Harvie Labaupa
QA/QC Engineer (E & I) at ISA MANNAI TECHNICAL SERVICES- Claim this Profile
Click to upgrade to our gold package
for the full feature experience.
-
Tagalog -
-
English -
Topline Score
Bio
Credentials
-
Certified & Registered Electrical Engineer
Philippines Regulation CommissionSep, 2006- Oct, 2024 -
Registered at Saudi Council of Engineers
Saudi Council of Engineers
Experience
-
Computer System Protection Chambers & Integrated Communications Co. Ltd. (CPIC)
-
Oil and Gas
-
1 - 100 Employee
-
QA/QC Engineer (E & I)
-
Jun 2013 - Present
•Responsible for all aspects of Quality Assurance /Quality Control during project execution. •Preparing all the relevant Quality documentation required by the client and implementing the work as per approved PQP, ITP, IFC & SABIC Standard. •Study the drawings; understand the detailed engineering drawings and documents specifications & building quality. •Reporting and Documenting of Non-Conformances and observations and general liaison with the project in-charge in relation to the quality and progress of work. •Carry-out inspections throughout the project commissioning and handing over stages. •Responsible for Inspection & Monitoring of materials deliveries and storage to ensure compliance with specified requirements. •Coordinate with client representative for joint inspection as required in ITP by raising the RFI's and maintaining and compiling quality records related to project execution. Show less
-
-
-
Al Gihaz Holding
-
Saudi Arabia
-
Appliances, Electrical, and Electronics Manufacturing
-
700 & Above Employee
-
Project Engineer
-
Sep 2010 - Sep 2012
•Preparation of tender documents in terms of the project and design review on all design stages. •Responsible for the site requirements and coordinating with the design consultant for all the technical documents and approval of drawings that will be applicable for the project. •Carry-out construction projects progress throughout the commissioning and handing over stages. •Evaluate variation orders, and monthly progress claims. •Supervise site development activities and evaluate change order / additional works due to existing field condition and assisting the head of section in negotiations with contractors/ client on pending issues. •Monitoring of the work at site to ensure that all of the activities are carried-out in accordance with the Time Schedule and Client standard. Show less
-
-
-
Voltas Limited - A TATA Enterprise
-
Computers and Electronics Manufacturing
-
700 & Above Employee
-
Electrical Engineer
-
Apr 2008 - May 2010
•Evaluates data as to scope, effect of all electrical installations of the project. •Performed and directs complex engineering work and technical services in the field of electrical engineering work activities. •Performed in depth design reviews to verify conformance to company engineering standards and specification on project in the design and construction stage to ensure that all drawings and types of installation and materials to be use is in accordance to the latest revision and approved for construction. •Coordination with design department regarding the construction drawings to be issued to site and ensure that the drawings are coordinated to other trade before issuing to supervisors for execution. Show less
-
-
-
Hyundai Heavy Industries Co., Ltd
-
South Korea
-
Shipbuilding
-
700 & Above Employee
-
E&I Engineer
-
Oct 2006 - Nov 2007
•Responsible for the field quality, installation & testing for all relevant aspect of electrical activities. •In-charged for the preparation and testing of High Pot and IR Test for MV & LV Cables. •Supervised and monitor all the installation to ensure that all activities are carried-out in accordance with the approved PQP & ITP, DEP, Company Standard Specification, and Works Procedure & Manufacturer’s Instruction. •Responsible for the field quality, installation & testing for all relevant aspect of electrical activities. •In-charged for the preparation and testing of High Pot and IR Test for MV & LV Cables. •Supervised and monitor all the installation to ensure that all activities are carried-out in accordance with the approved PQP & ITP, DEP, Company Standard Specification, and Works Procedure & Manufacturer’s Instruction.
-
-
Education
-
Nueva Ejica University of Science and Technology
Bachelor of Science, Electrical and Electronics Engineering