Gregorio P.

Lead Process Automation & Control Optimisation Engineer at Petrokon Utama Sdn Bhd
  • Claim this Profile
Contact Information
Languages
  • Japanese Limited working proficiency
  • English Full professional proficiency

Topline Score

Bio

Generated by
Topline AI

0

/5.0
/ Based on 0 ratings
  • (0)
  • (0)
  • (0)
  • (0)
  • (0)

Filter reviews by:

No reviews to display There are currently no reviews available.

0

/5.0
/ Based on 0 ratings
  • (0)
  • (0)
  • (0)
  • (0)
  • (0)

Filter reviews by:

No reviews to display There are currently no reviews available.
You need to have a working account to view this content. Click here to join now

Experience

    • Brunei Darussalam
    • Oil and Gas
    • 100 - 200 Employee
    • Lead Process Automation & Control Optimisation Engineer
      • Dec 2018 - Present

      • Responsible for planning and executing multiple moderate to large projects to the defined scope, within budget, on schedule, and to the satisfaction of the customer (internal and external)• Provides feedback to the Project Team Lead as to the status of work in progress, on a regular basis and immediately informs the Project Team Lead of any pending/unresolved issues that may impact quality, schedule, or cost.• Identifies and implements methods to improve quality through standardization and reuse.• Prepare estimates for customer engineering solutions on I&C systems based on analysis of project requirements and identify the skill level required to perform the project activities.• Study project documentation and conduct site work-downs as needed to become familiar with the process and the project’s control philosophy. Establish functional requirements and develop detailed design for control & automation systems based on experience and available customer documentation / knowledge. Work with the customer to define and clarify as needed.• Develop and implement control functions such that they are maintainable and well documented. • Reuse past configurations where appropriate and identify potential applications for new technology• Manages a team of engineers and designers and is responsible for the team’s skill development. • Perform flow and valve sizing calculations, pneumatic, hydraulic, and electrical consumption calculations. Show less

    • Senior Control & Automation Engineer
      • Aug 2010 - Dec 2018

    • Instrument Engineer
      • Feb 2006 - Aug 2010

      • Actively participated in Job Hazard Analysis for tie-in of equipments and control systems, i.e. DCS and ESD, between existing brownfield projects and new LNG plants. • Design, engineering and installation of process analyzer systems, such as GCs and H2S, & CEMS (continuous emission monitoring systems) in consideration to ISO 14001 compliance. • Design and engineering of wiring and pneumatic control schematic for control valves, shutdown valves and ESD systems of electronic field transmitter in accordance to process requirements, HAZOP study and resulting SIL category. Subsequently, deciding feasibility of interconnection through analog hardwiring for control system and using MODBUS for alarm systems from process analyzer systems to DCS. • Factory & site acceptance testing, which includes modification and optimization of control and shutdown functions, for ESD, Fire & Gas and DCS systems for two (2) LNG project. • Design, engineering, site testing and pre-commissioning of fiscal metering systems and sales gas systems. • Actively participated in the design and installation of impulse line hook-ups, planning & preparing cable sizing & estimates, loop and schematic diagrams, duct/rack and conduit routes, cable tray loading, hook-up diagrams and other electrical & instrumentation wiring diagrams for site engineers and subcontractors use. • Has been responsible for site integration testing, function testing and pre-commissioning of 4 Fired Heaters & 2 Regeneration Gas Heaters to plant’s control and shutdown system. • Has been responsible for site integration testing, function testing and pre-commissioning of 2 NGL compressor-expanders to plant’s control and shutdown system. Show less

    • Philippines
    • Oil and Gas
    • 200 - 300 Employee
    • Instrument Design Engineer
      • Jun 2003 - Feb 2006

      • Provided planning detail design and installation of Instrumentation layout in industrial plants particularly on Petrochemical, Petroleum & LNG Plants. • Prepared project execution plan which will interpret work demarcation between client, contractor and vendors. And also determine software and manpower requirement for each project. • Prepared procedure for project design for each category such as 3D, Detail Design, MTO of a project. • Prepares estimated project construction design schedule based on Level III schedule before start of every project. • Prepared design criteria for detail design based on project specification. • Interpreted & checked vendor drawings. • Reviewed, checked & approved deliverables prior to submission to client. Show less

    • Project Administrator/ Technical Engineering Consultant
      • Jan 2001 - May 2003

      • Directly in charge of preparing contract documents for bidding, planning & timely execution of civil & electrical works projects worth up to Php 3 million. • Directly in charge of preparing contract documents for bidding, planning & timely execution of civil & electrical works projects worth up to Php 3 million.

    • Civil Engineering
    • 200 - 300 Employee
    • Electrical & Instrumentation Engineer
      • Jan 1997 - Dec 2000

      • Provided planning detail design and installation of Electrical & Instrumentation layout in industrial plants particularly on Municipal Solid Waste Incineration Power Plants and Steel Galvanizing line projects. • Provided planning detail design and installation of Electrical & Instrumentation layout in industrial plants particularly on Municipal Solid Waste Incineration Power Plants and Steel Galvanizing line projects.

    • Philippines
    • Manufacturing
    • 700 & Above Employee
    • Maintenance Technician
      • Dec 1994 - Jul 1996

      • Scheduled, conducted and implemented corrective and preventive maintenance of two candy processing and packaging line. • Participated in the calibration and commissioning of instrument process instruments i.e., Endress & Hauser field instruments, Danfoss VFD, Honeywell temperature field controllers, Fisher-Rosemount, etc. • Conducts maintenance and troubleshooting for electronics, instrumentation and controls devices and equipment for the whole processing plant. • Scheduled, conducted and implemented corrective and preventive maintenance of two candy processing and packaging line. • Participated in the calibration and commissioning of instrument process instruments i.e., Endress & Hauser field instruments, Danfoss VFD, Honeywell temperature field controllers, Fisher-Rosemount, etc. • Conducts maintenance and troubleshooting for electronics, instrumentation and controls devices and equipment for the whole processing plant.

Education

  • University of Santo Tomas
    Bachelor of Science (BSc), Electrical Engineering
    1989 - 1994
  • University of Liverpool
    Postgraduate Diploma, Project Management (Oil and Gas)
    2014 - 2018

Community

You need to have a working account to view this content. Click here to join now