Graham Harper

Senior Piping Designer at Bilfinger Industrial Services UK
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
UK

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

5.0

/5.0
/ Based on 1 ratings
  • (1)
  • (0)
  • (0)
  • (0)
  • (0)

Filter reviews by:

John S.

Graham has acted for me in various property extensions and refurbishments and is very reliable and see's out a project from start to finish, helping out clients decide how to design their homes.

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • United Kingdom
    • Engineering Services
    • 700 & Above Employee
    • Senior Piping Designer
      • Sep 2017 - Present

      Piping Designer Skills :- Carrying out laser scan surveys using Leica RTC360 scanner, scan data processing in Leica Cyclone Register 360, 3D modelling in AutoCAD Plant 3D, Carrying out 3D model reviews with client using VR headset, production of design packs for construction (P&IDs, Piping Isometrics, Pipe Support details etc.) AutoCAD Plant 3D Admin skills :- Creating custom Client Cats & Specs (including PTFE lined CS piping, Hygenic tube & fittings (BS 4825) and Jacob Ducting). Customisation of Client Isometric set-up, Bill of Material Report creation to client spec. Project work examples :- Vacuum Pump replacement, Tanker Loading area reconfiguration, new Vessel with Powder Charging Containment installation, various piping & equipment modification projects.

    • United Kingdom
    • Oil and Gas
    • Director
      • Aug 2007 - Present

    • United States
    • Business Consulting and Services
    • 700 & Above Employee
    • Senior Piping Designer
      • Dec 2015 - Sep 2017

      Based on site at the Petroineos refinery in Grangemouth, working on the Refinery Area 4 Remediation project and upgrade/TAR projects within the refinery processing units. These have included new tank builds/tank refurbishment and associated pipework mods, upgrades/repairs/modifications to existing and installation of new piping systems, installation of pumps and reactor/vessel modifications. The position involves using PDMS and laser scan point cloud survey information to produce 3D models for auto-generation of piping fabrication isometrics, attending site meetings, site surveying, production of the required drawings/documents for the upgrade works (GA's, piping isometrics, pipe support details, bills of materials, tie-in registers), using Jacobs Project Information system for management of project documents, liasing with the client and other design and build contractors.

    • United Kingdom
    • Engineering Services
    • 700 & Above Employee
    • Senior Piping Designer
      • Oct 2011 - Nov 2015

      Based on site at the Petroineos refinery in Grangemouth, working on the Refinery Area 4 Remediation project, and projects at Finnart Ocean Terminal and Dalston Terminal. These projects included new tank builds/tank refurbishment and associated pipework mods, upgrades/repairs to existing and installation of new piping systems. The position involved attending site meetings, surveying pipe work and producing the required drawings/documents for the upgrade works (eg. 3D models, GA's, P&ID's, piping isometrics, pipe support details, bills of materials, line lists, tie-in registers), using topographical survey information, liasing with the client and other design and build contractors, checking and approving drawings, man-hour estimating, allocating workload to other designers & apprentices, and attending candidate interviews.

    • United Kingdom
    • Oil and Gas
    • 700 & Above Employee
    • Piping/Structural Designer
      • Jul 2009 - Oct 2011

      Work on the Ratcliffe SCR EPC project, a retrofit of a Selective Catalytic Reduction system to reduce Nitrous Oxide emissions at Eon's Ratcliffe-on-Soar power station. This involved 3D modelling of pipework, complex reactor and flue gas ducting sections and steel support structures. 3D modelling of the proposed ammonia distribution plant, pipework routing and pipe supports, and using the 3D model to produce pipework arrangements. Producing P&ID's, piping isometrics, pipe support details, bills of materials. 3D modelling of large scale steel support structures and producing arrangement drawings, and detailed drawings for fabrication from the 3D model. Attending site to carry out surveys

    • United States
    • Beverage Manufacturing
    • 700 & Above Employee
    • Piping Designer
      • Jan 2008 - Jul 2009

      3D modelling work using AutoCAD Plant 3D and MEP, on various upgrade projects including installation of new tanks, pumps and associated pipework. Producing P&ID's and 3D models for the proposals, and creation of GA's and piping isometrics from the 3D model. Production of project specific piping specs and catalogs within AutoCAD Plant 3D. 3D modelling work using AutoCAD Plant 3D and MEP, on various upgrade projects including installation of new tanks, pumps and associated pipework. Producing P&ID's and 3D models for the proposals, and creation of GA's and piping isometrics from the 3D model. Production of project specific piping specs and catalogs within AutoCAD Plant 3D.

    • Telecommunications
    • 1 - 100 Employee
    • CAD Designer
      • Nov 2005 - Jan 2008

    • Telecommunications
    • 1 - 100 Employee
    • N3 Design Manager
      • Jan 2004 - Nov 2005

    • CAD Designer
      • 2000 - 2003

Education

  • University of Strathclyde
    Bachelor of Engineering (BEng), Chemical Engineering
    1989 - 1993
  • Caldervale High School
    1984 - 1989

Community

You need to have a working account to view this content. Click here to join now