Hamwardi Widjaja
Construction Manager at PT. Bina Rasano Engineering- Claim this Profile
Click to upgrade to our gold package
for the full feature experience.
Topline Score
Bio
Experience
-
PT. Bina Rasano Engineering
-
Indonesia
-
Construction
-
1 - 100 Employee
-
Construction Manager
-
Aug 2019 - Present
Project Execution Plan, Early Work Site Preparation, Construction Plan and Strategy, Equipment and Manpower Schedule, Construction Cost. Piping Plant and above ground pipeline for 20" Brine Reinjection Line, 8" Condensate Line and 58" Steam Line Installation, also 480 ea borepile works ¤600-1400mm x 6m depth. Supreme Energy Rantau Dedap Geothermal Power Plant Project 2x49MW, held by Consortium Rekayasa Industri and Fuji Electric. Project Execution Plan, Early Work Site Preparation, Construction Plan and Strategy, Equipment and Manpower Schedule, Construction Cost. Piping Plant and above ground pipeline for 20" Brine Reinjection Line, 8" Condensate Line and 58" Steam Line Installation, also 480 ea borepile works ¤600-1400mm x 6m depth. Supreme Energy Rantau Dedap Geothermal Power Plant Project 2x49MW, held by Consortium Rekayasa Industri and Fuji Electric.
-
-
-
PT Kelsri
-
Construction
-
1 - 100 Employee
-
-
Oct 2013 - Apr 2019
-
-
-
Jan 2008 - Apr 2019
Communicate and coordination with team work to ensure the project runs as well and to achieve the target completion datereporting construction progress to head office / project manager coordination with client about project construction
-
-
-
Jan 2008 - Aug 2008
Review & Verify Alignment Sheet, Isometric Drawing, Typical DrawingPrepare the construction method and procedureRequest, expedite and prepare all construction equipment requiredEstimate & provide consumable material for construction activitySupervise survey team to collect field data coordinate regarding to calculate pipe bending requiredSupervise for construction activity and maintain to prevent any idle or gapMaintain the construction method to met with procedure, specification and qualityCollect data coordinate for as-built drawing Show less
-
-
-
PT. Kelsri
-
Construction
-
1 - 100 Employee
-
Pipeline Construction Engineer
-
Jan 2008 - Oct 2013
-
-
Education
-
Universitas Tarumanagara (Untar)
Bachelor's degree, Mechanical Engineering