Harald Schmitt

Technical Manager at WEBAC-Chemie GmbH
  • Claim this Profile
Contact Information
Location
Berlin, Berlin, Germany, DE
Languages
  • English Full professional proficiency
  • German Native or bilingual proficiency
  • French Elementary proficiency
  • Spanish Limited working proficiency
  • Icelandic Elementary proficiency
  • Danish Limited working proficiency
  • Italian Elementary proficiency

Topline Score

Bio

Generated by
Topline AI

0

/5.0
/ Based on 0 ratings
  • (0)
  • (0)
  • (0)
  • (0)
  • (0)

Filter reviews by:

No reviews to display There are currently no reviews available.

0

/5.0
/ Based on 0 ratings
  • (0)
  • (0)
  • (0)
  • (0)
  • (0)

Filter reviews by:

No reviews to display There are currently no reviews available.
You need to have a working account to view this content. Click here to join now

Credentials

  • British Tunnel Society - Tunnel Design & Construction Course
    British Tunneling Society

Experience

    • Germany
    • Wholesale Building Materials
    • 1 - 100 Employee
    • Technical Manager
      • Apr 2018 - Present

      Tunneling & Waterproofing Tunneling & Waterproofing

    • Information Technology & Services
    • Tunnel Engineer
      • Nov 2017 - Mar 2018

      Proposal Study for fixed subsea link from Iceland to Vestman Island - 18km subsea tunnel Contractual advice for small size Business Proposal Study for fixed subsea link from Iceland to Vestman Island - 18km subsea tunnel Contractual advice for small size Business

    • Civil Engineering
    • 700 & Above Employee
    • Project Manager
      • Oct 2016 - Oct 2017

    • Senior Concrete Quality Engineer
      • Oct 2013 - Oct 2017

    • Quality Control Engineer
      • Feb 2010 - Sep 2013

      Independent Quality Control Consultant on the STEP-T2 Project in Abu Dhabi. The project comprises a 15km sewage tunnel excavated by three earth pressure balance TBM with an excavated diameter of 6.9m. The project started in September 2009 and will run until 2012.

    • Tunnel Engineer
      • Oct 2013 - Sep 2016
    • Independent Research
      • 2009 - 2011

      Evaluation of possible benefits of installation of wind power on the icelandic market. Swot analysis including interviews of major consultants, planning authorities, research institutions and industry. Extension of the research on a possible power link to the Europe and contact to the European Commission for transnational networks. Presentation of results in a final summary report. Evaluation of possible benefits of installation of wind power on the icelandic market. Swot analysis including interviews of major consultants, planning authorities, research institutions and industry. Extension of the research on a possible power link to the Europe and contact to the European Commission for transnational networks. Presentation of results in a final summary report.

    • Iceland
    • Civil Engineering
    • 300 - 400 Employee
    • Civil Engineer
      • Jan 2005 - Feb 2010
    • Senior Engineer
      • 2008 - 2009

      Senior Engineer on the Kárahnjúkar Hydroelectric Project in Iceland - Responsible for the concrete works of the Headrace Tunnel and Jökulsá Tunnel, including management of interface with electro-mechanical installation for the valve chambers and plugs. - Responsible for the organisation, development of the procedures and supervision of the monitoring programme for tunnel filling. - Responsible for the Final Technical Reports, particularly for the TBM excavation, the performance in the referring counter drives by D&B, the drilling and grouting works, the concrete works and the post excavation finishing works. - Responsible for the Technical Documentation and Quality Assurance - Participation in the development of a web based document management system for the electronic presentation of the documentation. - Co-authoring of the Financial Reports for the Kárahnjúkar Dam and the Headrace Tunnel. Show less

    • Concrete Engineer
      • 2005 - 2007

      Supervision of the Concrete Works on the Kárahnjúkar Hydroelectric Project KAR 14 Headrace Tunnel and Jökulsá Tunnel - Responsible for the coordination of electro-mechanical installation by other contractors, including overseeing of design and establishing of move in and move out certificates. - Responsible for the development and organisation of checklists as well as their follow up and sign off in course of the Quality Assurance. - Responsible for auditing the contractor’s concrete production control as inspection body according to EN206. - Responsible for the document and drawing management including checking of design drawings before issuance and approval of the contractor’s drawings. Show less

    • Oil and Gas
    • 1 - 100 Employee
    • Civil Engineer
      • 2004 - 2004
    • Construction
    • 1 - 100 Employee
    • Diplom Ingenieur
      • 2000 - 2003

      Construction supervision of Steel Arch Bridge Stubenrauchstraße in course of the BAB 113, comprising the erecting of 700-ton steel arch bridge crossing a river where ship traffic was in progress Construction supervision of Steel Arch Bridge Stubenrauchstraße in course of the BAB 113, comprising the erecting of 700-ton steel arch bridge crossing a river where ship traffic was in progress

    • Germany
    • Real Estate
    • Supervision
      • 1994 - 1999

      Reconstruction of the historical Weidendammer Brücke in Berlin Mitte Reconstruction of numerous metro station of the Berlin U-Bahn under operation Construction supervision the Dorotheenblöcke (Jakob Kaiser Haus) (Government offices close to the German Reichstag building) Reconstruction of the historical Weidendammer Brücke in Berlin Mitte Reconstruction of numerous metro station of the Berlin U-Bahn under operation Construction supervision the Dorotheenblöcke (Jakob Kaiser Haus) (Government offices close to the German Reichstag building)

    • Civil Engineer Technical Office
      • 1992 - 1993

      - Calculation for stress analysis of concrete structures - Concrete outline and reinforcement Drawings - Drawing Management - Involved in the installation of a quality management system according to ISO-DIN-9000, development and design of procedures and checklists. - Calculation for stress analysis of concrete structures - Concrete outline and reinforcement Drawings - Drawing Management - Involved in the installation of a quality management system according to ISO-DIN-9000, development and design of procedures and checklists.

Education

  • Technische Universität Berlin
    Dipl.-Ing, Civil Engineering
    1985 - 1992
  • Clavis language Center
    certificate of achievment, Danish Language and Literature
    2014 - 2015

Community

You need to have a working account to view this content. Click here to join now