Hafiz Waqas Haider Shah

Sr. Manager Projects at OLGA International Limited
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
PK
Languages
  • English Professional working proficiency

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

5.0

/5.0
/ Based on 2 ratings
  • (2)
  • (0)
  • (0)
  • (0)
  • (0)

Filter reviews by:

Ghulam Jabir

Waqas Haider is an experienced dynamic management professional, always enthusiastic to learn and innovate new ideas in the job content. Highly disciplined guy with a pleasing personality. I wish him good luck in his career.

Zohaib Akram

It has been sheer pleasure to WORK alongside Waqas Haider, a person with an everlasting positive attitude, the fastest turnaround time to finish up the job.Very forthcoming professional with an unbound energy! Wish you good luck!

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • Sudan
    • Engineering Services
    • 1 - 100 Employee
    • Sr. Manager Projects
      • May 2022 - Present

    • Saudi Arabia
    • Oil and Gas
    • 700 & Above Employee
    • Execution Manager
      • Dec 2019 - Dec 2021

      Successfully managed Turnaround at Isocyanate Area of SADARA in 2021. Successfully completed SMP work related to Multi-chem bathing plant by Fluor/Halliburton in 2020-21. Successfully managed Turnaround of Block 2 at SATORP, Jubail KSA in 2019. Successfully managed Turnaround at Isocyanate Area of SADARA in 2021. Successfully completed SMP work related to Multi-chem bathing plant by Fluor/Halliburton in 2020-21. Successfully managed Turnaround of Block 2 at SATORP, Jubail KSA in 2019.

    • Project Manager
      • Dec 2013 - Nov 2019

      ALHAMDULILLAH, by the grace of Almighty ALLAH, we have successfully completed the following projects/shutdown in ADNOC Group. 1. Expansion of BAB Gas compression Project (Phase II). Warranty shutdown for miscellaneous Mechanical works at Compressor Station # 4 and MOV's repair works at RMS 2 & 3. 2. Civil and Mechanical works for HP Flares Modification at ADNOC Onshores, ASAB. 3. Maintenance & cleaning of heat exchangers at Green Diesel Plant with GS E & C at ADNOC RUWAIS REFINERY. 4. Piping Installation works for Desalination Unit at Carbon Black Delayed Coaker Project with Samsung Engineering at ADNOC RUWAIS REFINERY. 5. Piping Fabrication & Erection work for Tankage & Interconnected Piping with Daewoo E & C at ADNOC RUWAIS REFINERY. 6. Replacement of Flare Tips and associated Piping works, E & I work with Dome Oilfield at ADNOC Onshores, BAB Plant. 7. Maintenance and cleaning of Fuel Tanks with GS E & C at ADNOC Distribution Terminals. Main responsibilities include Estimation of Projects/Shutdowns Execution of projects as per scope, schedule, and budget Ensuring that implementation of Quality and HSE policies as per project requirements Plan and prepare construction schedules and milestones and monitor progress against established schedules. Accountable for recruitment, competency assessment, appraisals, and development of subordinates. Monitoring & controls of projects cost. Organize and manage the project resources. Making sure that all the aims and quality standards of the projects are met. Monitoring sub-contractors to ensure that project guideline are maintained. Show less

  • EKL
    • UAE
    • Manager Project Planning and Coordination
      • Feb 2013 - Nov 2013

    • Saudi Arabia
    • Oil and Gas
    • 100 - 200 Employee
    • Section Head Projects and Plant Services
      • Apr 2010 - Jan 2013

      ABIS was providing maintenance / shut down / turn around ( Mechanical / Electrical / Instrumentation/civil) services to Petrochemical, Oil & Gas and Fertilizer companies across KSA. Successfully completed the following Projects & Turnarounds during my stay at ABIS: Stationery Equipment Services, AR-RAZI Plant 1 and 2 CMA line replacement at Plant 1 & 2, AR-RAZI Replacement of 20” RG line from carbon steel to Stainless steel in plant 1, (EPC Project). AR-RAZI Major Mechanical Repair Work in DR Module C, Hadeed Plant (SABIC) Overhauling of Furnace Charging in DR Module E, Hadeed Plant (SABIC) Plant J06/J78/J85 Columns/Vessels/Drum/Filters cleaning and maintenance during Mega T & I, Saudi Aramco Refinery, Ras Tanura Mechanical work for Heat Exchangers and Fin Fans during Mega T & I, Saudi Aramco Refinery, Ras Tanura Mechanical work for Heat Exchangers, drum and column in Ibn-Baytar, SAFCO Replacement of Piping and Valves in EG and PE Area, SHARQ Plant (SABIC) Opening and HPWJ Cleaning of Heat Excahngers at Petro-kemya Plant (SABIC) Strip-out and re-manifolding of Gas well heads with Saudi Aramco. Replacement of sub-standard underground CS firefighting by RTR pipeline at Juaymah Tank Farm, Saudi Aramco Cleaning, maintenance of stationery equipment's at unit 72 Ras Tanura refinery, Saudi Aramco Post Turnaround Emergency Flare Line Project at Saudi Aramco Mobile Refinery, Yanbu. Show less

    • Dy. Manager Projects Coordination
      • Oct 2008 - Apr 2010

      Worked as Project Coordinator for 225MW combined cycle power plants construction (02 No's). Scope of work was installation of equipment and piping work including painting and chemical cleaning of piping. Major responsibilities include the following: To assist Head Projects in all project related matters and responsible for project planning, Execution, quality control & assurance, procurement and inventory matters. To coordinate in mobilization and demobilization of site resources as per schedule. To conduct regular site meetings with professionals, including, site engineer, planning engineer, foremen, subcontractors, and with the client. To monitor cost, execution schedule and utilization of the resources at site. Ensuring the project runs to schedule and to budget, and finding solutions to problems that may cause delays, such as the late arrival of materials. To take initiative for improvement in project management operations. Preparation and submission of monthly Invoice in coordination with planning department and verification of invoice. Responsible for project site accounts and day by day site expenses. Responsible for all coordination jobs of more than 900,000 man-hours project with client, sub-contractor and Head Office. Show less

    • Germany
    • Industrial Machinery Manufacturing
    • 700 & Above Employee
    • Project Coordinator
      • 2009 - 2010

    • Pakistan
    • Construction
    • 700 & Above Employee
    • Field Engineer
      • Dec 2006 - Aug 2008

      Worked as Site Engineer for tie-in shut down at Abu Dhabi Polymers Company Limited and long term shut down in 2007-2008 at Abu Dhabi Gas Industries Limited. Worked as Site Engineer for tie-in shut down at Abu Dhabi Polymers Company Limited and long term shut down in 2007-2008 at Abu Dhabi Gas Industries Limited.

    • Oil and Gas
    • 400 - 500 Employee
    • Assistant Engineer (UFG)
      • Apr 2005 - Nov 2006

      Worked as Assistant Engineer in UFG-C Department (Distribution). Job description includes the following: Leakage Rectification of TBS’s, DRS & CMS’s inside the region Checking of Industrial consumers of the region, this includes leakages, pressure, Flow rate, gas consumption pattern etc. Pressure Profiling and load management of the system. EVC Data downloading from the consumer meter station and analyzing of hourly, daily and monthly data. Joint verification of Pressure, Temperature and Flow charts by planimeter along with transmission department. Calibration of Pressure, Temperature and Flow recorders at Sales Meter Station Reconciliation of data received from transmission and consumers of distribution system Show less

Education

  • Ghulam Ishaq Khan Institute of Engg Sciences & Technology
    B.E, Mechanical
    2000 - 2004

Community

You need to have a working account to view this content. Click here to join now