    • Renewables & Environment
    • 100 - 200 Employee
    • Electrical Engineer
      • Sep 2017 - Present

      1. MIS for site, In that preparation of daily, monthly and yearly plant generation report and daily progress report, MTBF and MTBR calculation, Low generation analysis, Low performance string and string inverter and PV module analysis and root cause analysis of repeating errors 2. Analysis of weather station data & monitoring. 3. Predictive and preventive maintenance of all equipments, Like PV central inverters of (1000 kW range) and String inverters (43 kW), transformers, and LT and HT breakers and follow PM adherence for year at the variance of +/-3 day. 4. Troubleshooting the breakdown of SPV module, Strings, Inverters, ACCB, LT, ICOG and HT panels and Ensure Zero breakdown & implemented Root cause analysis method to avoid the reputation of same problem. 5. Responsible for HOTO activity with project team. 6. Effective maintenance of PR>78%, CUF>20%, plant availability>99% and Specific yield of pant by carry out low performance strings, inverter and PV module analysis report. 7. Monitoring of all parameters through SCADA like each string level, String inverter, TVM and weather stations. 8. Operation and maintenance of Motor, VFD, Inclinometer and other sensors installed in SAT. 9. Handling and Developing of SPV module cleaning strategies and billing. 10. Analyze operating solar plant data to identify any underperformance issues for solar PV plant. 11. Preventive and corrective maintenance for communication problem occurs in SCADA and SACU system. 12. Managing team & ensuring availability of resources to ensure economic operation at site. 13 Follow & execute effective HOTO process & smooth HOTO process for new sites & completion of snags within 2 weeks time from DOC.

    • India
    • Renewable Energy Semiconductor Manufacturing
    • 100 - 200 Employee
    • Junior Electrical Engineer
      • Feb 2016 - Sep 2017

      1. Responsible for regular monitoring and O&M of 6.63 MW solar power plant. 2. Troubleshooting the break down of SPV module, Strings, SCB, MCB, Inverters, RMU and HT panels. 3. well-know in operation and maintance of SAT 4. Preparation of daily, monthly and yearly plant generation report, low performance strings and PV module analysis report. 5. Monitoring of all parameters through SCADA for SJB's at string level, inverter, TVM and weather stations. 6. operation and maintenance of hydrolic system, VFD and other sesnsors installed in SAT. 7. Handling the preparation of SPV module cleaning schedule and billing. 8. Involving in the predictive maintance and preventive maintance of whole plant in order to achieve the goal of the organization.

    • India
    • Motor Vehicle Manufacturing
    • 700 & Above Employee
    • Intern
      • Feb 2015 - Aug 2015

      1. Monitoring of experimentally the available potential of solar energy at the location. 2. The experimental performance analysis of existing 10.34 kW PV system. 3. Simulating the grid connected PV system in MATLAB/Simulink environment for data analysis. 4. Involved in the predictive maintenance and preventive maintenance of plant. 5. Developing time series based forecasting model helps in prediction of electric power generation of stand-alone and grid connected PV system. 6. Validation of the developed time series forecasting model through experimental observations made at the location and also performs the comparative/ compatibility studies.

Education

  • BVBCET hubali
    Master of Technology (MTech), electrical, renewable energy
    2013 - 2015
  • PDACE Gulbarga
    Bachelor of Engineering (BE), Electrical and Electronics Engineering
    2009 - 2013
  • KCP science and Arts college Vijayapur
    PUC, science
    2007 - 2009
  • NEHS ukkali
    SSLC, 82.72%
    2006 - 2007

Community

You need to have a working account to view this content. Click here to join now