Guillermo Lozon de Cantelmi Acha

Project Manager at CYMI Industrial
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Victoria, British Columbia, Canada, CA
Languages
  • Español Native or bilingual proficiency
  • Inglés Professional working proficiency
  • Euskera Limited working proficiency

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • United States
    • Construction
    • 1 - 100 Employee
    • Project Manager
      • Sep 2019 - Present

      Project Manager for the North Landing Wharf Substation Replacement (NLWSR) - EGD Victoria, B.C.Client: PSPCDemolition of the previous substation and construction and commission of the new NLW Substation. Main milestones are as follows:- Civil works:1) 400 m2 rock wall blasting and securing using DCP anchors and rock fall mesh.2) Foundation excavation as well as excavation for 500 m. duct banks.3) Concrete works as duct banks, foundations, walls erection and suspended slabs.4) Structural steel works to accomplish the building erection.5) Precast 10 vaults, 4 drain sumps, 1 water vault installation and piping works. 8 low voltage shore power kiosk installation.- Electrical works:1) Install grounding systems and transformers (dry stipe, medium and high voltage).2) Supply, install, test and commission of the following elements: Primary switchgears, interlock systems, central distribution panels, panel boards, SPD, disconnect switches, protective relays, motor starters, etc.3) Power system SCADA, lighting protection and cabling supply, install and testing for: communications, fiber optic, power supply and security systems. - Mechanical works: Plumbing, plumbing pumps and drainage waste piping installation as well as HVAC system installation and commission. - Finishing works: Structural steels stud framing, bituminous sheet waterproofing, traffic coating, thermal insulation, moisture barriers, metal wall panels, roofing, metal flashing, fire stopping, joint sealant, doors and frames, gazed aluminium walls, glazing and painting.Main duties and responsibilities:- Procurement works and planning development using MsP in order to meet the project deadlines.- Resource planning and progress monitoring carrying thought a close coordination with trades. - Cost estimating and controlling to avoid going over-budget.- Progress reports, documentation and quality control.- Team leadership and close coordination with the client to ensure fully satisfaction.

    • Site Project Manager
      • Jan 2019 - Sep 2019

      Site Project Manager for the New Champlain Bridge Electrical Systems Installation in Montreal, Quebec.Client: Signature on the Saint Lawrence Group, comprised of SNC-Lavalin, ACS and HOCHTIEF.The scope of work consisted on the supply, installation and commission of the following items: - Lighting System including: Functional Lighting (lighting poles), multiple-use path (MUP) lighting, interior lighting of Champlain Bridge, aeronautical and navigational lighting, security and Emergency lighting and lighting on DBT Infrastructure. - Electrical Power Supply System including: transformers, switchgear units, transfer switches, UPS systems, overload protections equipments, generators, power distribution panels, power monitoring equipments, electrical distribution network grounding system and underground and above ground conduits. - Electrical and Mechanical grounding system for all the above mentioned items. - Lightning surge protection system.Main duties and responsibilities:- Planning development and updating for the electrical works in the scope of the contract using tools as Microsoft Project and Primavera.- Monitoring the progress of the subcontractors as well as the resources requested by the project at any time. These resources extend to the manpower requirements and the equipment and material procurement needed for all the electrical works. - Cost estimating and controlling to avoid going over-budget. - Progress reports and necessary information to document the project steps. - Close coordination with the client representatives to ensure their fully satisfaction with the work developed.

    • Proyect Engineer
      • Oct 2018 - Jan 2019

      Quotation preparation for national and international tenders of civil and industrial projects, within the Oil and Gas field, applying the technical know-how and implementing the site work experience.

    • Pipeline Project Engineer
      • Dec 2017 - Oct 2018

      Project Engineer at the Construction Department within the Oil & Gas EPC contract: "Khurais Crude Oil Increment: Khurais, Abu Jifan and Mazalij". The Project consists of the construction of 5 steel pipelines, with a total length of 245 km. Diameters: 12"- 26".Contractor: Arkad / MASA PipelinesClient: Saudi AramcoMain duties:- Responsible for the monitoring and distribution of all construction resources regarding pipeline mechanical works (manpower, machinery, tools & materials) in order to optimize the work progress (Mechanical Construction Manager dutie).- Site Leader of all mechanical pipeline activities (stringing, bending, welding and lowering). Development and implementation of Method of Statements for Pipeline mechanical works. Elaboration of daily reports to directly keep the client's PMT informed about dailythe progress. - Close coordination and follow-up with civil, quality, safety, logistic and electrical teams and its daily progress, being involved in solutions for internal and external interface problems (Mechanical Construction Manager dutie).- In charge of material, manpower and machinery requests for Pipeline mechanical construction activities. Continuous tracking of the procurement process.- Leading and monitoring of subcontracted mechanical activities (welding & internal coating).

    • Pipeline Site Engineer
      • Apr 2017 - Dec 2017

      Site Engineer at the Construction Department within the Oil & Gas EPC contract: "Khurais Crude Oil Increment: Khurais, Abu Jifan and Mazalij". The Project consists of the construction of 5 steel pipelines, with a total length of 245 km. Diameters: 12"- 26".Contractor: Arkad / MASA PipelinesClient: Saudi AramcoMain duties:- Monitoring and distribution of all construction resources regarding pipeline mechanical works (manpower, machinery, tools & materials) in order to optimize the work progress. - Deputy Site Leader of all mechanical pipeline activities (stringing, bending, blasting, welding...). Development and implementation of Method of Statements for Pipeline mechanical works. Elaboration of daily reports to keep the client's PMT informed about the progress. - Close coordination and follow-up with civil, quality, safety, logistic and electrical teams and its daily progress, being involved in solutions for internal and external interface problems.- In charge of material, manpower and machinery requests for Pipeline mechanical construction activities. Continuous tracking of the procurement process.- Support within the elaboration of Subcontracts and its implementation at site. Leading and monitoring of subcontracted activities.

    • Assistant Civil Engineer
      • Jul 2015 - Aug 2015

      Internship: Construction Manager’s Assistant for the ground decontamination Project, urbanization process (55.000 m2) and construction of two buildings (111+80 dwellings) in the AOR-402 sector. Santurtzi, Bizkaia, SPAIN.

    • Brazil
    • Construction
    • 1 - 100 Employee
    • Assistant Civil Engineer
      • Jul 2014 - Aug 2014

      Internship: Construction Manager's Assistant for the urbanization and building Project of two buildings ( 200 dwellings) and an outpatient clinic in the SR-R-30 y SZ-R-31 areas. Miribilla, Bilbao, SPAIN.

    • Spain
    • Industrial Machinery Manufacturing
    • Associate Engineer
      • Jul 2013 - Aug 2013

      Internship: Diverse duties like building work visits, drawing design in AutoCAD software and Condition Assessments of Existing Structures. Getxo, Bizkaia. SPAIN.

Education

  • Universidad Politécnica de Madrid
    MSC Civil Engineer, Hydraulics & Energy specialty
    2008 - 2016
  • Universidad Nacional de Educación a Distancia - U.N.E.D.
    Grado en Administración y Dirección de Empresas, Administración y gestión de empresas, general
    2014 - 2020
  • Colegio Nuestra Sra. de Begoña, Jesuitas
    1996 - 2008

Community

You need to have a working account to view this content. Click here to join now