Gursher Singh

Site Superintendent at Isle of Mann Property Group
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Langley, British Columbia, Canada, CA
Languages
  • English -
  • Punjabi -
  • Hindi -

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

5.0

/5.0
/ Based on 1 ratings
  • (1)
  • (0)
  • (0)
  • (0)
  • (0)

Filter reviews by:

Amol Jadhav

Gursher is good team player , who is expert project design n management. He work in project for designing equipment layout, PFD, P&ID, piping layout and project execution with HSE & Quality, GMP standard within timeline. Also he is expet preparing project progress report, schedule, etc.

You need to have a working account to view this content.
You need to have a working account to view this content.

Credentials

  • Supervising for Safety
    WorkSafeBC
    Jan, 2022
    - Oct, 2024
  • Construction Management and Supervision Fundamentals
    Professional Home Builders Institute
    Feb, 2019
    - Oct, 2024
  • Occupational First Aid Level 2
    WorkSafeBC
    Mar, 2019
    - Oct, 2024

Experience

    • Canada
    • Real Estate
    • 1 - 100 Employee
    • Site Superintendent
      • Feb 2019 - Present

    • Ireland
    • Food and Beverage Services
    • 700 & Above Employee
    • Machine Operator
      • Jun 2018 - Feb 2019

  • P & R group
    • Punjab India
    • Project Manager
      • Jul 2016 - Aug 2017

      • Managed the construction of residential projects of up to 4800sq ft area including all the wood work, steel work, paint etc. Total 5 residential units of cost USD$1.2million were constructed. • Planned, Organized, directed and controlled the activities of residential home buildings. Supervised trade subcontractors to do specialized work such as plumbing and electric work to complete project on time. • Directed the workers and ensured fabrication as per the requirement of project and successfully delivered all projects with in the timeframe. Ensure material availability for next activity. Reviewed and prepared the work bills Show less

    • India
    • Food and Beverage Services
    • 100 - 200 Employee
    • Project Engineer
      • Aug 2014 - Sep 2015

      • Managed internal and external engineering activities with discipline team leaders and minimized errors while execution by acting as deputy to VP and providing back-up for project managers as required. Developed solutions to quality and productivity programs and validated bills of contractors. Prepared and submitted reports on status and progress of the project and documented reports for future use. • Reviewed and provided inputs on P&ID’s and layouts. Ensured technical requirements defined in the contract are properly incorporated in engineering deliverables by inspecting equipment’s at vendor’s manufacturing site. Conducted site visits to solve RFI’s and to ensure installation of equipment’s as per layouts and P&ID’s. Coordinated with contractors and colleagues to ensure project was on schedule. • Installed and commissioned mechanical equipment’s such as air compressors, sorter, multistage pumps. Supported construction, electrical and instrumentation activities to ease the flow of execution and minimized rework. Succeed with zero injury at site in project. Also constructed a Water treatment plant (WTP) considering the existing WTP capacity. Successfully erected and commissioned various facilities of a Power Plant along with Water Treatment Package, Compressed Air System, Fire Fighting System and Cooling Towers along with associated pipelines of these projects. Executed effective preventative maintenance programs to deliver maximum production and to increase equipment’s performance. Show less

    • United States
    • Food and Beverage Manufacturing
    • 700 & Above Employee
    • Site Engineer
      • Jun 2011 - Jul 2014

      Project Crumb • A USD$26million project to reduce transportation cost and to complete the demand of raw material for the running chocolate plants at Cadbury Baddi plant. Raw material production of 25TPD was achieved, which later was extended to up to 35TPD in second phase. Successfully resolved layouts, design and technical issues. Installed equipment’s such as blenders, sieves, T-Reactor, dryers, contherms etc. • Directed the fabrication and erection teams of over 70+ persons. Documented daily activities, risk logs and highlighted project reports to senior management. Identified and rectified safety, quality and productivity problems while execution. Made as built drawings and handover documents for every equipment before project hand over to the production team. Project Rail • A brownfield project valued at USD1.4million to modify existing packing area and equipment’s to reduce packing costs. Successfully installed a 3T blender and 3 chocolate storage tanks 20T each, to increase the storage capacity and hook up with the existing line. Installed HVAC Fabric duct over the running production line without hampering the production, removed the foil wrap machine from running line during plant CIP and increased per day packing capacity from 120 BPM to 240 BPM for 11 packing machines and awarded for taking initiative and showing up leadership skills. Project Big Band • This USD$18million project area 5500-meter square was for the very first equipment installed and commissioned in Band Dryer in India to increase the production of bournvita up to 10TPD. Visited vendor’s site and ensured engineering aspects and quality of equipment’s as per contract and organizational standards. Old lobe pumps from UK factory were used in this project, which were refurbished at site to reduce the project cost. Drive in racking system installed with G+5 storage capacity. 3 Brownfield Projects Show less

    • Design and drafting
      • Aug 2010 - May 2011

      • Prepared steel structure erection drawings from architectural drawings in layers using AutoCAD. Coordinated with site engineers and incorporated the changes at site in engineering drawings and ensured accurate fabrication. Managed and stored engineering drawings according to projects and distributed accordingly. Handled all the documentation. • Prepared steel structure erection drawings from architectural drawings in layers using AutoCAD. Coordinated with site engineers and incorporated the changes at site in engineering drawings and ensured accurate fabrication. Managed and stored engineering drawings according to projects and distributed accordingly. Handled all the documentation.

Education

  • Rayat Institute of engg. & Information Technology
    Bachelor of Technology (B.Tech.), Mechanical Engineering
    2006 - 2010
  • S.G.H.Sr.Sec. Public School Talwara
    1994 - 2006

Community

You need to have a working account to view this content. Click here to join now