Hafiz Muhammad Afzal

Project Manager at China Petroleum Engineering & Construction Corporation
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
PK
Languages
  • English -
  • Arabic -
  • Urdu -
  • Punjabi -

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • Design Services
    • 100 - 200 Employee
    • Project Manager
      • Feb 2011 - Present

      Produced Water re-injection Project included but not limited to do the following jobs. Steel structure work for pipe rack, bridge, equipment foundation, equipment shed shelter & building foundation fabrication, welding & erection Construction of Buffer Tank, Recovered Oil Tank & Clarifier Tank fabrication & erection, tanks dia between 5 Mtr to 20 Mtr & height 11 Mtr Construction & installation well heads, sand traps, flow line & Oil Gathering Manifold (OGM’s) Pr-commissioning & commissioning of all mentioned above. Coordination with Client PDOC/PMC regarding any change in design modification  Analyze and evaluate the technical, financial and economic feasibility of development projects, determine and implement procedures, feasibility work, evaluation, tender and contract documents and other work and capital assets & maintenance requirements based on Cost Benefit Analysis.  Prepare Project Budget based on priorities, findings of project appraisals, availability of funds, the preparation of budget estimate and performance measures, evaluation methodologies and standards.  Involved at a Macro level all engineering designs, tender documents, and construction contracts, to ensure that Projects are being executed in accordance with the agreed Projects specification, and targets through up-to-date Project tracking systems.

  • SHAUKAT AND RAZA
    • Algeria, Laghouat Villaya
    • Project Manager
      • May 2009 - Jan 2011

      completed & commissioned of 106.2 Km 12”/8” at various location Gas Pipeline Projects at Laghouat Villaya. Project Value 26,169,000 US$ Laying of cross-country pipelines 8”-12” in dia includes selection of WPS, dealing with Algerian Clients SONELGAZ during construction & commissioning. Technical & Financial responsibilities:  Analyze and evaluate the technical, financial and economic feasibility of development projects, determine and implement procedures, feasibility work, evaluation, tender and contract documents and other work and capital assets & maintenance requirements based on Cost Benefit Analysis.  Prepare Project Budget based on priorities, findings of project appraisals, availability of funds, the preparation of budget estimate and performance measures, evaluation methodologies and standards.  Involved at a Macro level all engineering designs, tender documents, and construction contracts, to ensure that Projects are being executed in accordance with the agreed Projects specification, and targets through up-to-date Project tracking systems.

    • Pakistan
    • Oil and Gas
    • 1 - 100 Employee
    • Sr. Supervisor QA/QC
      • Oct 2002 - Apr 2009

      Technical Key roles & responsibilities:  Preparation of scope of work for third part inspection for Plant and Pipeline Inspections, all type of equipment inspection at Vendor premises, Cathodic Protection system.  Technical Bid evaluation for third party inspections, Cathodic Protection system, OPII Gas LPG Cylinder, LPG Bullet Tanks.  Updating of QA/QC Procedure and formats and ensure to implementation at site.  QA/QC internal documentation audit and site Quality audit as per documentation.  Training plan for field staff  Evaluation & qualification of Vendor’s and Contractor Financial responsibility • Annual budget preparation • Preparation of Cost estimate and cost control • Technical verification of invoices • Negotiation with Vendor/contractor to reduce cost without compromising on Quality. • To control loss and waste of company resources • Annual review appraisal for site QA/QC Staff 1. Gas Pipeline, Gas Plant,ETF,EPF & LPG Plant projects, Storage Tank according to API-650 inspection during construction and installation phases at site from contractor. 2. Inspection of various cross-country pipelines from 4”-8”in dia and 4-60 km in length includes selection of WPS, coordination during construction & commissioning in north and south of Pakistan.

    • Malaysia
    • Utilities
    • 700 & Above Employee
    • Site Incharge/Pipeline Incharge
      • May 1997 - Sep 2002

      Responsibilities for Dehydration Plant, Amine Plant and Gas Polishing Plant. All project matter related to construction, material, commissioning & operational activities of Gas Treatment Plant Work on project scheduling, construction, contractual matters & quality specification of Gas Treatment Plant. Coordinate with SNGPL regarding monthly gas invoices related Gas Treatment Plant metering system, Gas Analyzers according to required specification & standard Inspection of following equipments during installation as per standard & specification and responsibilities included during construction of Gas Treatment Plant. Ensure PQR & WQT according to ASME Sec IX Separation of unsaturated liquid from supplied Gas, Gas Metering by Orifice measuring system, Gas Dehydration Plant, Hydrogen Sulfide fixed bed Catalyst Polishing Plant, Hydrogen Sulfide removal plant by using Monodiethelen Amine (MDEA), Fire Fighting System, Gas Power Generation 700 KW (350 each) of two Gas Generator. Inspection of Storage Tank according to API-650 Standard. 30 km Gas Pipeline from OGDCL Qadir Pur Gas Field to Liberty Power Ltd. 30 km Natural Gas 12” API 5L X46 Pipeline from OGDCL Qadir Pur Gas Field to a (1x225 MW Combined Cycle Power Plant) at Daharki as per standard API-1104. Inspection of Construction activities related to Oil Storage Tanks Fabrication, Erection and Welding as per API 650.

    • United States
    • Construction
    • 400 - 500 Employee
    • Pipeline Engineer
      • May 1996 - May 1997

      Working as Pipeline Engineer for USA/PAKISTAN joint venture on a 364 km multi product 18”/16” API 5L X52 from Mahmood Kot to Machhiki for Pak Arab Refinery Limited. This project includes pumps and tank storage stations at Mahmood Kot, Faisal Abad and Machhiki. Responsibilities included: Daily welding Progress report, Trenching, Lowering-in, and backfilling report, weld inspection and repair marking in accordance with API-1104, Inspection of road, rail, canal and river crossing. Supplying information for as built drawings. Independently handling execution job for crossing of Canal and road (30 x-ing) by open cut and achieved the given target.

    • Engines and Power Transmission Equipment Manufacturing
    • 700 & Above Employee
    • Site Engineer
      • Sep 1995 - Apr 1996

      Working as Site Engineer for an Italian Engineering and Construction Company at the Oil Fired 4x323 MW, Hub-Co. Power Project at Hub Choki, Balochistan. Responsibilities included: Daily welding Progress report, daily welder status report, Inspection of Dye Penetrant Testing, welding GTAW & SMAW, fit-up and gap inspection, WQT according to ASME IX. Ensure PQR & WQT according to ASME IX correct filler wire and electrode being used, punch list and hydrostatic testing. Working as Site Engineer for an Italian Engineering and Construction Company at the Oil Fired 4x323 MW, Hub-Co. Power Project at Hub Choki, Balochistan. Responsibilities included: Daily welding Progress report, daily welder status report, Inspection of Dye Penetrant Testing, welding GTAW & SMAW, fit-up and gap inspection, WQT according to ASME IX. Ensure PQR & WQT according to ASME IX correct filler wire and electrode being used, punch list and hydrostatic testing.

    • Pakistan
    • Construction
    • 700 & Above Employee
    • Assistant Site Engineer
      • Nov 1992 - Jul 1993

      Working as Assistant Site Engineer for Engro Chemical Fertilizer Plant (ECPL) extension Project at Daharki (Sindh)Responsibilities included: Daily welding Progress report, daily welder status report, Inspection of Dye Penetrant Testing, welding GTAW & SMAW, fit-up and gap inspection, WQT according to ASME IX.Ensure PQR & WQT according to ASME IX correct filler wire and electrode being used, preparing of punch list and test package for hydrostatic testing.Inspection of Construction activities related to Oil Storage Tanks Fabrication, Erection and Welding as per API 650.

    • Assistant Site Engineer
      • Feb 1992 - Nov 1992

      Working as Assistant Site Engineer for Fauji Fertilizer Company (FFC-II) extension Project at Goth Machhi, Sadiq AbadResponsibilities included: Daily welding Progress report, daily welder status report, Inspection of Dye Penetrant Testing, welding GTAW & SMAW, fit-up and gap inspection, WQT according to ASME IX.Ensure PQR & WQT according to ASME IX correct filler wire and electrode being used, preparing of punch list and test package for hydrostatic testing.

    • NDT Technician
      • Jan 1990 - Jan 1991

      Working as NDT Technician with Jiacco Pakistan Pvt Ltd during Annual Turnaround at following Plants 1-Fauji Fertilizer Company (FFC-I) Project at Goth Machhi, Sadiq Abad 2-Engro Chemical Fertilizer Plant (ECPL) Project at Daharki (Sindh) 3-Kot Addu Thermal Power Project (Gas Turbine Units 11 to 15) Kot Addu. Responsibilities included: Inspection of Dye Penetrant Testing and Magnetic Particle Testing. Working as NDT Technician with Jiacco Pakistan Pvt Ltd during Annual Turnaround at following Plants 1-Fauji Fertilizer Company (FFC-I) Project at Goth Machhi, Sadiq Abad 2-Engro Chemical Fertilizer Plant (ECPL) Project at Daharki (Sindh) 3-Kot Addu Thermal Power Project (Gas Turbine Units 11 to 15) Kot Addu. Responsibilities included: Inspection of Dye Penetrant Testing and Magnetic Particle Testing.

Education

  • Govt Collage of Technology, Lahore
    Associate's Degree, Diploma of Associate Engineer, Mechanical
    1990 - 1992

Community

You need to have a working account to view this content. Click here to join now