Greg Brown

Contracts Manager at Ashleigh Contracts
  • Claim this Profile
Contact Information
Location
Belfast Metropolitan Area, GB

Topline Score

Bio

Generated by
Topline AI

0

/5.0
/ Based on 0 ratings
  • (0)
  • (0)
  • (0)
  • (0)
  • (0)

Filter reviews by:

No reviews to display There are currently no reviews available.

0

/5.0
/ Based on 0 ratings
  • (0)
  • (0)
  • (0)
  • (0)
  • (0)

Filter reviews by:

No reviews to display There are currently no reviews available.
You need to have a working account to view this content. Click here to join now

Experience

    • United Kingdom
    • Civil Engineering
    • 1 - 100 Employee
    • Contracts Manager
      • Jan 2014 - Present

    • United Kingdom
    • Civil Engineering
    • 1 - 100 Employee
    • Site Manager
      • Aug 2012 - Jan 2014

      With W&H Alexanders I managed construction of a number of multi-turbine windfarm sites aswell as civils maintenance on a number of existing windfarm sites through the UK and Ireland. With W&H Alexanders I managed construction of a number of multi-turbine windfarm sites aswell as civils maintenance on a number of existing windfarm sites through the UK and Ireland.

    • United States
    • Construction
    • Civil Engineer
      • Dec 2007 - Aug 2012

      At Graham I worked as a civil engineer on a range of heavy civil engineering projects throughout N.I. and mainland U.K. IWWF Networks - £10m various waste water projects incl. new construction of pumping stations, cassion shafts, gravity pipelines, rising mains, culverts, etc. and the refurbishment of existing storm water pumping stations.M80 Stepps to Haggs (Glasgow) - £330m project consisting of construction of 10km of greenfield motorway and 8km of upgrading dual carriageway to motorway statusEdinburgh Trams - £756m project on which I was responsible for the construction of an RC over bridge and 1.5km of track slab adjacent and existing railway line. Dounreay LLWF - £25m project on which I was involved during the earthworks stage in the construction of two 100m long x 50m wide x 17m deep subsurface vaults in which low level radioactive waste was to be stored arising from the decommissioning of the adjacent power plant

    • China
    • Mechanical Or Industrial Engineering
    • Civil Engineer
      • May 2006 - Dec 2007

      In this role I worked as a design engineer producing engineering drawings for planning permissions for some of Northern Ireland's largest housing developments. I carried out cut/fill analysis to set road alignments and finished floor levels, carried out drainage designs for storm and foul networks including design of flood attenuation systems. In this role I worked as a design engineer producing engineering drawings for planning permissions for some of Northern Ireland's largest housing developments. I carried out cut/fill analysis to set road alignments and finished floor levels, carried out drainage designs for storm and foul networks including design of flood attenuation systems.

Education

  • Queen's University Belfast
    Bachelor of Engineering (BEng), Civil Engineering
    2003 - 2006
  • Royal Belfast Academical Institution
    1996 - 2003

Community

You need to have a working account to view this content. Click here to join now