Hamada Gamal

senior site supervision electrical engineer at Shaker Consultancy Group
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Cairo, Egypt, EG

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • Egypt
    • Construction
    • 700 & Above Employee
    • senior site supervision electrical engineer
      • Apr 2017 - Present

      -Review the construction contractors’ shop drawings and material submittals.-Perform quality control and ensure that the site works are carried out in accordance with the contract requirements-Inspect the works and issue site instructions as necessary-Review contractor’s correspondence and submittals and issue replies within the contract stipulations.-Participate in progress, technical and coordination meetings. -Overview the construction contractors’ installation, construction methods and execution of the works and ensure that these works are performed according to the contract documents. -Overview the testing during the construction period. Show less

    • Senior Electrical Engineer
      • Dec 2014 - Apr 2017

      Shop drawing for general power and lighting systems, lightning and grounding system, Medium Voltage, Low Voltage Networks, Road Lighting and Landscape Networks, cable routing system.Projects:• Madinah Hajj City in Al Madina Munawara.• Government Agencies Compound in Riyadh (GAC).

    • Construction
    • 700 & Above Employee
    • Senior Electrical Engineer
      • Sep 2011 - Dec 2014

      Shop drawing for general power and lighting systems, lightning and grounding system, Medium Voltage, Low Voltage, Networks, cable routing system. Projects : • Capital Market Authority (CMA). • Shamiyah Building and Sahat Piazzas & Bridges. • Shamiyah Building and Sahat Makkah Holy Mosque Hospital. • Haram Building. • Makkah First Ring Road and Bus Stations 1- Al Waqf Station-Kudai1 2- Kudai and Berkah Tunnels and Substations Shop drawing for general power and lighting systems, lightning and grounding system, Medium Voltage, Low Voltage, Networks, cable routing system. Projects : • Capital Market Authority (CMA). • Shamiyah Building and Sahat Piazzas & Bridges. • Shamiyah Building and Sahat Makkah Holy Mosque Hospital. • Haram Building. • Makkah First Ring Road and Bus Stations 1- Al Waqf Station-Kudai1 2- Kudai and Berkah Tunnels and Substations

    • Electrical Engineer
      • Jan 2010 - Sep 2011

      Design and shop drawing for general power and lighting systems, lightning and grounding system, Medium Voltage, Low Voltage, Networks, cable routing system. Design and shop drawing for low current systems (Data, Tel., CCTV, Sound, Fire Alarm, Access controle, Queuing, Intrusion Systems). Design and shop drawing for Building mangment system Quantity surveying. Cost estimation of (power&lighting& Data&Tel& CCTV &Sound &Fire Alarm lightning and grounding&distribution board &transformer&diesel generators). Projects: • King Saud Bin Abdulaziz University (KSA) 1- College of Nursing. 2- College of Applied Science. 3- Administration Building. 4- Research Facility Building. • KSA Defense Ministry Officer Building. • Administration Building Hamad Al Atea Defense. (Qatar) • Alobidely Factory Civil Defense (Qatar) • Al Qassim Campus (KSA) • Al Qassim University (KSA) 1- College of Pharmacy. 2- College of Dentistry. 3- College of Applied Medical Science. 4- College of Science & Arts Type (a) 5- College of Science & Arts Type (b) • King Saud Bin Abdulaziz University (BMS) 1- College of Medicine. 2- College of Nursing. 3- Utility Building. • King Faysal Hospital (KSA) 1- ITA Building. • Kaser Shiek Ahmed B Ali Althany (Qatar) • Alqanater country Club (Egypt) • Suhage Hospitals (Egypt) 1- Gerga Hospital. 2- Dal Alsalam Hospital. 3- Almansaa Hospital. Show less

    • Site Supervisor Engineer
      • Jan 2009 - Jan 2010

      Quality Control Engineer (ELTBEEN 2X350M STEAM STATION) • Termination of all power &control cables. • Test of switchgear & MCCS panels. • Megger test of low voltage cables. • Medium voltage test of cables. • Megger test of bus bare • Construction of cable trays & ladders. Quality Control Engineer (ELTBEEN 2X350M STEAM STATION) • Termination of all power &control cables. • Test of switchgear & MCCS panels. • Megger test of low voltage cables. • Medium voltage test of cables. • Megger test of bus bare • Construction of cable trays & ladders.

Community

You need to have a working account to view this content. Click here to join now