Hajiar Yuliana
Lecturer at Universitas Jenderal Achmad Yani (Unjani)- Claim this Profile
Click to upgrade to our gold package
for the full feature experience.
Topline Score
Bio
Experience
-
Universitas Jenderal Achmad Yani (Unjani)
-
Higher Education
-
1 - 100 Employee
-
Lecturer
-
Oct 2017 - Present
-
-
-
PT. Omni Hotelier Internasional
-
Indonesia
-
IT Services and IT Consulting
-
1 - 100 Employee
-
Team
-
Aug 2022 - Present
-
-
-
GCI
-
United Kingdom
-
IT Services and IT Consulting
-
1 - 100 Employee
-
RNP Engineer
-
Mar 2018 - Jan 2019
XL NPM West Java XL NPM West Java
-
-
-
China Communications Services
-
China
-
IT Services and IT Consulting
-
200 - 300 Employee
-
RNP Engineer
-
Mar 2017 - Mar 2018
For XL NPM West Java For XL NPM West Java
-
-
-
Lexcorp Indonesia
-
Telecommunications
-
1 - 100 Employee
-
RNP Engineer
-
Mar 2015 - Feb 2017
For Huawei Service - XL Project For Huawei Service - XL Project
-
-
-
Nexwave Technologies
-
Singapore
-
Telecommunications
-
500 - 600 Employee
-
RF Planner
-
Jan 2014 - Jan 2015
-
-
-
UCE International Group
-
Malaysia
-
Telecommunications
-
200 - 300 Employee
-
RF Planner
-
Aug 2013 - Dec 2013
-
-
-
-
2G/3G RF Planner
-
May 2013 - Jul 2013
-
-
-
-
2G/3G RF Planner
-
Feb 2012 - Apr 2013
. Prepare and create ROC for the Newsite integration, Hicap, or upgrade site.· Prepare and create PCR for the Newsite integration.· Prepare and create Freq-Plan Database (Frequency Plan) and Site Data.· Create and prepare GCELL update.· Create CRF to repair performance a newsite if it has a bad performance.· Prepare official memorandum (nodin) for the Newsite integration, dismantle’s site, rehoming, repainranting, and lac splitting.· Plan for BSC Activity, such as rehoming, reparenting, or lac splitting.· Create database for BSC Activity (rehoming, repairanting, and lac splitting).· Planning of frequency for site based on NSN rules. And also determine the preparation for site integration. (such as determine the BCF_ID, BTS_ID, NCC, BCC, HSN, MAL_ID, etc)· Retune frequency, to minimize co-channel and coadjacent interference.· Create and prepare RNP Report.· Using Netact Planner / Atoll for planning activity.. Planning Global Frequency Planning (GFP) from Baseband to SFH. Prepare neighbour for swap activity (Only for swap activity)· Consistency check and audit neighbor after swap execution.
-
-
Drive Test
-
Nov 2010 - Jan 2012
· Support 2G and 3G RF Engineer for Data collection through performing drive test for Changed out network using Nemo Outdoor 5.30.4 and Tems Investigation 8.0 for West Java area· Performing drive test for : a.new site to verified coverage and quality and make sure no swap feeder, overshoot coverage, b drive test of packet data, Including (GPRS, EDGE,UMTS R99 and HSDPA), c Prepare Map Info/Nemo Analyze/Actix presentation after drive test to figure out network coverage and quality, d Before and After Rehoming Drive Test e Before and After LAC Splitting f Dual Transfer Mode (DTM) g Isho Trial Verification h RU20 i ISHO Cancelation & ISHO 2G-3G· Perform walk test (indoor) using tems 8.0.4, Nemo Outdoor 5.30.4, Generate report & Analyze walk test result uses Mapinfo and Nemo Analyze· Reporting the result of walktest (indoor) and result ofdrivetest· Take stationary call test (CS voice call, CS Video Call,PS Data call-FTP download, R99 PS UL/DL, & HSDPAThroughput)· Perform VIP Complaint drive test due to customer request. Generate the report & Analyze drive test result
-
-
-
PT. Fast Technology
-
Jakarta
-
Admin Project
-
Sep 2010 - Oct 2010
-
-
Education
-
Institut Teknologi Bandung (ITB)
Master of Engineering (M.Eng.), Telecommunications Engineering -
Universitas Jenderal Achmad Yani (Unjani)
Bachelor's degree, Telecommunications Engineering -
Politeknik Negeri Bandung
Diploma III, Telecommunication Engineering