Goli Shafiee
Executive Assistant To Chief Executive Officer at Niksa Co | طرح توسعه نیکسا- Claim this Profile
Click to upgrade to our gold package
for the full feature experience.
Topline Score
Bio
Experience
-
Niksa Co | طرح توسعه نیکسا
-
Iran
-
Food Production
-
1 - 100 Employee
-
Executive Assistant To Chief Executive Officer
-
Jan 2020 - Present
1- Establishing a project control unit to collect and process data for: 1-1- Decision making for the CEO 1-2- Preparation of case and periodical reports 1-3- Production planning 2- Collecting the production information of previous years, survey and analyzing the statistical data that is result to 2-1- Significant reduction of casualties from 25% per year to 5% 3- Assessing the needs items in the CEO' 3-1- Create a new insurance structure for the first time in Iran 3-2- Modify the previous insurance structure • 100% reduction in lawsuits in this context • increase the 8 times in compensation from the damage • Collect the company's claim documents and receiving 50% of the claimed damages so far 4- Compilation of the final status of the project in line with borrowing loans 5- Holding meetings with the suppliers of the company's main materials in order to review all trading conditions: resulting is reducing the frequency and duration of inventory remaining at zero, an average of 3 months per year, to zero. 6- Preparing justification plans for taking loans or persuading investors to participate in the company's development plans Show less
-
-
-
Esmiran industrial & mining company
-
Mining
-
1 - 100 Employee
-
Project Manager
-
Jan 2018 - Jan 2020
-
-
-
LAVAGE AUTO
-
France
-
Motor Vehicle Manufacturing
-
1 - 100 Employee
-
Organization Manager
-
Jan 2012 - Jan 2018
1- 1- Document control and archiving of project documents, including letters, contracts, maps and quality control documents, etc. 2- 2- Controlling the financial accounts of the company 3- 3- Participating in tax meetings and tax dispute resolution boards and settling all tax debts of the company within 6 years from the deductions of the projects. 4- 4- Assessing the need for purchasing equipment and reducing the purchase of portable items by 30% such as cables and 10% of heavier equipment such as rectifiers 5- 5- Controlling the entry and exit of the company's workshop equipment and obtaining approval for entry and exit 6- 6- Meeting with the employers regarding the increase in the contract price and examining the claims of losses and obtaining a minimum increase of 20%. 7- 7- Obtaining confirmation of overtime status from the employer 8- More about this source text Source text required for additional translation information 9- Send feedback 10- Side panels Show less
-
-
-
SADID Oil and Gas Development Co.
-
Iran
-
Oil and Gas
-
1 - 100 Employee
-
Project Control Manager
-
Jun 2007 - Jan 2012
-
-
-
Fuel Conservation Services LTD (FCS LTD)
-
United Kingdom
-
Oil and Gas
-
1 - 100 Employee
-
Project Control Specialist
-
Jan 2005 - Jan 2007
• • Project control expert in the construction, installation and operation of CNG stations • • Preparation of daily and monthly reports and management reports to ensure the transfer of technical knowledge to the country, sending and using quality equipment in accordance with the equipment contract and monitoring construction. • Expert in controlling the transfer of technical knowledge at the same time as the project is implemented • • Project control expert in the construction, installation and operation of CNG stations • • Preparation of daily and monthly reports and management reports to ensure the transfer of technical knowledge to the country, sending and using quality equipment in accordance with the equipment contract and monitoring construction. • Expert in controlling the transfer of technical knowledge at the same time as the project is implemented
-
-
-
Kaveh Glass Industrial Group
-
Iran
-
Glass, Ceramics and Concrete Manufacturing
-
200 - 300 Employee
-
Industrial Specialist
-
Jan 2003 - Jan 2005
• Designing maintenance and repair system in Maragheh sodium bicarbonate factory based on two preventive and predictive methods • Designing maintenance and repair system in Maragheh sodium bicarbonate factory based on two preventive and predictive methods
-
-
Education
-
Yazd University
Bachelor's degree, Industrial Engineering