Greg-Chief Davis

General Manager at Chief Solutions, Inc.
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Houston, Texas, United States, US

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • United States
    • Civil Engineering
    • 1 - 100 Employee
    • General Manager
      • Jan 1985 - Present

      Background/ Bio Supervised field operations for drainage systems evaluation inspections and sanitary sewer rehabilitation construction projects with Chief Solutions, Inc/ Chief Contractors, inc. for over the past 35 years; in areas of line cleaning, television inspection (with and without dye water flood testing), smoke testing, manhole inspections, air testing and other physical inspection methods. Served as project supervisor in drain piping rehabilitation inspections and installations for various cities, municipalities, Air Force Bases, Army Bases, and other governmental facilities for projects with pipe sizes ranging from 4” to 168” diameter. Representative project experience includes: Large Line Sanitary Sewer Evaluation Study, Houston TX Provided coordination QA/QC reviews field oversight, and scheduling. The project consisted of CCTV Inspection and Manhole Inspection of 60,000 LF of 42” – 72” Sanitary Sewer, with project budget of $300,000.00 Sanitary Sewer Evaluation Study, City of Corpus Christi, TX Provided coordination QA/QC reviews field oversight and scheduling. The project consisted of Line cleaning, Manhole Inspections and TV Inspections of Larger Diameter Sewers ranging from 15” to 42” with a project budget of approximately $1.3 million. Inflow Correction Investigation, Greater Houston Waste Water Program, Houston, TX Providing coordination QA/QC reviews, field oversight and scheduling. The City of Houston had previously done a large quantity of SSES, and this effort was to re-evaluate previously known inflow sources after much of the rehabilitation had already been completed. The project budget was approximately $3.4 million, and included, Smoke Testing, Dye Testing, Line Cleaning and Television Inspections. Show less

Community

You need to have a working account to view this content. Click here to join now