Hammam El Behadi
Construction Manager at First Kuwaiti Trading & Contracting WLL- Claim this Profile
Click to upgrade to our gold package
for the full feature experience.
-
English -
Topline Score
Bio
Experience
-
First Kuwaiti Trading & Contracting WLL
-
Kuwait
-
Construction
-
100 - 200 Employee
-
Construction Manager
-
Dec 2016 - Present
Project : Lower Fars Heavy Oil Development Program Phase-1 (60 MBOPD)Owner : Kuwait Oil Company (K.S.C), KuwaitPMC : Worley ParsonsPosition : Construction ManagerThe broad scope involves development of :- • Production Support Complex (PSC) • Central Processing facility (CPF) • Well Blocks 02 and 03• Infield Satellite Station (ISS) • Trunk and Steam Lines, • Pipelines (Export Oil, Fuel Gas, Make Up & Disposal Water) • Sub Stations • New Storage Tanks along with Loading and Filling Manifolds• New Crude Oil Control Center
-
-
Project Engineer
-
Jun 2011 - Present
FROM 9/2016 till 11/2016Project: Contract No. 37The Main Support, Emergency and Operation Center (MSEOC Project) Value: 15,700,000.000Owner: Kuwait National Petroleum CompanyCompany: First Kuwaiti Trading & Contracting CompanyConsultant: Al Jazeera ConsultantPosition: Project Engineer - Deputy Project ManagerBuilding Area: 150,000M² the said project comprise of building listed below- Fire Administration, Fire Station and all related Facilities - K9 Compound, Guard Houses & Boundary Walls- Site Development- Security Related Buildings- Council of Ministry BuildingsFROM 3/2013 Up To 8/2016Project: Construction, Completion and Maintenance of Police Headquarter, Hawally Project.Value: 11,733,000.000Owner: Ministry of Public Works, KuwaitConsultant: SSHIPosition: Project Engineer - Deputy Project ManagerBuilding Area: 15,000M² Four Floor with Basement including shelter, Shooting Range etc.Responsibilities:1. Overall responsibility for the Construction activities for the project including site work 2. Supervision of Materials, shoring, Excavation, Back filling, Concrete, Form work, Structural Steel3. Execute and reviewing drawing. Specification control and follow up the executed worksFROM 6/2011- 3/2013 Projects: Construction, Completion and Maintenance of Interchanges on Main Highways – 6th Ring Road Connecting to New Housing Area at West of Jleeb al-Shuyoukh Area - (IC.9)Value: 13,370,000.00 DINAR KUWAITOwner: Ministry of Public Work _ KuwaitPosition: Project EngineerOverview: -Upgrade the interchange (56) 6th Ring Road with Road (604), the project has the following:-1. Highway works, 2. Utilities (storm work, water pipe line Electrical work and land scape and irrigation )3. structure work (precast and segmental bridges, culvert structure and retaining wall)
-
-
-
-
project manager
-
Jan 2006 - Jun 2011
FROM 4/2010-6l2011 Projects: Raising Salmiya offense administration Blg Value: 426,000.00 DINAR KUWAIT Owner: Ministry Of Interior _ Kuwait Company: Bayan National Trading Co. Position: Project Manager Overview: -Building area about 700m2 raising 2floor, in addition new area about 300m2 constructed 3floor complete with all mechanical and electrical works> FROM 2/2008-4/2010 Projects: JAHRA HOSPITAL EXPANSION Value: 5,000,000.00 DINAR KUWAIT Owner: Ministry Of Health _ Kuwait Company: Bayan National Trading Co. Position: Project Engineer __Deputy Project Manager Overview: - Depending on the Amiri decree that is: Building Jahra hospital during a period of eight months, and acting on the request of the JAHRA Hospital Department After handover the project I worked in the BNTC Technical Affair share in tendering projects FROM 4/2006-2/2008 Projects: Upgrading of Safety System Rehabilitation of Vehicular Bridges RA/105 Value: 868,000.0 KD Owner: Ministry Of Public Works _ Kuwait Company: Kuwait Arab Contractor. Position: Project Engineer _Approved form Ministry of Public Works – Motorways & Bridges Dept. Responsibility: - - Supervise Concrete Spall Repair, Repair/replace expansion joint of bridge, Repair/Construct Steel works “portal frame”, gets material approval to comply with Specification FROM 12/2005-UPTo 4/2006 Projects: Remedial Works for Vehicular Bridges at several Locations in the State of Kuwait – Group No. (3) RA/47, Value: 600,000.0 KD Owner: Ministry Of Public Works Company: Burhain Co. Consultant: Parsons Brinckerhoff International Position: Project Engineer _ Responsibility: - Supervise Concrete Spall Repair, Shear Strengthening System, Bridge steel column repair
-
-
-
The Arab Contractors
-
Egypt
-
Construction
-
700 & Above Employee
-
Project Engineer
-
Sep 1995 - Dec 2005
Arab Contractor Bridges Specialized Structure Dept FROM 7/2003-12/2005 Project: Rehabilitation LUXOR Air port Value: 150 Million L.E Owner: Ministry Of Civil Aviation ( Egyptian Airports Company ) Consultant: Arab Consultant Engineers ‘ Moharm-Bakhom’, Prof. Dr. FAROK ELGHORY Position: Project Coordinator, Technical Work FROM 9/2002 To 6/2003 Project: Additional Esna Lock Value: 170 Million L.E Owner: Ministry Of Water Resource, Irrigation Consultant: Arab Consultant Engineers ‘Moharm-Bakhom’, Position: Technical Office Engineer FROM 3/2002 To 8/2002 Tunnel Division Projects: Micro tunnel ( EL-Marg, OLD CAIRO AREA, …) Inlet culvert of GABAL ASFAR WWTP (Contract19) Under crossing at different site of egypt Value: 100 Million L.E Owner: Ministry Of Housing, Community Consultant: Different Consultant Position: Project engineer FROM 4/2000 To 3/2002 Projects: NEW ZIFTA LOCK Value: 100 Million L.E Owner: Ministry Of Transportation, Nile transportation authority Consultant: Arab Consultant Engineers ‘ Moharm-Bakhom’, Dr. HAMZA Position: Technical Office Engineer FROM 10/1995 To 4/2000 Projects: MIT GHAMR Bridge across the Nile Value: 60 Million L.E Owner: Ministry Of Transportation, Consultant: Dr. ABD HADY HOSSANY Position: Technical Office Engineer Reponsibilities • Developing and monitoring construction cast and Estimates. • Execute and reviewing drawing. Specification control and follow up the executed works. • Supervising and Managing Site, Mobilization, Handling shop drawings, Design and Drafting Site survey analysis, Project plan and specifications. • Participating in preparing variation requests, change order and claims on extension of project schedule requirements. • Coordination between subcontractors
-
-
Education
-
zagazig universty, faculty of engineering
Bachelor of Engineering (B.Eng.), Civil Engineering -
Al Sayad high grade school at Mitghamr