Harry Jones
Dry Liner & SFS Installer at Ceilings & Partitions LTD- Claim this Profile
Click to upgrade to our gold package
for the full feature experience.
Topline Score
Bio
Experience
-
CPL Ceilings & Partitions LTD
-
United Kingdom
-
Construction
-
1 - 100 Employee
-
Dry Liner & SFS Installer
-
Nov 2014 - Present
Building steel framing systems (SFS) Exterior walls that include; Infill walling, SFS Load bearing, Continuous walling, High Bay walling. internal steel framing partitions walls. Ceiling fixing ; MF ceiling, lane grid and SAS metal pan tiles. Building steel framing systems (SFS) Exterior walls that include; Infill walling, SFS Load bearing, Continuous walling, High Bay walling. internal steel framing partitions walls. Ceiling fixing ; MF ceiling, lane grid and SAS metal pan tiles.
-
-
-
Severn Trent
-
United Kingdom
-
Utilities
-
700 & Above Employee
-
Water Leakage Technician Apprentice
-
Nov 2012 - Nov 2014
2 year Apprenticeship in the leakage team for the local water supply company NVQ Level 2 Water Engineering BTEC Level 2 Water Engineering 2 year Apprenticeship in the leakage team for the local water supply company NVQ Level 2 Water Engineering BTEC Level 2 Water Engineering
-
-
-
Self-Employed Contractor
-
Business Consulting and Services
-
700 & Above Employee
-
Sub Contract Dry Liner (Trainee)
-
Nov 2010 - Nov 2012
NVQ Level 2 – Dryliner / Fixer NVQ Level 2 – Dryliner / Fixer
-
-
Education
-
On site training
Pass -
Walton High School
GCSE