Hakim Arari

Manager at KERN Consulting
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Fontenay-sous-Bois, Île-de-France, France, FR
Languages
  • Anglais Native or bilingual proficiency
  • Russe Native or bilingual proficiency
  • Portugais Full professional proficiency
  • Français Native or bilingual proficiency

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • France
    • Business Consulting and Services
    • 1 - 100 Employee
    • Manager
      • Oct 2023 - Present

    • France
    • Business Consulting and Services
    • 500 - 600 Employee
    • Consultant senior
      • Sep 2022 - Sep 2023

      Business support and digital transformation of our clients in various sectors of industry and professional services (including CPG, Luxury, Cosmetics, Industry and Life Science, etc.) Business support and digital transformation of our clients in various sectors of industry and professional services (including CPG, Luxury, Cosmetics, Industry and Life Science, etc.)

    • Entrepreneur
      • Apr 2021 - Apr 2022

      Entrepreneur/Associate Planning, implementation and management of spiced rum production, supply and logistics (800L) Redaction of the company's financial records and business case. Creation, production and launch of the website. Entrepreneur/Associate Planning, implementation and management of spiced rum production, supply and logistics (800L) Redaction of the company's financial records and business case. Creation, production and launch of the website.

    • France
    • Renewable Energy Equipment Manufacturing
    • 700 & Above Employee
    • Master Scheduler
      • May 2017 - Oct 2019

      • Analysis of Supply chain (Manufacturing & sourcing) Lead times in order to provide the ITO proposal schedule and delivery dates in accordance with the workload and capacity • Set up and drive a slot plan per main product line with fencing category: from repeat to NPI project. • Drive a long term Sourcing to identify requirement for new vendor qualification • Drive a Product Lead time analysis and drive for Lead time reduction initiative to meet sales/marketing demand • Load Forecast Order in MRP and identify them in the slot plan, vendor LOB, workload • Perform “What if” analysis and submit proposal & action plan to management • Perform Advance release analysis with proposal & action plan to management • Implement a Long term Manufacturing Start Of Work focusing on Engineering on time delivery. • Participate in the set up of the Planning BOM initiative at Offshore • Implement and develop cross-functional status for milestone progress for Engineering, Sourcing and Manufacturing. Show less

    • United States
    • Hospitals and Health Care
    • 700 & Above Employee
    • Design Transfer Leader
      • Oct 2015 - Mar 2017

      Supplier facility transfer project manager: Coordination between all party involved in tough environment, scheduling, monitoring, EHS Lean action work out leader: Layout of the new facility, communication improvement with supplier. Supplier facility transfer project manager: Coordination between all party involved in tough environment, scheduling, monitoring, EHS Lean action work out leader: Layout of the new facility, communication improvement with supplier.

    • United States
    • Electric Power Generation
    • 700 & Above Employee
    • Operations Management Leadership Program Associate
      • Apr 2013 - Sep 2015

      • 4th rotation: Repair cell supervisor Gas turbine repair center (Belfort, France) o Indirect management of 10 operators, solving EHS cases, supplier management on 10 contracts o Implementation of metrology department (205k€ investment split over 5 projects) o Modification of the line layout (141m2 optimization) • 3rd rotation: CPM assistant (Fot, Hungary) o Implemented forced outage quality documentation of each site of central east Europe. o Cost control analysis. Identified a gap of 7k$ between estimation and average outage costs. • 2nd rotation: SQE for small machined and fabrications (Veresegyhaz, Hungary) o 33 qualifications approved. 361k$ deflation savings, ~80 qualifications managed simultaneously o 12 QCR and 7 SDRs within below 20 days. 5,2 days in average. 10k$ in vendor bill back • 1st rotation: Junior project manager Russian Joint-Venture (Belfort, France) o Monitoring and follow up of 40 different trainings for headquarters functions o Process maps level 2 + SIPOC of all functions of the Russian JV. Used as a business structure. Show less

    • United States
    • Industrial Machinery Manufacturing
    • 700 & Above Employee
    • Intern Lean 6 sigma
      • Sep 2012 - Feb 2013

      Conducting lean tools (5S and TPM) on the workshop. - Leading the implantation of new tools for NPI project. - Leading a project about a better use of protections on critical surface. Achievements: TPM workgroup facilitator and restart 5S and TPM dynamics on the site. Conducting lean tools (5S and TPM) on the workshop. - Leading the implantation of new tools for NPI project. - Leading a project about a better use of protections on critical surface. Achievements: TPM workgroup facilitator and restart 5S and TPM dynamics on the site.

Education

  • Arts et Métiers ParisTech - École Nationale Supérieure d'Arts et Métiers
    Diplôme d'ingénieur, Mécanique
    2008 - 2013
  • Universidade Federal do Espírito Santo
    Intercambio
    2012 - 2013
  • ENI Ecole Informatique
    Concepteur Développeur d'applications, Informatique
    2019 - 2021

Community

You need to have a working account to view this content. Click here to join now