man power mobilization, Purchase, Man power training

    • Production Manager
      • Mar 1996 - Feb 2002

      ● Heavy fabrication for cement industry, chemical process industry ● Forming of dished ends on hydraulic press and flanging on spinning machine, knuckling of cone ● Manpower planning mobilization, demobilization, raw material estimation, dispatch schedule and billing follow-up ● Heavy fabrication for cement industry, chemical process industry ● Forming of dished ends on hydraulic press and flanging on spinning machine, knuckling of cone ● Manpower planning mobilization, demobilization, raw material estimation, dispatch schedule and billing follow-up

    • India
    • Mechanical Or Industrial Engineering
    • Shift In charge
      • Dec 1980 - Feb 1996

      ● Manufacturing of Process Equipment like Pressure Vessel and Reactor with jacket or limpet coil out of stainless steel, carbon steel as per ASME Code ● Double Cone Vacuum Dryer, Rotary Vacuum Dryer ● Storage Tanks(API) – Vertical on concrete foundation, Horizontal with Saddle Supports/Lug Supports ● Shell and Tube Heat exchanger as per TEMA, U Tube bundle assembly ● Manufacturing of Process Equipment like Pressure Vessel and Reactor with jacket or limpet coil out of stainless steel, carbon steel as per ASME Code ● Double Cone Vacuum Dryer, Rotary Vacuum Dryer ● Storage Tanks(API) – Vertical on concrete foundation, Horizontal with Saddle Supports/Lug Supports ● Shell and Tube Heat exchanger as per TEMA, U Tube bundle assembly

Education

  • Govt Polytechnic Ratnagiri
    Mechanical Engineering
    1977 - 1980
  • Model Multipurpose High School
    SSC

Community

You need to have a working account to view this content. Click here to join now