Hamad Alaeddine

Head Of Operations at QD-SBG Construction
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Doha, Qatar, QA

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • Qatar
    • Construction
    • 500 - 600 Employee
    • Head Of Operations
      • Jan 2020 - Present

      Key Project: CP07B Lusail Plaza, Infrastructure Works, LRT Station, Public Car Parks & Landscape Responsibilities:Full execution of Package CP07B comprising of: •Infrastructure, LRT Station, Public Car Park, Landscape including Urban Features and Enabling Works. •Tunnel along Road A1 (Two Levels) •Combined LRT Station Structural and Civil Works •Multi-storey Underground Car Park •Bridge at Junction No.19 •Six 11KV Substations •Substations recently relocated outside the limit of the Project •3 Substations inside the Car Park •Infrastructure Utilities (Integration of the remaining networks including Electrical, Mechanical, Sewage, Irrigation, Storm and Tunnel Drain Network) •Integration of Landscape and Public Realm Features.

    • Head Of Operations
      • Mar 2011 - Present

    • Project Director of ISF Project
      • Dec 2011 - Aug 2013

      Internal Security Forces Project20 barrack buildings, 5 general stores, and 5 headquarter buildings, total build-up area of 410000m2, with all related infrastructure, road works, soft and landscaping, and all substations equipment installation, testing, and commissioning.

    • Austria
    • Construction
    • 700 & Above Employee
    • Deputy Project Director
      • Aug 2013 - Dec 2019

      Key Project: Qatar Rails - Green Line Underground (GLUG) and Green Line Elevated & AT Grade (GLEAG). Full implementation of the project which consists of:GLUGTotal of 450,000 m3 of heavy civil concrete works comprising of:• 6 stations • Excavation up to a depth of 40m complete with proper dewatering And shoring system. • Concrete structures • Rafts up to 300 m3• Walls up to 1100 m3• Slabs up to 1200 m3• Precast roofing system • 6 Emergency escape shafts depth up to 50m with proper dewatering system and concrete lining, followed by elevated shaft and escape stairs. • Shelter and Entrance boxes to stations with underground pedestrian underpasses.• One trough of heavy raft, walls and closed tunnel at the intersection between Greenline Elevated and the Greenline Underground Tunnel. • One underground 4-storey 30m deep mechanical building to cater for the main electro- mechanical equipment driving the Greenline Metro. GLEAG The project comprising of 1 station and 2.78 kilometers (km) of elevated and 0.46 km at-grade.

    • Greece
    • Construction
    • 700 & Above Employee
    • Site Project Manager (Infrastructure and Building)
      • Oct 2008 - Dec 2011

      Key Project: Princess Noura University 2.2 billion USD All related infrastructures including but not limited to elevated groundwater tanks, culverts,Wet & dry utilities tie-in connection authorities related inspection and testing & commissioning.

    • Senior Construction Manager
      • Jun 2006 - Oct 2008

      Key Project: Gas to liquid, GTL project Ras Laffan, Qatar Value: 1000M USD, heavy civil and 25 industrial buildings, with all related infrastructure, in addition to the full construction of a camp, and related facilities to 6500 people.  Plans and supervises the major functions of the construction which includes the responsibility for the planning and the coordination with all disciples. Organization of Manpower, equipment, material supplies, and sub-contracted services toward the proper completion of the work on schedule with approved drawings, specifications, cost and quality limitations.  Monitors Sub-contractors at each stage of the work to ensure the proper compliance with all technical aspects of the contracts through both individual contacts and co-ordination meetings.  Review all Method Statements dealing with his area of responsibility prior to issue the client.  Participates in or (subject to the Project Director delegation) leads in discussion of all contractual matters related to subcontractors employed on his section of the project.  Check and authorizes all claims for payment from all sub-contracts involved in his section of the project to assure accuracy and the proper contractual obligations are met. Directs the procurement of permanent and non-permanent materials required for the proper completion of the work schedule.  Directs and supervises construction managers in the performance of all aspects of their work. Exercise strict control over cost of construction particularly the use of labor, materials and equipment. This includes reviewing variances from budgeted expenditures and recommends/initiates action to bring them under control. Monitors construction progress on a daily, weekly and monthly basis and provides input to the regular reports of Projects.

    • Site Project Manager
      • Sep 2004 - Jun 2006

      Key Project: Low Sulphur Diesel Production - BAPCO (LSDP), Bahrain Construction of a Hydrocracker, Hydrogen & Sulphur Plants for low Sulphur Diesel Production (LSDP) at a Capacity of 40000 BPD, & EPC of 8 Control Buildings & Substations Report to Project Director. Responsibility Includes:  All civil related works to the construction of the process units comprising of a sulphur plant, a hydrocracker plant, and hydrogen plant as well as the offsite and flare areas. All civil related works for all underground services.  Construction of parking facilities and service roads.  Supervision of the construction of a 2000m2 control building, workshop, 3 substations, 2 workstations, 1 A/C plant.

    • Construction Manager
      • Apr 2002 - Sep 2004

      Key Project: Dubai Airport Air wing Facilities (DAF), Dubai Architectural and finishing works to 8 nos. Hangers and Admin Building, Engineering Building, Royal Terminal, and Main Gate House along with their E&M works. Associated structures: Water Tanks, Fuel Tanks, Workshop, Laundry, Canteen Stores, etc... External works: Horse Loading facilities, Explosive Stores, infrastructure, and road works.

    • Construction Manager Civil
      • Nov 2000 - Apr 2002

      Key Project: Dubai International Airport improvement Phase IExpansion of Nadd Al Hammar / Beirut Roads Tunnel (DAIP)The Project comprises the construction of approximately 2 kms of tunnel by cut and cover method in association with the reconstruction of both junctions at the North and South Sides including the construction of three Bridges, two of a length 200m and a third of 400m. The tunnel will replace Rashedeya Road in which all Utilities with the corridor had to be diverted accordingly. The Project will also include the Construction of Roadway, Signage Landscaping, Street Lighting Irrigation and Drainage Systems, Relocation of Utilities and all activities related to the tunnel safety such as Fire Detection and Alarm System, Variable Message Sign, Carbon Monoxide and Smoke Detection System, Closed Circuit Television System as well as Ventilation System.

    • Zone Manager
      • Oct 1998 - Nov 2000

      Key Project: The Golden Pyramids Plaza Project (GPPH), Cairo, Egypt. A Joint Venture Project with ORASCOM - Egypt being the Joint Venture Partner. The scope of work covers:  A Five-star & a Four-Star Hotel (Intercontinental & Holiday In)  Shopping Center, including Cinemas, Bowling Center and Ice-Skating Ring and Theme Park  Residential/Office Towers, Medical Center and Health Club, Gymnasium and Underground ParkingResponsibilities:Controlling and coordinating the full execution turnkey of two residential towers, two office buildings and part of the commercial center, structural and finishing works, ensuring that work is being carried out in accordance with specifications and crafty standards specifying working methods and interpreting specifications and formal drawing as necessary, controlling the execution of the infrastructure works of the project and all Related external works with all necessary services for the different buildings.

    • Project Engineer
      • Feb 1995 - Oct 1998

      Key Project: Beirut International Airport Project (BIA) A Joint Venture Project with HOCHTIEF, works includes the construction of a new 3.400m-runway of which 1,900 m project into the sea. New terminal buildings of 170,000 m2 covered area which incorporates the aircraft docking structures. Rehabilitation of five existing buildings, a new control tower, 16 km of new taxiways, an underpass and extensive runway lighting. All buildings include full state-of-the-art electro-mechanical systems.Controlling & coordinating the execution of the following work packages using a large construction crew of craftsmen of various trades and laborers:  Casting and erection of all precast units requires for the cladding of buildings. Main terminal and the underpasses posttensioning precast work for the a/head bridges. Road works with related hard and soft scraping leading to the main terminal. Building and to the various airport facilities with the surrounding parking lots. Road works for section 2, section 3, underpasses forming the main OUZAI. Highway with the related a/head bridges.Construction of the east wing of the main terminal with full finishes in coordination with all disciplines.

    • Section Engineer, Procurement and Cost Control.
      • May 1993 - Feb 1995

      Key Project: Maintenance Facilities Building & Concrete Repair Works at Umm Al Nar Power & Desalination Plant, Abu Dhabi. Construction of Maintenance Facilities Building. Upgrading and repair works for concrete and reinforced concrete structures.

    • Civil Engineer (Office), Procurement and Cost Control.
      • Dec 1991 - May 1993

      Key Project: Refinery Expansion II Civil Works & Building Construction, Umm Al-Nar, Abu Dhabi, the scope of works consists of the construction of a refinery main control building, 5 substations, pipe racks, sleepers, complete with all infrastructure works.

    • Civil Engineer, Procurement and Cost Control.
      • Jan 1989 - Dec 1991

      Key Project: Tactical Area, Al Bahrain Island, Abu Dhabi. The project scope of work involves the construction of a tactical area facility, complete with its infrastructure and the installation of 2 No’s Reverse Osmosis Desolation units of 25,000 imps. Gals, all with all the associated electromechanical works.

    • Site Engineer
      • Sep 1987 - Dec 1988

      Key Project: Part of the site team responsible for the execution of a 6000 m2 commercial center in Beirut Lebanon. Key Project: Part of the site team responsible for the execution of a 6000 m2 commercial center in Beirut Lebanon.

Education

  • American University of Beirut
    Bachelor of Engineering - BE, Civil Engineering
    1982 - 1987

Community

You need to have a working account to view this content. Click here to join now