Hariharan S
Technical Lead at HCL Engineering and R&D Services- Claim this Profile
Click to upgrade to our gold package
for the full feature experience.
Topline Score
Bio
Experience
-
HCLTech – Engineering and R&D Services
-
IT Services and IT Consulting
-
500 - 600 Employee
-
Technical Lead
-
Jun 2021 - Present
Creation of Schematic, ICD, Cable and wiring harness design for Control Box, PDU, PLC Box, PDB using Visio & Auto CAD tool Working on designing Cable drawings for Interconnect cables & Rack Internal cables using AutoCAD tool Preparing Bill of Materials for the Cable & Harness Design. Responsible for whole Tool Document preparation, SAP Enovia updates & release Uploading of drawing to PDM Tool once drawing is approved & Maintain design database Material Ordering & Procurement for prototype samples, Pilot-lot testing. ECO & Handoff documents preparation and sign-off to NPI team for Production release. Mentored team members and provided technical support as needed Creating Project & Team Performance (DPI & DQI) reports Show less
-
-
-
Ford Motor Company
-
United States
-
Motor Vehicle Manufacturing
-
700 & Above Employee
-
Sr Electrical Design Engineer
-
Aug 2017 - Jun 2021
Ford Motor Company- payroll by satyam venture engineering services (Since Aug 2017 to till) ROLES & RESPONSIBILITY: • Control schematic design for electrical Control panel & sub-assemblies for Powertrain Program • Validated & approval the OEM Electrical & Control Drawings, FIS Validation • Validate Factory Information system (Plant Floor MES) in Powertrain plant of Ford globally • Maintain the standard PLC template followed across all powertrain plants in Ford • Developed plant Electrical Control Drawings specification’s and Preparing the Bill of Material's, updating documentation in our Engineering Management system • Data Analysis Controls & Electrical Components Obsolescence part to adopt cost effective solutions in Powertrain plant of Ford globally Highlight: • Prepared Protocol for Electrical drawings validation • Prepared Protocol for Electrical & Control’s Product Life Cycle’s Show less
-
-
-
JK Voltage
-
Madurai Area, India
-
Electrical Engineer
-
Jul 2014 - Aug 2017
Electrical Engineer (Electrical Design & Industrial Automation) Engineering electrical design in detail (Using design software of EPLAN Electric P8 for schematic control drawing, Control Panel & Assembly drawing) • Sound knowledge in selection of electrical switch gear components & Load calculation (PLC & I/O Module Preferment, HMI & SCADA, AC Drive, Starters and other switch gear components) • Power & Control cable schedule • Preparing the electrical part list (BOM) and the Indents through ERP for procurement • Strong Knowledge in LT Transformer Design range 5va to 50kva & HT Transformer up to 12kv • Transformer Testing and failure analysis. • Estimating the material costs of transformer. • Overall monitoring of electrical project activities (Installation & Commissioning) • Preparation of design documents in Customer required format Application • Electrical costing preparation for design based on client requirement • Bill of material (BOM) preparation based on client requirement Interaction with client & supplier for technical discussion Show less
-
-
-
Prolific Systems & Technologies Pvt. Ltd.
-
India
-
Education Administration Programs
-
100 - 200 Employee
-
Automation Engineer
-
Jun 2012 - Apr 2014
Providing complete automation solutions - PLC Programming, HMI & SCADA development, customers support, service and training. Consulting customers during design and implementation of the new services. Consulting and helping other teams’ members in resolution of complex and unusual problems related to production support and new development. Commissioning and testing of new or existing project. Providing Post commissioning support. Providing complete automation solutions - PLC Programming, HMI & SCADA development, customers support, service and training. Consulting customers during design and implementation of the new services. Consulting and helping other teams’ members in resolution of complex and unusual problems related to production support and new development. Commissioning and testing of new or existing project. Providing Post commissioning support.
-
-
Education
-
SACS MAVMM Engineering College, Madurai
Bachelor of Engineering (B.E.), Electrical and Electronics Engineering -
Gms mavmm polytechnic college
diploma, computer technology