Gurjit Aujla

Project Manager, Commercial & Industrial at Stamped Engineering Corporation
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Canada, CA
Languages
  • English -
  • Punjabi -

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • Canada
    • Oil and Gas
    • 1 - 100 Employee
    • Project Manager, Commercial & Industrial
      • Jun 2019 - Present

    • Intermediate Electrical Designer/Drafter
      • Jun 2017 - Jun 2019

    • Canada
    • Engineering Services
    • 700 & Above Employee
    • Intermediate Electrical Designer/ Drafter
      • Feb 2006 - Jun 2016

      Feb 2006– Present: Intermediate Electrical Designer & Drafter Bantrel, Edmonton AB (Petro-Canada, ESSO Alliance, Enbridge & Suncor MVU Projects) • Material requisition for electrical equipment, construction drawings and construction support/clarification for various projects for ESSO Alliance including ULSD, OM&S. • Supported electrical design, power distribution schematics on the Suncor MVU project. • Interpret; detail and electrical draft AutoCAD power and wiring layouts, schematics, single line drawings. • PLC I/O wiring and schematics, DCS marshalling panel design. • Compressor overspeed trip system block diagrams, schematics and wiring based on cause & effect drawings. • CCTV system installation details, F.O. cable runs for site security project. • Perform voltage drop calculation, panel sizing, cable sizing & selection field clarifications. • Prepration of final construction & commissioning packages, consult with clients, and take meeting minutes, actively involved in correspondence with clients and team members. • Assemble construction work packages, material requisitions and proficient in Canadian Electrical Code. • Worked on Enbridge LP and MP projects start to finish and involved in all stages of job from DBM to final construction issue. • Most recently worked on Enbridge Alternate Power and Terminal Isolation valves replacing valves and installing emergency back-up Generators with ATS and breakers. • Infoworks database input and management for Enbridge • Knowledgeable in Enbridge drawing standards (EDS) and Functional Tag Numbering System (FTNS) and have done CADD quality checks for packages going out for construction Show less

  • Sunday's Distributing
    • Sherwood Park, AB
    • Assistant Electrician
      • Nov 2004 - Jan 2006

      • Electrical repairs & service business for various facilities equipment, depending on the service calls. • Provided service through out Alberta. • Electrical repairs & service business for various facilities equipment, depending on the service calls. • Provided service through out Alberta.

  • Eaton Cutler Hammer
    • Calgary, Canada Area
    • Designer/ Assembler
      • Dec 2000 - Aug 2002

      • Prepared and detailed out electrical schematics, wiring and layout drawings for PLC equipment and MCC’s for various projects for Suncor and EnCana. • Proficient in the interpretation of client drawings and inspection of equipment to ensure requirements are met and even exceeded. • Installed bus bars, heavy-duty cabling, and wiring for PLC’s and Electrical motor controls. • Prepared and detailed out electrical schematics, wiring and layout drawings for PLC equipment and MCC’s for various projects for Suncor and EnCana. • Proficient in the interpretation of client drawings and inspection of equipment to ensure requirements are met and even exceeded. • Installed bus bars, heavy-duty cabling, and wiring for PLC’s and Electrical motor controls.

    • Canada
    • Oil and Gas
    • 700 & Above Employee
    • 1st Year Electrical Apprentice
      • Jun 2000 - Nov 2000

      • Projects included Footner Forest Products – High Level OSB Plant (High Level, Alberta) • Continuity checks on installed cables, marking as built drawings. • Responsible for installing cable tray, with tie wrapping cables to cable tray using the C.E.C., and in cable pulls using a tugger and various pulleys. • Projects included Footner Forest Products – High Level OSB Plant (High Level, Alberta) • Continuity checks on installed cables, marking as built drawings. • Responsible for installing cable tray, with tie wrapping cables to cable tray using the C.E.C., and in cable pulls using a tugger and various pulleys.

Education

  • Northern Alberta Institute of Technology
    Diploma in Electrical Engineering Technology
    1998 - 2000

Community

You need to have a working account to view this content. Click here to join now