Glen Bennett

SUPERINTENDENT/QA/QC at Cape plc
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Thornaby-on-Tees, England, United Kingdom, GB

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

5.0

/5.0
/ Based on 2 ratings
  • (2)
  • (0)
  • (0)
  • (0)
  • (0)

Filter reviews by:

Carl O'Dwyer

I have worked alongside and known Glen for over 15 years now and I find him to be a highley Experienced Tradesman and Superintendant, the 2 characteristics I've come to most admire/respect in Glen are 1: his professionalism, 2: his persistence at achieving goals set by himself or higher management ( he will find solutions to problems ), I have no hesitation in recommending Glen for any given project irrespective of scope or size.

Mark Lawrence

Having worked with Glenn for a number of years I found him to be extremely proficient and thorough in every aspect of his position. He is an excellent manager of workforces and is very comfortable when asked to deliver deadlines.

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • United Kingdom
    • Oil and Gas
    • 700 & Above Employee
    • SUPERINTENDENT/QA/QC
      • May 2015 - Present

      Managing the day to day maintenance/projects in a Supervisory role for CAPE both mechanical & welding with duties covering; Planning,procurement of materials and equipment for site overhauls,Method statements and Risk assessments for all tasks carried out at site/workshop face,Permit allowance,testing welders, welder and material , co-ordination of radiography and all NDE processes, ensuring stringent consumable control, welders working to correct WPS and working within parameters, liaise with client (INEOS,HUNTSMAN PU,TGPP,PX FELLSIDE) , Working to ASME B 31.3.Coordinating with all relevant subcontractors for coatings, pressure testing, Insulation & E&I. Ensuring that all sub contractors are working to the project specifications. QC responsibilities for monitoring and auditing fabrication teams & sub contractors quality levels.The management of the Document Control and Technical Queries process. Producing method statements and risk assessments for various work on site eg. Vessel work,on site tie ins etc.Produce and Manage the QA/QC Hand over dossier for the project team.Additional roles:• Manage calibration processes• Manage material control processes• Manage Consumable control processes• Update drawing to red line status• Manage Improvement form process• Liaison with Project team.

    • Oil and Gas
    • 1 - 100 Employee
    • Superintendent/QA/QC
      • Jan 2010 - May 2015

      Managing the day to day maintenance/projects in a Supervisory role for Redhall both mechanical & welding with duties covering; Planning,procurement of materials and equipment for site overhauls,Method statements and Risk assessments for all tasks carried out at site/workshop face,Permit allowance,testing welders, welder and material , co-ordination of radiography and all NDE processes, ensuring stringent consumable control, welders working to correct WPS and working within parameters, liaise with client (INEOS,HUNTSMAN PU,TGPP,PX FELLSIDE) , Working to ASME B 31.3.Coordinating with all relevant subcontractors for coatings, pressure testing, Insulation & E&I. Ensuring that all sub contractors are working to the project specifications. QC responsibilities for monitoring and auditing fabrication teams & sub contractors quality levels.The management of the Document Control and Technical Queries process. Producing method statements and risk assessments for various work on site eg. Vessel work,on site tie ins etc.Produce and Manage the QA/QC Hand over dossier for the project team.Additional roles:• Manage calibration processes• Manage material control processes• Manage Consumable control processes• Update drawing to red line status• Manage Improvement form process• Liaison with Project team.

    • SUPERINTENDENT/QA/QC
      • Sep 2007 - Jan 2010

      Reporting to a Project Manager.Responsible for a Project/maintenance Team consisting of an Pipefitters,welders,Mechanical fitters,Platers,Electricians, Piping Insulation,Scaffolders.Reporting to Cost Engineer, QA/QC Coordinator, Safety Advisor, Chargehands, Tradesmen approx 20 - 40, various other Sub contract services.Responsible for Maintenance pipe work, Shutdowns and small projects support.Including:-Project Planning and SchedulingCost management of ProjectsIntroduction of QA/QC within teamProduction and presenting of scorecard safety system Project Managers Coordination and facilitation of Project meetings with Plant Engineers and Commercial teamsInitiation of a safety incentive schemeContinuous ImprovementPerformance Management

    • Oil and Gas
    • 400 - 500 Employee
    • SUPERINTENDENT
      • Jul 1995 - Sep 2007

      Reporting to a Project Manager.Responsible for a Project Team consisting of an Pipefitters,welders,Mechanical fitters,Platers,Electricians, Piping Insulation,Scaffolders.Reporting to Cost Engineer, QA/QC Coordinator, Safety Advisor, Chargehands, Tradesmen approx 20 - 40, various other Sub contract services.Delivery of a £4M Plant Expansion and installation of the largest Slurry stripping column in Europe, worked as part of the clients team developing a target cost using only line specs against approximate meters allowing the capital to be justified and approved for the Project. I was responsible for the delivery of the installation through to commissioning assistance, the Project was completed without any accidents or incidents, on Time, and within Budget this earned the business extra profit margins and a Safety Award, it was viewed as a major success by both parties.Responsible for Maintenance pipe work, Shutdowns and small projects support.Including:-Project Planning and SchedulingCost management of ProjectsIntroduction of QA/QC within teamProduction and presenting of scorecard safety systemProject Managers and DirectorsCoordination and facilitation of Project meetings with Plant Engineers and Commercial teamsInitiation of a safety incentive schemeContinuous ImprovementPerformance Management

    • Pipe work Supervisor
      • Jul 1990 - Jul 1995

      Reporting to a Project Manager.Responsible for a Project Team consisting of an Pipefitters,welders,Mechanical fitters,Platers,Electricians, Piping Insulation,Scaffolders.Reporting to Cost Engineer, QA/QC Coordinator, Safety Advisor, Chargehands, Tradesmen approx 10 - 40, various other Sub contract services.Responsible for Maintenance pipe work, Shutdowns and small projects support.Including:-Project Planning and SchedulingCost management of ProjectsIntroduction of QA/QC within teamProduction and presenting of scorecard safety systemProject Managers and DirectorsCoordination and facilitation of Project meetings with Plant Engineers and Commercial teamsInitiation of a safety incentive schemeContinuous ImprovementPerformance Management

    • Pipe work Supervisor
      • Sep 1989 - Jul 1990

      Reporting to Site ManagerResponsible for Estimating Man hr content Pipe work system Fabrication and installation using TIBS and associated norms.Responsible for pulling all relevant info together required to develop either Lump Sum, Schedule of rates, Target cost or Shared Risk estimates.Production of work packs for issuing to Supervision.Responsible for the control of QA/ QC Documentation and compilation of QA/QC Documentation packs.Planning and Preparation of tasks.Procurement.Timesheets.Maintaining task list register.Attending Project Engineer meetings presenting Planning and Quality performance.Coordination of Sub Contractors and Third parties.Holiday relief for Site Manager.

    • Pipefitter
      • Sep 1988 - Sep 1989

      Fully trained pipe fitter working onshore/module yards with Carbon Steels, Stainless Steels from ½” to 42”pipe work.Aluminum Silo vessels and tanks, Cast Iron pipe 4” to 8” and Structural Steel Supports, Pipe butts on tanks and vessels.Worked across Teesside, County Durham and Humberside on various Petro Chemical sites fabricating and installing Pipe work and Supporting steel.Chargehand responsibilities during larger Projects or Shutdown events. Fully trained pipe fitter working onshore/module yards with Carbon Steels, Stainless Steels from ½” to 42”pipe work.Aluminum Silo vessels and tanks, Cast Iron pipe 4” to 8” and Structural Steel Supports, Pipe butts on tanks and vessels.Worked across Teesside, County Durham and Humberside on various Petro Chemical sites fabricating and installing Pipe work and Supporting steel.Chargehand responsibilities during larger Projects or Shutdown events.

    • Apprentice Pipefitter
      • Sep 1986 - Jun 1988

      Multi Discipline Apprenticeship including Electrical and Instrumentation, Mechanical Fitting, Pipe Fitting, Plating, Welding and Rigging over 1 year and remaining in specialist trade. Worked on numerous Sites across Wilton Teesside, County Durham regarded as a Full tradesman during 3rd year by most Site Managers and frequently requested across all Cleveland Pipe Work sites Multi Discipline Apprenticeship including Electrical and Instrumentation, Mechanical Fitting, Pipe Fitting, Plating, Welding and Rigging over 1 year and remaining in specialist trade. Worked on numerous Sites across Wilton Teesside, County Durham regarded as a Full tradesman during 3rd year by most Site Managers and frequently requested across all Cleveland Pipe Work sites

    • United Kingdom
    • Professional Training and Coaching
    • 1 - 100 Employee
    • apprentice
      • 1984 - 1986

Education

  • AYRESOME SCHOOL,BOYNTON,LONGLANDS COLLEGE
    1975 - 1986
  • BISHOP AUCKLAND COLLEGE
    ECDL
    -

Community

You need to have a working account to view this content. Click here to join now