Topline Score

Bio

Generated by
Topline AI

0

/5.0
/ Based on 0 ratings
  • (0)
  • (0)
  • (0)
  • (0)
  • (0)

Filter reviews by:

No reviews to display There are currently no reviews available.

0

/5.0
/ Based on 0 ratings
  • (0)
  • (0)
  • (0)
  • (0)
  • (0)

Filter reviews by:

No reviews to display There are currently no reviews available.
You need to have a working account to view this content. Click here to join now

Experience

    • Oil and Gas
    • 1 - 100 Employee
    • Operation Dept
      • Nov 2014 - Present

      Monitoring, Controling, & Analysis Overall Equipment, Instrument, Pipeline System Field Gas Station. Reporting Custcody Transfer to Operation Manager. Keeping Good Communication With Owner. Knowledge Process Flow Diagram, Design Construction, Process Natural Gas Plant (Facility) and Pipeline Onshore Inspector. Monitoring, Controling, & Analysis Overall Equipment, Instrument, Pipeline System Field Gas Station. Reporting Custcody Transfer to Operation Manager. Keeping Good Communication With Owner. Knowledge Process Flow Diagram, Design Construction, Process Natural Gas Plant (Facility) and Pipeline Onshore Inspector.

    • Project Control & Piping Engineer
      • Mar 2014 - Nov 2014

      Creating Dialy Activity Planning LPG Refinery Plant Control: Piping & Welding Dept, Hydrotest & Mechanical Dept, Structural Dept, QC Dept, and Man Power. Creating Weekly and Mountly Progress Reporting to Side Manager. Scheduling,Target / Actual Setting, and Follow Up Coordination Control. Knowledge Process Flow Diagram, Plot Plant, General Arrangement, Spool Piping Drawing, Design and Construction LPG Refinery Plant. Prepare Mechanical Completion, Commissioning, Start-Up, Initial Operation, and Performance Test. Show less

    • Coordinator Team Pipeline Inspection
      • Nov 2013 - Mar 2014

      Cathodic Protection & Coating System Inspection Onshore Pipeline Project. Pipeline Current Mapping Inspection. Alternating Current Voltage Gradient Inspection. Knowledge Design and Calculation, Construction Onshore Pipeline Project: River Crossing & Road Crossing HDD Calculation, Drawing Alignment, and Tie-In, Compressor Gas Station (SKG), SSV, and Gathering Station. Cathodic Protection & Coating System Inspection Onshore Pipeline Project. Pipeline Current Mapping Inspection. Alternating Current Voltage Gradient Inspection. Knowledge Design and Calculation, Construction Onshore Pipeline Project: River Crossing & Road Crossing HDD Calculation, Drawing Alignment, and Tie-In, Compressor Gas Station (SKG), SSV, and Gathering Station.

    • Service Engineer
      • Aug 2005 - Aug 2013

      Design Review & Modification Of Equipment. Equipment Failure Cause & Effect Analysis. Planning Maintenance and Repair Schedule Estimation. Leader Project On Expansion Sumatera Area. Knowledge Engineering Cost and Factory Cost, Operating Cost. Design Review & Modification Of Equipment. Equipment Failure Cause & Effect Analysis. Planning Maintenance and Repair Schedule Estimation. Leader Project On Expansion Sumatera Area. Knowledge Engineering Cost and Factory Cost, Operating Cost.

    • Pharmaceutical Manufacturing
    • 1 - 100 Employee
    • Drafter & Technician
      • Jul 1997 - Aug 2005

      Design Review and Modification Analysis. Creating and Updating of Specification. Testing and Inspection Material based on ASME-ASTM, JIS, DIN Standard. Material Analysis Cost Down Project. Knowledge Instrument and Equipment Testing Based on ASME-ASTM Standard. Leader Project on New Project. Knowledge Estimation Cost, Structure Cost, Manufacturing Cost and Saving Cost. Design Review and Modification Analysis. Creating and Updating of Specification. Testing and Inspection Material based on ASME-ASTM, JIS, DIN Standard. Material Analysis Cost Down Project. Knowledge Instrument and Equipment Testing Based on ASME-ASTM Standard. Leader Project on New Project. Knowledge Estimation Cost, Structure Cost, Manufacturing Cost and Saving Cost.

    • Pipe Fitter
      • Mar 1991 - Apr 1993

      Prepare Shut Down, Start Up, and Emergency Maintenance on LNG Plant area. Ensure Continous Operation of Rotating Equipment and Piping System. Knowledge Isometric Piping Drawing, Fabrication, Fit Up and Installation Piping, Piping Instrument Diagram (PID), Lay Out Drawing LNG Plant, Piping Tools,Fitting, Valve and Process Flow Diagram Liquid Natural Gas. Prepare Shut Down, Start Up, and Emergency Maintenance on LNG Plant area. Ensure Continous Operation of Rotating Equipment and Piping System. Knowledge Isometric Piping Drawing, Fabrication, Fit Up and Installation Piping, Piping Instrument Diagram (PID), Lay Out Drawing LNG Plant, Piping Tools,Fitting, Valve and Process Flow Diagram Liquid Natural Gas.

Education

  • Polytechnic Of Sriwijaya
    Dipl Eng, Mechanical Enginnering
    1993 - 1996

Community

You need to have a working account to view this content. Click here to join now