Topline Score

Bio

Generated by
Topline AI

0

/5.0
/ Based on 0 ratings
  • (0)
  • (0)
  • (0)
  • (0)
  • (0)

Filter reviews by:

No reviews to display There are currently no reviews available.

0

/5.0
/ Based on 0 ratings
  • (0)
  • (0)
  • (0)
  • (0)
  • (0)

Filter reviews by:

No reviews to display There are currently no reviews available.
You need to have a working account to view this content. Click here to join now

Experience

    • United Kingdom
    • Utilities
    • 1 - 100 Employee
    • Site Manager
      • Jan 2020 - Present
    • Architecture and Planning
    • Senior Site Manager & H&S Assistant
      • Nov 2017 - Jan 2020

      Maintaining company driven Health & Safety procedures / initiatives, including: Use of PPE, Site Inductions, Management of Method Statements/Risk Assessments, Work Permits, Scaffold/Lifting equipment inspections, In house audits / inspections, Liaison with the client, consultants etc. Opening and closing of the site facilities, Management of site facilities; welfare, toilets, offices, compound area etc. Management of site housekeeping, discipline, behaviour etc. Co-ordinating Sub-Contractors as appropriate, Preparation of site progress reports, Material take offs and co-ordination, accurate and timely completion of site-based documentation, attending project and company related meetings, Preparation of the Health and Safety files and Carry our work inspections and checks. Overall site area control and delivery of projects within the Demolition and remediation sector of the construction industry for professional group. Currently overseeing multi stage strip out and Demolition of assets across the Astra Zeneca site Manchester on behalf of bruntwood. Progress meetings and projected work paths ongoing a proud project for the group securing our strong relationship with the client and mitigating bodies. Bringing controlled Demolition and remediation services efficiently and safely ..... Together #Professionals Show less

    • United Kingdom
    • 1 - 100 Employee
    • Site Manager
      • Apr 2017 - Nov 2017

      Overseeing all aspects of the demolition and soft strip of projects, materials handling, daily records, ordering and Man management. Overseeing all aspects of the demolition and soft strip of projects, materials handling, daily records, ordering and Man management.

    • Fabric maintenance progress & delivery manager
      • Mar 2017 - Apr 2017

      Responsible for the progress and delivery of all the daily tasks across all trades guiding and directing labour on all work faces. Running of multiple work sites within the commercial and industrial construction/maintenance sector across all trades. Documenting and solving issues, ordering materials, costing, risk assessment, man management and delivery of all work scopes per the schedule dictated by the client working to various guidelines,specs and deadlines. Responsible for the progress and delivery of all the daily tasks across all trades guiding and directing labour on all work faces. Running of multiple work sites within the commercial and industrial construction/maintenance sector across all trades. Documenting and solving issues, ordering materials, costing, risk assessment, man management and delivery of all work scopes per the schedule dictated by the client working to various guidelines,specs and deadlines.

    • United Kingdom
    • Construction
    • 1 - 100 Employee
    • Site Supervisor / fire protection Sprayer
      • Feb 2017 - Mar 2017

      Coordinating the Application of fire protection coatings across an 8 floor construction building in London. Decretive structures beams and externals. Daily man management and safety outlook along with weekly management meetings discussing work scope updates , client relay and material inventory to complete project for fire integrity ltd and uk fire solutions ltd Coordinating the Application of fire protection coatings across an 8 floor construction building in London. Decretive structures beams and externals. Daily man management and safety outlook along with weekly management meetings discussing work scope updates , client relay and material inventory to complete project for fire integrity ltd and uk fire solutions ltd

    • Corrosion Engineer
      • Jan 2017 - Feb 2017

      Blasting and coating of rail bridges in London to sa2 and in accordance with protective coatings spec and planning Blasting and coating of rail bridges in London to sa2 and in accordance with protective coatings spec and planning

    • United Kingdom
    • Oil and Gas
    • 1 - 100 Employee
    • Industrial Sprayer
      • Dec 2016 - Jan 2017

      Spraying various steel structures in 2 pack coatings to determined depth and thickness working to client inspection standards Applying belzona sealatank products to the navigator project Spraying various steel structures in 2 pack coatings to determined depth and thickness working to client inspection standards Applying belzona sealatank products to the navigator project

    • Netherlands
    • Mechanical Or Industrial Engineering
    • 700 & Above Employee
    • INSULATION CA
      • Oct 2016 - Dec 2016

      Aboard the the Cygnus alpha platform assisting the insulation of various pipe works across the plant and material handling to assist in completion of punch list items and primary work scopes leading to first gas. Aboard the the Cygnus alpha platform assisting the insulation of various pipe works across the plant and material handling to assist in completion of punch list items and primary work scopes leading to first gas.

    • Blasting project supervisor
      • Sep 2016 - Oct 2016

      Grit Blasting overhead bridge to SA 2.5 inspection and coating in primer / mio / finish Coates via airless spray Grit Blasting overhead bridge to SA 2.5 inspection and coating in primer / mio / finish Coates via airless spray

    • Industrial sprayer
      • Aug 2016 - Sep 2016

      Applying international protective coatings on prepared blasted steel sub straight to pre determined thickness all blast prep masking and application carried out by teams of work parties on the job face . I'm part of a 4 man blast/spray team applying international coatings to predetermined spec working under a strict inspection team and to a high quality finish at the offshore structures Britain on behalf of universal coatings & services Applying international protective coatings on prepared blasted steel sub straight to pre determined thickness all blast prep masking and application carried out by teams of work parties on the job face . I'm part of a 4 man blast/spray team applying international coatings to predetermined spec working under a strict inspection team and to a high quality finish at the offshore structures Britain on behalf of universal coatings & services

    • United States
    • Software Development
    • 1 - 100 Employee
    • Performing authority / Charge hand
      • Jun 2016 - Aug 2016

      Nev Fm campaign living aboard the safe bristolia barge and working multiple anomalies per the work packs generating ccw and ra's and performing charge hand duties supporting the fm tool hands on the work face Grit and mechanical blast live lines and structure to profile Applying m922m glass flake And top coat Humidor coatings & Fire protection all to BG spec Daily issow wcc's requested and implemented Liaison with management to discuss progress and issues , change in work scopes and designation of men per skill set and work loads to complete the 2016 north Everest campaign 72,649 man hours without accident or incident ! Show less

    • United Kingdom
    • Industrial Machinery Manufacturing
    • 1 - 100 Employee
    • Corrosioneer ( offshore )
      • Jun 2016 - Jun 2016

      Offshore oil pump installation Centrica AP 1 platform Pot water tank project - Preparation of steal substrate application of PPA PrImer via airless spray followed by hand application coats of hand applied glass flake product to determined thickness, airless spray application of VEF Glass Flake , spark test - repair work and a final spray coat ..... within a water tank vessel confined space keeping to coating system specifics and method statement guide lines ... Dft testing and independent client inspection . Show less

    • CORROSIONEER ( Corrosion Engineering )
      • Sep 2015 - Jun 2016

      Capenhurst nuclear plant construction Sweep blast of concrete bunded areas using glass shot, Shot recovery Clean out the area and apply masking Prime the area Radius the wall to floor interface and fill any blow holes that have been created whilst blasting, Coat the area with Graphite S via airless spray to predetermined thickness, apply 2 Coates of VEF poly glass, glass flake to predetermined thickness via airless spray. Spark test Apply 1 final coat of VE Veil via airless spray to complete. All Coates are manufactured by Corrocoat and application is monitored by a qualified representative. Show less

    • United Kingdom
    • Oil and Gas
    • 700 & Above Employee
    • BLASTER - PAINTER- SPRAYER
      • Jul 2015 - Sep 2015

      Living aboard the Gms Endeavour a jack up barge tethered to the K5 Delta satalite. Working a paint campaign involving garnet blasting of lines and structure across the plant and coating in an international paint spec to determined thickness and depth via hand and spray Living aboard the Gms Endeavour a jack up barge tethered to the K5 Delta satalite. Working a paint campaign involving garnet blasting of lines and structure across the plant and coating in an international paint spec to determined thickness and depth via hand and spray

    • Netherlands
    • Oil and Gas
    • 1 - 100 Employee
    • CORROSION MANAGEMENT SPECIALIST ( PBS )
      • Oct 2014 - Jul 2015

      Fm General Forman Working aboard the mermaid a sea liner visiting various platforms across the North Sea Grit blasting preparation and coatings of multiple projects to determined thickness and finish 2 pack paint application via hand and spray International spec coatings L10-LIMA - ( unmanned satalite ) Grit blast of well heads areas and pipes full clean down and containment stripe coated and airless spray paint international paint spec application. Containment and masking of cellar deck well head area high pressure Christmas trees for grit blasting and coating. Grit blasting and surface preparation of sub cellar deck head area grit blasting and 100% alluminium coating for long term corrosion resistance testing along with full strip coat and spray application of the international 2 pack paint system. L10- FOXTROT - ( unmanned satalite ) Grit blasting south side main beams and legs blow clean and solvent wash followed by application of the international coating system via hand and airless spray - touch up work on the sub cellar deck to complete remedial handrail and pipe work damage. ---------------------------------------------------------- LEAD HAND ON THE L10 ALPHA platform in the North Sea Dutch sector Prep tenting and masking for Grit blasting of decks and other projects strip coating and airless spray of international spec paints Creating permits - risk assessment - leading the planning and work loads - documenting daily reports on the work carried out - ordering equipment and materials etc Show less

    • United Kingdom
    • Engineering Services
    • 700 & Above Employee
    • CORROSION TECHNICIAN ( PBS)
      • Aug 2014 - Oct 2014

      (BLASTER/PAINTER/SPRAYER) Total gas plant on the Shetland Islands Plant structure and module Garnet blasting and steal prep for hand application of multiple paint systems inc: joton - international and sigma coatings of various spec. Airless industrial spray coatings of multiple paint systems inc: joton - international and sigma coatings of various spec. Blasting and coating of pipe lines from isometric drawings and work packs logging batch numbers and system codes for coating systems applied multiple paint specs depths and finishes. Working on the petrofac show peice module ( MAO1 ) blasting of none skid plates and buns full containment and clean down joton paint spray applied to desired depth chicken fed none skid sealing coat hardtop xp finish Structural steal blast and hand coating joton spec Hand rail blasting and hand coating joton spec AREA CHARGE HAND Radio liaison with higher supervision and coordination of men in the work area ordering tools and other work related articles, daily health and safety tickets filled in and signed off. Show less

    • CORROSION MANAGEMENT SPECIALIST (PBS)
      • Apr 2014 - Aug 2014

      Off shore painter blaster sprayer at onstream working various platforms in the Dutch sector metal blasting preparation and 2pack industrial paint application via hand and spray. L15-Alpha - Noble Ronald hoope - grit blasting and spraying rig structure with industrial 2 pack 670/990 paint applications L10-Alpha - grit blasting and spraying fresh water storage tanks with sigma 585 ( high spec paints ) to determined depth requirments. G17-Alpha - grit blasting, wire brush and sanding of pipe work, welds and damage from construction and hand painting the 2 pack paint system sheeting and masking of areas and steam cleaning prior to blast - PLATFORM CHARGE HAND daily reports - risk assessments and permits to work filled in - long term multi deck project forward planning and job execution responsibility hand overs and management liaison Show less

    • PAINTER / BLASTER
      • 2014 - May 2014

      Painting blasting all aspects of industrial paint application both dry dock and float .. Metal fabrication cleaning and preparation .. Fire watch and all other aspects of marine dock workings Painting blasting all aspects of industrial paint application both dry dock and float .. Metal fabrication cleaning and preparation .. Fire watch and all other aspects of marine dock workings

    • United Kingdom
    • Maritime Transportation
    • 100 - 200 Employee
    • SPRAYER - BLASTER
      • Jan 2009 - Apr 2013

      Spraying blasting all aspects of industrial paint application setting prep and cleaning - on shore mobilization fabrication welding along with experience in multiple other marine dock areas Spraying blasting all aspects of industrial paint application setting prep and cleaning - on shore mobilization fabrication welding along with experience in multiple other marine dock areas

    • SPRAY PAINTER
      • 2008 - 2009

      Custom hand spray jobs and full resprays all aspects of body finishing and metal work Custom hand spray jobs and full resprays all aspects of body finishing and metal work

    • United States
    • Retail
    • PANEL REPAIR
      • 2007 - 2008

      METAL FABRICATION WELDING AND REPAIRING BROKEN OR SPLIT METAL PANELS AND RESPRAY TO FINISH TO A HIGH STANDARD METAL FABRICATION WELDING AND REPAIRING BROKEN OR SPLIT METAL PANELS AND RESPRAY TO FINISH TO A HIGH STANDARD

Education

  • Mortimer comprehensive
    2010 -

Community

You need to have a working account to view this content. Click here to join now