Hamed Arshadi, PMP

Quality Control Engineer, Project Engineer at Delta Tee International, Inc
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Colleyville, Texas, United States, US
Languages
  • Persian Native or bilingual proficiency
  • English Full professional proficiency
  • Turkish Limited working proficiency

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Credentials

  • Project Management Professional (PMP)
    Project Management Institute

Experience

    • United States
    • Industrial Machinery Manufacturing
    • 1 - 100 Employee
    • Quality Control Engineer, Project Engineer
      • Feb 2018 - Present

      • Inspect the quality of the Welds, Tube sheets, and expanding process during fabrication. • Inspect the final product to confirm the layout, paint, and overall preparation for the shipment. • Ensure quality documents are provided for each project promptly and compare against the drawings. • Compare drawing against the final product and customer`s P.O. to ensure requirements are met. • Design, Purchase, install and manage a new filtration system for hydro testing. • Communicate with management on weekly production meetings to provide updates on the status of the projects. • Respond to any issues or complaints. • Ensure all the testing and measuring equipments are calibrated. • Document all deficiencies and ensure they are corrected. • Assure All the material and construction meet ASME standards. • Select carriers and negotiate contracts and rates. • Develop quotations based on branch preferences, including manufacturers, profit margins, etc. • Maintain good customer and vendor relationships. • Inspect subcontractor's work for compliance with the quality control checklist. • Interact/negotiate with vendors. • Issue P.O.s for various materials and products. • Work within the team setting to accomplish goals. • Identify business-critical issues quickly and collaborate with team members to resolve. • Work with management and operational teams to forecast customer requirements and assist as needed in keeping schedules current. Show less

    • United States
    • Higher Education
    • 700 & Above Employee
    • MS Program university Project - Millenium System Spirit Phone Project Proposal
      • Sep 2017 - Dec 2017

      Proposal of Spirit Phone Project (a mid-tier cell phone) to board members of Millennium Systems to get an approval for production and launch to market. Proposal storyboard creation through analysis of market and company requirements, marketing, risk analysis and risk mitigation plans, cash flow, Monte Carlo analysis, SOW, WBS, OBS, IMP, IMS, EVMS, and advertising campaigns. Successful approval was obtained from Millennium Systems' board members, with the Spirit Phone project providing 80 % probability of success, $270 million after-tax profit in 48 months, and 30 % ROS on 6 million cell phones. Show less

    • MS Program university Project - Convoyer Belt Project
      • Sep 2017 - Dec 2017

      This project was for my MS program and involved the following: Project-plan development by using Work Breakdown Structure (WBS), OBS, SOW, Network diagram and activity planning, created project priority and responsibility matrix using MS Project and Project management skills. Duration-of-project reduction from 563 to 560 days by crashing and paralleling project activities using MS Project, where the project was time constrained to 560 days.

    • United States
    • Higher Education
    • 700 & Above Employee
    • MS Degree University Project - Engineering Economy Project
      • Jan 2017 - May 2017

      Experimental, 2-year plan construction following the anticipated graduation date by documenting yearly events / expenses that have high probability of occurrence and utilizing the principles of engineering economy to calculate its present worth. Experimental, 2-year plan construction following the anticipated graduation date by documenting yearly events / expenses that have high probability of occurrence and utilizing the principles of engineering economy to calculate its present worth.

  • Arta beton bistun
    • Tehran Province, Iran
    • Assistant Project Manager / Quality Control Engineer
      • Oct 2011 - Sep 2015

      • Inspect subcontractors work for compliance with the quality control checklist • Interact/negotiate with vendors. • Issue P.O.s for various, materials and products. • Work within the team setting to accomplish goals. • Identify business-critical issues quickly and collaborate with team members to resolve them. • Work with management and operational teams to forecast customer requirements and assist as needed in keeping schedules current. • Develop quotations based on branch preferences, including manufactures, profit margins, etc. • Maintain good customer and vendor relationships. • Led cross-functional initiatives within the company to relocate the factory. • Reduced average contract expenses by 40% through strategic negotiations with vendors. • Completed factory relocation according to the project schedule. • Trained, coached, and supervised staff to ensure smooth adoption of new initiatives. • Determined engineering hours and project cost to determine product estimates. • Met production goals by maintaining cost effective levels of inventory. • Kept accurate records of all details related to the job, including the material used, employee timesheets, client issues and accident reports. • Addressed employee issues and conflicts, applying listening and communication skills to promote quick resolution. Show less

    • English Teacher
      • Sep 2007 - Dec 2011

      • Instituted classroom management strategies, to motivate positive learning approach • Applied progressive teaching principles in classrooms with 35 students, 85% achieving high grades • Prepared quarterly reports on student performance, helping management, parents to develop learning plans • Instituted classroom management strategies, to motivate positive learning approach • Applied progressive teaching principles in classrooms with 35 students, 85% achieving high grades • Prepared quarterly reports on student performance, helping management, parents to develop learning plans

    • Iran
    • Motor Vehicle Manufacturing
    • 700 & Above Employee
    • Quality Control Intern
      • Jun 2010 - Sep 2010

      • Assisted in tool design to solve technician complications on the machine hardware. • Acquired knowledge of different manufacturing processes such as injection molding, vacuum forming. • Conducted equipment Qualification and Testing. • Assisted in tool design to solve technician complications on the machine hardware. • Acquired knowledge of different manufacturing processes such as injection molding, vacuum forming. • Conducted equipment Qualification and Testing.

Education

  • The University of Texas at Arlington
    Master's degree, Engineering/Industrial Management
    2016 - 2017
  • Azad University (IAU)
    Master's degree, Business management International Trade
    2012 - 2015
  • Azad University (IAU)
    Bachelor's degree, Mechanical Engineering
    2006 - 2010

Community

You need to have a working account to view this content. Click here to join now