Gul Hassan Dogar

Operation Supervisor at OTTCO Oman
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Oman, OM

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • Oman
    • Oil and Gas
    • 100 - 200 Employee
    • Operation Supervisor
      • Dec 2022 - Present

      Duqm, Oman

    • Nigeria
    • Consumer Goods
    • 700 & Above Employee
    • Manager Operation(Tank Farm & Product Terminal) Offsite Department
      • Mar 2021 - Dec 2022

      Ibeju Lekki, Lagos, Nigeria

    • United Arab Emirates
    • Engineering Services
    • 700 & Above Employee
    • Supervising Operator(Tank Farm & Oil Terminal)
      • Apr 2019 - Jan 2021

      Saudi Aramco Jazan Refinery Saudi Arabia 1- Developing the Operations Manual,Teating Commissioning Procedures and start up execution plan. 2- Drawing up equipment lists, operator check lists. 3- Drawing up safety equipment list, location along with checking operability. 4- Supporting and improving team performance by sharing knowledge. 5- Pre-Commissioning,Commissioning the Tankage Area including Spheres and IFR, EFR Dome Cone Roof Tanks for different Hydrocarbons. 6- Commissioning of Steam system in Tank Farm… Show more 1- Developing the Operations Manual,Teating Commissioning Procedures and start up execution plan. 2- Drawing up equipment lists, operator check lists. 3- Drawing up safety equipment list, location along with checking operability. 4- Supporting and improving team performance by sharing knowledge. 5- Pre-Commissioning,Commissioning the Tankage Area including Spheres and IFR, EFR Dome Cone Roof Tanks for different Hydrocarbons. 6- Commissioning of Steam system in Tank Farm area. 7- Preparing Activities reports / progress reports on different Pre-commissioning,Commissioning & Operational assignments regularly. 7- Successfully commissioned JZR Crude tanks (10,00,000 BBLs x 07) with all system (Receiving, Charging, Metering skid, and Close drain system. 8- Successfully commissioned JZR HSD tanks (650,000 BBLs x 04) with all system (Receiving, Charging,and Close drain system. 9- Successfully commissioned JZR ULSD tanks (520,000 BBLs x 07) with all system (Receiving, Charging, Metering skid, and Close drain system. 10- Successfully commissioned JZR Gasoline 95 tanks (110,000 BBLs x 03) with all system (Receiving, , Metering skid, and Close drain system. 11- Successfully commissioned JZR Naptha tanks (387,000 BBLs x 04 ) with all system (Receiving, Charging, unloading of Ships,Metering skid, and Close drain system. 12- Successfully performed leak test and O2 free for LPG(C3,C4)spares. 13- Successfully commissioned all utility systems (Drinking water, Utility water, Nitrogen, Instrument air and Utility air) in Tank Farm area. Show less

    • South Korea
    • Construction
    • 700 & Above Employee
    • Sr,Board Operator.
      • Dec 2017 - Mar 2019

      ADNOC Refining Ruwais RRW CBDC Project 1- Leak Test, Loop Checking, Function testing and MRT’s of Conveyors & Pumps. 2- Preparing Activities reports / progress reports on different Commissioning & Operational assignments regularly. EQUIPMENT HANDLING 1- Belt Conveyor,Screw Conveyor, Bucket elevator, Blower, Pumps, Crusher,Telescopic chute, Green coke Recliner, Rotary kiln and Its accessories, Afterburner and its accessories, Coke cooler, Waste heat boiler,Boiler feed water pump, Bag house filter,ID fan.

    • France
    • Oil and Gas
    • 700 & Above Employee
    • Shift Supervisor - Tank Farm
      • Jan 2016 - Jun 2017

      Petro Rabigh Phase-II in Rabigh KSA Tank Farm Pre-Commissioning, Commissioning & Start-up Project of Petro Rabigh Phase-II in Rabigh KSA. .Petro Rabigh project consist of following tanks for Petro-Chemicals storage (Toluene, Benzene, Mixed Xylene, PDEB (P-Diethyl benzene), Aromatics, Isobutylene, Ethylene, Methanol,Hexane, Methanol,Acetic Acid,MTBE,Acetone,Phenol,MMA,Caustic Soda,ENB feed Tanks,Leaks Test, Loop Checking, Function testing and Pumps MRT’s. ,Inspection and Punch listing for the Tanks & Interconnection… Show more Tank Farm Pre-Commissioning, Commissioning & Start-up Project of Petro Rabigh Phase-II in Rabigh KSA. .Petro Rabigh project consist of following tanks for Petro-Chemicals storage (Toluene, Benzene, Mixed Xylene, PDEB (P-Diethyl benzene), Aromatics, Isobutylene, Ethylene, Methanol,Hexane, Methanol,Acetic Acid,MTBE,Acetone,Phenol,MMA,Caustic Soda,ENB feed Tanks,Leaks Test, Loop Checking, Function testing and Pumps MRT’s. ,Inspection and Punch listing for the Tanks & Interconnection Pipelines ,LP & HP Flares and LP & HP purge flares commissioning and operation monitoring. ,Preparing Activities reports / progress reports on different Commissioning & Operational assignments regularly. Show less

    • United Arab Emirates
    • Oil and Gas
    • 700 & Above Employee
    • Operation Oil Movement
      • Dec 2011 - Dec 2015

      ABU DHABI OIL REFINERY COMPANY (RRE)Ruwais, Abu Dhabi UAE. Safe handling Tank Farm area operation for Products(Storage of Crude,Intermediate Products, Blending Components and Finished Products storage (LPG, Motor Gasoline, HOBC, Jet A-1, SKO, HSD, Fuel Oil, Gas Oil, Slop Oils) Preparing Product Tanks for Truck Loading(LPG) & Ship Loading for Export & Local Use. Responsible to understand the basis of HSE system requirements. Communicates SHE policies and elements of HSE Management system to workers in his area and conduct Sub-SOC meeting… Show more Safe handling Tank Farm area operation for Products(Storage of Crude,Intermediate Products, Blending Components and Finished Products storage (LPG, Motor Gasoline, HOBC, Jet A-1, SKO, HSD, Fuel Oil, Gas Oil, Slop Oils) Preparing Product Tanks for Truck Loading(LPG) & Ship Loading for Export & Local Use. Responsible to understand the basis of HSE system requirements. Communicates SHE policies and elements of HSE Management system to workers in his area and conduct Sub-SOC meeting if required. Development and implementation of operating procedures and manuals and to ensure all levels of operational personnel are involved in the preparation of operating procedures Organizing safe Loading and unloading of Ships. Intermediate and Finished product Storage Tanks, Flare system & Fuel gas recovery system and Waste water treatment section.  Participated in Turn around Activities (15-10-2014 ~ 25-11-2014). Preparation for PM of steam traps on HS, MS, LS and steam condensate lines. Preparation of cleaning of fuel oil, Gas Oil tanks. Preparation Hydrocracker flares and Acid flares and knock out drums for Cleaning and maintenance job & inspection. Preparation of all Pressure Safety Valves (PSV’s) for calibration in Oil Movement Area. Show less

    • Pakistan
    • Oil and Gas
    • 700 & Above Employee
    • Supervisor /Sr,DCS Operator in Oil Movement Department
      • Jan 2001 - Dec 2011

      Pakistan I have worked as Supervisor /DCS / Sr. Field operator at Oil Movement Department. Operational Activities as Supervisor & DCS / Senior Operator at Tank Farm Area (Oil Movement) •Experience to check the oil movement area according to P & ID’s. •To check solo run test of motors & mechanical run test of pumps. •Water flushing of pipelines. •Air blowing the pipelines after water flushing. •Leak test of pipelines. •N2 purging of pipelines according to procedures. • Preparation… Show more I have worked as Supervisor /DCS / Sr. Field operator at Oil Movement Department. Operational Activities as Supervisor & DCS / Senior Operator at Tank Farm Area (Oil Movement) •Experience to check the oil movement area according to P & ID’s. •To check solo run test of motors & mechanical run test of pumps. •Water flushing of pipelines. •Air blowing the pipelines after water flushing. •Leak test of pipelines. •N2 purging of pipelines according to procedures. • Preparation of crude oil tank for charging to plant. •Crude oil charging to refinery (CDU). •Receiving rundowns of Products & Components in respective tanks (LPG, Flushing oil, •VGO, Light Naphtha, Heavy Naphtha, Stabilized Naphtha, Reformate, SKO, HSD, and Fuel Oil). •Different products deliveries to OMC (Oil Marketing Companies) through pipelines. (HSD, SKO, Fuel Oil & LPG). Switch over of rundowns & delivery/ truck loading tanks. To lineup tanks for blending (MOGAS, 92RON, 90RON, HOBC & Jet-A1/JP-8) •Well knowledge about different kinds of tanks such as Volatile product tanks, Naphtha, Reformate etc. •Water draining of Tanks. •Sampling & gauging of different product tanks manually. • Flare system and sour/wet dry flare knock out drums.  LPG Handling at PARCO •Receiving LPG from LPG Merox unit in LPG storage sphere. •Charging of LPG to refinery fuel gas system. •Delivery of LPG to marketing companies through pipeline according to procedure & safety rules. •To lineup LPG Spheres for T/L. •To carry out safe sampling of LPG from LPG storage spheres according to safety rules & procedures.  Control System Experience: •DCS ( Yokogawa Centum CS of Japan ) •FUELS MANAGER made by YOKOGAWA •OMIS (OIL Movement Information System)  Pipe Line Operations: •Receiving of crude oil for refinery through 864 Km long pipelines from Karachi to Mahmood Kit. •Experience of receiving of interfaces of different products i.e. Crude Oil, HSD & kerosene through same pipeline. Show less

    • Pakistan
    • Construction
    • 500 - 600 Employee
    • Plant Operator (Chemical Attendant)
      • May 1993 - Dec 2000

      Muzaffargarh PAKISTAN I have working experience in following plants. •Fuel Oil Pumping Station. •Demin water plant (capacity 100m3/hr.) •Demin water plant (capacity 80m3/hr). •Demin water plant (capacity 25m3/hr). •Softening plant (capacity 25m3/hr.) •Chlorination plant. •Waste Water Treatment Plant. •Cooling Tower operation & water treatment. •Boiler Feed Water system quality control & chemical injection, (N2H4, NA3PO4, NH3). Project Phase Experience: •Worked in… Show more I have working experience in following plants. •Fuel Oil Pumping Station. •Demin water plant (capacity 100m3/hr.) •Demin water plant (capacity 80m3/hr). •Demin water plant (capacity 25m3/hr). •Softening plant (capacity 25m3/hr.) •Chlorination plant. •Waste Water Treatment Plant. •Cooling Tower operation & water treatment. •Boiler Feed Water system quality control & chemical injection, (N2H4, NA3PO4, NH3). Project Phase Experience: •Worked in pre-commissioning, commissioning and master start up during Project phase with the TPE Corporation of USSR. •Commissioning of Demin water plant. Show less

Education

  • Islamia University, Bahawalpur
    Bachelor of Arts (B.A.), Economics
    1990 - 1992
  • Govt College of Technology-Multan, Pakistan
    Associate Engineer, Chemical Engineering Technology/Technician
    1986 - 1989

Community

You need to have a working account to view this content. Click here to join now