Topline Score

Bio

Generated by
Topline AI

0

/5.0
/ Based on 0 ratings
  • (0)
  • (0)
  • (0)
  • (0)
  • (0)

Filter reviews by:

No reviews to display There are currently no reviews available.

0

/5.0
/ Based on 0 ratings
  • (0)
  • (0)
  • (0)
  • (0)
  • (0)

Filter reviews by:

No reviews to display There are currently no reviews available.
You need to have a working account to view this content. Click here to join now

Credentials

  • Energy Manager
    Ministry of Mines and Energy
    Dec, 2013
    - Sep, 2024
  • High Voltage Responsibility Certificate
    TMMOB Elektrik Mühendisleri Odası / Chamber of Electrical Engineers of Turkey
    Jan, 2010
    - Sep, 2024

Experience

    • Co-Founder
      • Sep 2020 - Present

      Bovinagro Teknik, yatırımın en başından itibaren ekonomik ve teknik analizleri yatırımcıya sunan, bütün seçenekleri ortaya koyan ve farklı senaryoları belirten Fizibilite raporlarıyla fark yaratan bir firmadır. Teknoloji ve tecrübeyi birleştirerek Projelendirme aşamasında en iyi ekiplerle Güneş Enerji Santrali, Tarım ve Hayvancılık işletmeleri tasarımı yapılmaktadır. Yapılan projenin birebir tamamlanmasını sağlayan Proje Yönetim Danışmanlığı hizmeti verilmektedir. Hayvancılık alanında işletmenin kurulmasından sonra Türkiye'nin en yetkin çiftlik danışmanlarıyla işletmenin kar eden bir ticari işletme olarak devam etmesini sağlayan Yönetim Danışmanlığı Hizmeti vermektedir. Show less

    • Türkiye
    • Food Production
    • 1 - 100 Employee
    • Assistant General Manager
      • Dec 2019 - Present

    • Coordinator
      • Jul 2016 - Present

      Investment Management, Production Planning And Facility Management, Solar Power Management, Finance Management

    • Aviation & Aerospace
    • 1 - 100 Employee
    • Energy Center Electrical Engineer
      • Jan 2013 - Jul 2016

      Energy Management ( Electricity-Heating-Cooling ) ( ISO 50001) Budget Planning and Reporting of Energy Center Systems Investment Planning According to Current Legislations and Savings Measures Prepare Presentation to Top Management Licensed Energy Manager ( Ministry of Energy and Natural Sources ) Management of Turkish Energy Market Application for Antalya Airport Management of High Voltage Systems Energy Management ( Electricity-Heating-Cooling ) ( ISO 50001) Budget Planning and Reporting of Energy Center Systems Investment Planning According to Current Legislations and Savings Measures Prepare Presentation to Top Management Licensed Energy Manager ( Ministry of Energy and Natural Sources ) Management of Turkish Energy Market Application for Antalya Airport Management of High Voltage Systems

    • Site Manager and Project Coordinator
      • Feb 2012 - Nov 2012

       Designing and Drawing High Voltage-Low Voltage Systems and Have Goverment Agency Approved Projects  Installation and Commissioning High Voltage System ( Total 48 MVA )  Turnkey Cattle Breeding Farm Electricity Projects and Works ( Farm Capacity 3000 Beef )  Turnkey Cold Storage Electiricity Projects and Works  High Voltafe Responsibility Works of High Voltage Customers  Designing and Drawing High Voltage-Low Voltage Systems and Have Goverment Agency Approved Projects  Installation and Commissioning High Voltage System ( Total 48 MVA )  Turnkey Cattle Breeding Farm Electricity Projects and Works ( Farm Capacity 3000 Beef )  Turnkey Cold Storage Electiricity Projects and Works  High Voltafe Responsibility Works of High Voltage Customers

    • Türkiye
    • Automation Machinery Manufacturing
    • 1 - 100 Employee
    • Project Manager
      • Jun 2009 - Jun 2011

        AHLIA CEMENT PLANT 3200 Ton/Day – LİBYA ( May 2010- February 2011 )  Supervising and Managing over hundred Electrical Technicians  Insulation Tests of All Motors and Cables for Reactivate  Organising Pulling Power and Data Cable ( 740 Km )  Installation, Test and Comissioning Sıemens S7300 I/O Cabinets  Installation, Test and Commissioning Main PLC ( S7 400 )  Installation, Test, Commissioning of Site Instruments and Integrated Into Automation ( 2200 Pcs Instrument )  Site I/O Test with Siemens Turkey  Installation and Comissioning Fire Alarm System with Siemens Turkey  Installation and Commissioning Dolby Announcement System  Installation, Connection and Commissioning 34,5 kV Double-Busbar Switchgears Installation, Connection and Commissioning 6,3 kV Switchgears  Integration High Voltage Systems into Automation and SCADA with Siemens  Installation, Test and Commissioning Distrubution and Power Trasnformers ( 51 MVA )  Installation and Commissioning All Lighting of Plant  Preparation of As-Built Projects  Factory Acceptance Test SHELL FEELING STATION-ANTALYA ( June 2009-February 2010 )  Designing of Feeling Automation Scenario and Programming (Simatic S7-200 )  Desinging of Automation Panel and Start up  Installation and Start Up of Site Instruments  Installation and Start up 1000 kVA Transformer and Low Voltage Panel  Design and Installation Ex-proof Lighting Armatures  Project and Installation Ligtning  Project and Installation Ligthing, Fire Fighting and Announcement Systems of Administrative Buildings  FORD OTOSAN KOCAELİ-GÖLCÜK PLANT ( February 2011-May 2011 )  Modification Busbar Systems of Transit Skid Lines  Organization of Assembly-Disassembly Skid Robots  Transfering Robots  TÜPRAŞ İZMİT ( May 2011-July 2011 )  Designing Landfilling Handle System Tubing  Installation Instruments  Designing and Commissioning of Filling Automation System with Supervisor Show less

Education

  • Akdeniz Üniversitesi
    İşletme Yüksek Lisans Programı (MBA), Master of Business Administration
    2014 - 2016
  • Kocaeli Üniversitesi
    Mühendislik Fakültesi Mezunu, Electrical Engineering
    2005 - 2009

Community

You need to have a working account to view this content. Click here to join now