Hamed Abd Elnaby
Senior Electrical Engineer at ACE Project Management Moharram Bakhoum- Claim this Profile
Click to upgrade to our gold package
for the full feature experience.
-
English -
-
Arabic -
Topline Score
Bio
Experience
-
ACE Project Management Moharram Bakhoum
-
Egypt
-
Design Services
-
100 - 200 Employee
-
Senior Electrical Engineer
-
Apr 2020 - Present
-
-
-
Sabbour Consulting
-
Egypt
-
Architecture and Planning
-
300 - 400 Employee
-
Senior Electrical Engineer
-
Aug 2018 - Mar 2020
-
-
-
Otaishan Consulting Engineers
-
Saudi Arabia
-
Architecture and Planning
-
100 - 200 Employee
-
Senior Electrical Engineer
-
Aug 2015 - May 2018
Project: TBC ( Tatweer Building Company), Makkah Packages CP1 & CP2 Program Manager: AECOM Responsibility & Duties:- Review and approve the material documents, shop drawings, and sample submittals. Attend all required meetings and conduct special meetings to resolve problems. Monitor the site progress and ensure compliance with standards and specification required by the client. Planning the work efficiently and organizing the site facilities in order to meet agreed on deadlines Ensure that work procedures and method of statement for activities are prepared and followed during work execution. Resolve any unexpected technical difficulties and other problems that may arise. Review and approve the payment certificate requests before formal submit to Owner. Prepare any reports as required. Witness and conducted factory visit and test of electrical equipment prior to delivery at site. Show less
-
-
-
-
Electrical Projects Engineer
-
Jan 2014 - Jul 2015
Prepare and submission of the Electrical materials & shop drawings to a consultant for approval. Day-to-day management of the site, including supervision and monitor the site labor force and coordinate the work of the subcontractors. Optimize costs at all stages, and achieve total cost of the project within budget. Coordination between various disciplines/contractors to ensure construction quality and design compliance. Coordinates any discrepancies on shop drawings between the site and technical office. Ensure that the work on site is according to the approved electrical drawings and submittals. Ensure that the subcontractor work progress is according to the project schedule. Prepare and interact with project manager / Consultant for clarification in design/ RFIs etc. Liaise with the foreman to ensure that all labors, materials, and equipment are available when required. Follow the safety regulations and ensure the standard is applied. Show less
-
-
-
Ökoplan
-
Egypt
-
Architecture and Planning
-
100 - 200 Employee
-
Electrical Engineer
-
Oct 2011 - Dec 2013
Review and approve the material documents and sample submittals. Review and approve the shop drawings and as built drawings submittals. Inspect the materials delivered on site to make sure that are in accordance with the project specifications. supervise and inspect all the Installation of electrical distribution works and low current systems done by the contractor. Attend all required meetings and conduct special meetings to resolve problems. Monitor the site progress and ensure compliance with standards and specification required by the client. Ensure that all materials used and work performed are as per specifications. Planning the work efficiently and organizing the site facilities in order to meet agreed on deadlines. Oversee quality control on site. Ensure that work procedures and method of statement for activities are prepared and followed during work implemented. Resolve any unexpected technical difficulties and other problems that may arise. Review and approve the payment certificate requests before formal submit to Owner. Prepare any technical reports as required Witness and conducted factory visit and test of electrical equipment prior to delivery at site. Show less
-
-
-
-
Senior Electrical Engineer
-
Jul 2010 - Oct 2011
Cost Estimation for the tender projects and Optimize Costs for in hand projects. Prepare the commercial and technical offers for the tender projects. Review the Takeoff Quantities for Projects. Prepare the Shop drawings and Material submittals for in hand projects. Review the design drawings for some office buildings, villas& chalets for palm hills and Hacienda Bay in North Coast project. Optimize costs at all stages, and achieve total cost of the project within budget. Liaise with the site engineer to ensure that all labors, materials, and equipment are available when required. Show less
-
-
-
MAK Engineering Consultants
-
India
-
Civil Engineering
-
1 - 100 Employee
-
Electrical Engineer
-
Jun 2006 - Jun 2010
Review and coordinate design drawings with other disciplines. Review shop drawings and materials on the site. Inspect work execution, installation, quality, testing & commissioning in accordance with project specs/drawings. Attend all progress & technical meetings. Prepare Daily, weekly & monthly Reports for work progress . Projects: - Melia sharm Hotel& Resort- Sharm El Sheikh-Egypt (4.5 MVA + 700 KVA Standby Generator). - Melia sharm Residential - Sharm El Sheikh-Egypt (3 MVA + 300 KVA Standby Generator). - Marvel City Residential Buildings–New Cairo-Egypt (3 MVA + 300 KVA Standby Generator). Show less
-
-
-
Synchro Misr
-
Egypt
-
Appliances, Electrical, and Electronics Manufacturing
-
1 - 100 Employee
-
Design& Quality Control Engineer
-
Jun 2005 - Jun 2006
Responsible for Design the layout of low voltage power distribution switch boards (Merlin Gerin Prisma P&G Ranges) for the following switch boards: Main distribution switch boards until (3out of 5) Synchronizing panels until (4 Supply) A.T.S panels until (1600 A) Power factor correction panels until (500 KVAR) Motor starter panels ( D.O.L & STAR – DELTA) Responsible for Design the layout of low voltage power distribution switch boards (Merlin Gerin Prisma P&G Ranges) for the following switch boards: Main distribution switch boards until (3out of 5) Synchronizing panels until (4 Supply) A.T.S panels until (1600 A) Power factor correction panels until (500 KVAR) Motor starter panels ( D.O.L & STAR – DELTA)
-
-
-
-
Electrical Site Engineer
-
Nov 2003 - Jun 2005
Responsible for Installation the electrical distribution systems (Power, Lighting and Fire alarm systems). Liaise with the foreman to ensure that all labors, materials, and equipment are available when required on site. Day-to-day management of the site, including supervise and monitor of the implemented works. Daily report about progress, noncompliance, and delay in work to the construction manager. Responsible for Installation the electrical distribution systems (Power, Lighting and Fire alarm systems). Liaise with the foreman to ensure that all labors, materials, and equipment are available when required on site. Day-to-day management of the site, including supervise and monitor of the implemented works. Daily report about progress, noncompliance, and delay in work to the construction manager.
-
-
Education
-
Minia University
Bachelor’s Degree