Bio
Experience
-
Chandler Construction Services, Inc.
-
United States
-
Construction
-
1 - 100 Employee
-
Corporate Safety Lead
-
Jun 2020 - Present
Bringing 40+ years of professional experience in the safe execution of major capital projects worldwide in the mentoring and coaching of safe behaviors to our workforce. Development of training and safety cultures required to further managements vision of how our company manages our business in the future.
-
-
-
Chevron
-
United States
-
Oil and Gas
-
700 & Above Employee
-
Construction Manager
-
2020 - 2020
• Managed the onshore fabrication of small platforms and piping and structural infrastructure as per company policies to exceptionally facilitate the current drilling program.• Cultivated and maintained long-lasting relations with team members and stakeholders by utilizing strong interpersonal capabilities.• Project suspended due to current economic and health concerns.
-
-
-
Tengizchevroil
-
Kazakhstan
-
Oil and Gas
-
700 & Above Employee
-
Construction Field Coordinator - SCP Construction Group
-
2018 - 2019
• Achieved set goals promptly by participating in all contractor activities, including civil, mechanical, instrument, and electrically associated with the SCP (Small Capital Projects) Engineering Group for the Field Operations group.• Enhanced the skills of local company inspectors and contractors by arranging and leading training and mentoring sessions.Achievements:• Successful Brownfield Simultaneous Operations modifications to large production manifold facilities and Pipeline systems in the Tengiz field systems.• Headed the 3D engineering model evaluations, P6 Project scheduling, TAR (Turnaround), shut-In planning, and contractor PEP (Project execution planning) in conjunction with colleagues.
-
-
-
Chevron
-
United States
-
Oil and Gas
-
700 & Above Employee
-
CA/PIC (Construction Advisor - Person in Charge) FE Engineering Bangladesh
-
2014 - 2016
• Built and led a qualified construction team, including expat SME’s and engineers and local “national” inspectors and contractors to ensure finalization of all assigned tasks in a timely and efficient manner.• Managed overall dredging, stockpiling, transport to site, and final compaction of the West Pad drilling platform across Bangladesh while adhering to company policies and guidelines.• Directed all initial project start-up of civil operations in low lying coastal areas within Colombia and Bangladesh; built appropriate dikes and water management systems for completion of the project on time during the rainy seasons.• Installed control buildings, generator buildings, and heavy foundations for process equipment, lighting, and security systems.• Known for effectively constructing and maintaining all roads’ bridges for heavy transport of drilling and construction equipment.• Monitored civil, mechanical, I&E, commissioning, and start-up of various gas facility projects and upgrades as per set standards.Achievements:• Site management of project team with the completion of over 60MM man-hours of incident-free activities.• Muchai Compression Facility Upgrade: Simultaneously performed planning and coordination of (90) civil auger driven cement pilings, cooler foundations, and installation of three gas coolers.• EID’s TAR: Held accountability as a construction coordinator of the TAR of (4) Chevron gas facilities, such as Bibiyana, Muchai, MB, and JB Gas Plants.• West Pad Drilling Project: Simultaneously led all construction activities while drilling a new eight well gas facility following set procedures.
-
-
-
bp
-
United Kingdom
-
Oil and Gas
-
700 & Above Employee
-
SPC (Single Point of Contact) -BPtt Juniper Gas Development Project- Trinidad Offshore Fabricators
-
2012 - 2014
• Served as a focal point of contact between the BPtt project team and TOFCO (fabrication prime) during the development of the BP Juniper Gas Project to ensure completion of the project on time and within budgetary constraints.• Performed and ensured the smooth flow of all business development, initial project planning, engineering constructability reviews, and successful authoring of construction contract proposal for the BPtt Juniper Project in conjunction with team members.Achievements:• Directed the project to a successful contract award of 13,000t of onshore fabrication, including a gas production platform, jacket, flare boom, and the initial design and erection of a large GOM fabrication facility shop in Trinidad and Tobago within a set timeframe.
-
-
-
Chevron
-
United States
-
Oil and Gas
-
700 & Above Employee
-
Senior Mechanical Rep -Muchai Compression FacilityFE Engineering Bangladesh
-
2010 - 2012
• Accomplished all mechanical functions for the installation of the three Solar “Mars” turbines in a new Gas Compression facility in compliance with project specifications.• Successfully led and completed the construction of three large civil drilling and production “pads”, gas production facilities, and the associated 16” and two 20” Gas Transport pipelines.• Accountable for the initial constructability planning, project schedule development, critical material, and equipment purchasing with the FE Engineering team for the Bibiyana Gas Drilling program,Achievement:• Developed and executed project schedule recovery plans to efficiently execute a two-year project to the original 1st gas operationally complete dates while meeting the project requirements.
-
-
Senior Mechanical Construction Rep - EGP3B Flares Out Project
-
2009 - 2010
• Headed the project by creating initial project planning, schedule, cost estimates, contractor bid reviews, contract award, materials management, Sim-Op planning, and coordination of marine equipment inspection and evaluations.• Conducted all mechanical construction representative tasks, such as resolving constructability issues, ordering materials, designing change propositions, creating change evaluations, and leading inspections on equipment.• Ensured prompt and precise resolution of construction deficiencies observed in the field to meet and exceed the project specifications by delivering outstanding support to the construction team.Achievement:• Acted as a senior offshore site representative and directed the development of the initial execution planning for the modification of the flare systems and associated pipelines for seven offshore platforms in the Escravos Field.
-
-
Project Construction Manager - GACE Gas Development Program
-
2005 - 2009
GACE – Offshore Scope of Works:• Directed the development of the 1st Offshore Construction contractor in Colombia; successfully installed 20” piping during the drilling Sim-Ops program while adhering to enterprise policies.• Supervised offshore installation of 24” subsea gas pipeline which included tie-ins with two operating gas platforms.GACE – Onshore Scope of Works:• Ballenas Gas Plant Upgrade: Directed all civil infrastructure and foundations for new gas dehydration trains; new 30” Venezuela gas transport line and gas measurement facility.• Phase 1 GACE Compression Plant: Managed the set-up of remote local materials quarry, contractor transport consortium, repair to roads, and bridges for heavy equipment access for the mining and transport to the site of over 70K M3 of materials required for the GACE Colombia Gas Plant.• Phase 2 GACE Compression Plant: Leveraged analytical skills to coordinate the installation of two Solar Titan compressors and nine solar production modules, six Cat generator packages, two firewater tanks, office, and warehouse and living facilities.• Steered all plant mechanical completion handover, pre-commissioning; final commissioning, and first gas delivery of a project.Achievement:• Developed and implemented project recovery and contracting plans to develop a construction contractor consortium to allow the company project team to efficiently managing poorly performing contractors resulting in on-time delivery of the project.
-
-
Senior Mechanical Construction Rep - Chevron Venezuela LL-652 Project
-
1999 - 2005
• Installation of (3) platform LL-652 facility utilizing the Vera-Truss float-over lifting equipment.• Supervised up to 20 local inspectors onshore and offshore in Lake Maracaibo, completed 4 years with 0 LTA´s.• Yard fabrication of production platforms of up to 150T and offshore installation with local marine equipment.• Pipeline installations and repairs up to 30” diameter utilizing local marine equipment.• Concrete piling and well casings installations, concrete piles to 180’ driven with local marine equipment.
-
-
Education
-
American Petroleum Institute
API 570 Piping Inspection, Technical -
American Petroleum Institute
API 1169 Pipeline Inspection, Technical -
Georgia Institute of Technology
OSHA 3015 Excavation, trenching, and Soil Mechanics -
Georgia Institute of Technology
OSHA 510 Safety and Health for the Construction Industry