Gizem Basciftci Ozgunes
Project Consultant at ALGO Architecture & BIM Solutions- Claim this Profile
Click to upgrade to our gold package
for the full feature experience.
-
English Full professional proficiency
-
Russian Limited working proficiency
-
Turkish Native or bilingual proficiency
-
German Elementary proficiency
Topline Score
Bio
Experience
-
ALGO Architecture & BIM Solutions
-
Türkiye
-
Architecture and Planning
-
1 - 100 Employee
-
Project Consultant
-
Jul 2021 - Present
ЖК Остров квартал 1 ЖК Остров квартал 1
-
-
-
BOES Construction
-
Construction
-
1 - 100 Employee
-
Project Leader
-
Jan 2018 - Sep 2021
-ЖК "ТУШИНО 2018"/ "TUSHINO 2018" RESIDENCE, 130 000м2 -ЖК "САДОВЫЕ КВАРТАЛЫ"/ “SADOVIE KVARTALY” Residence Project, 123 430м2 • Lead to executing the production of construction documents with design intent & technical quality using Revit. • Responsible for executing specific technical design aspects of an assigned concept project, including investigation, evaluation and recommendation of design solutions that best meets the client’s needs • Oversee the task schedule planning. • Leading multiple aspects of client, team and project coordination, i.e., organizing documents with structural, MEP, lighting, AV, landscape and civil consultants. -РЕКОНСТРУКЦИЯ ТРЦ/ IKEA- Reconstruction of the Shopping Mall, 35 000м2 • Oversaw project work simultaneously which included reviewing specifications, preparing submittal documents, coordinating architectural project with other disciplines and conducting site visits in a cost effective manner. • Preparation of Construction Projects and Detail Drawings Show less
-
-
-
ENKA İnşaat ve Sanayi A.Ş. Engineering for a better future
-
Türkiye
-
Construction
-
700 & Above Employee
-
Design Office Architect
-
Aug 2017 - Dec 2017
Working as a Design Office Architect, in Kazan for TAIF Business Center Project. The project has 51,943 m2 gross area. Parking for 354 car-places will locate on four underground floors. Project consists of two office buildings with varying number of floors. Canteen with a dining room for 190 people and two VIP halls, premises of “Avers” bank, premises of “PSF Kennard” LLC, Conference Hall for 290 seats, boardroom, rooms of 4 missions and medical center. The helipad is located on the eighth floor. My duties, •MEP coordination and preparation of suspended ceiling superpose projects •Preparing the superpose projects of architecture-structural-mechanical and electrical projects were made. •The coordination between the architectural design office-construction site design office. •Preparation of Architectural quantities such as brick wall, plaster, gypsum boards, floor finishing material. •Coordination between facade-suspended ceiling and mechanical systems. Show less
-
-
-
RÖNESANS HOLDİNG
-
Türkiye
-
Construction
-
700 & Above Employee
-
Design Office Architect
-
Sep 2015 - May 2017
Working as a Design Office Architect in Ankara Central office for Adana Integrated Health Campus Project. The Project comprises of an integrated health campus with a total capacity of 1,550 beds consisting of 3 hospitals. These are the 1,300-bed Main Hospital, 150-bed Physical Therapy and Rehabilitation Hospital and 100-bed High Security Psychiatric Hospital. The Main Hospital consists of four patient tower blocks surrounding a common core. My duties; • The coordination between the architectural design office-center office and the construction site design office is ensured. • Preparing the superpose projects of architecture-medical-structural-mechanical and electrical projects were made. • Problems coming from the construction site and manufacturing groups were followed up and a detailed solution was delivered at the minimum time. • Control of the applications was made in Adana, in the construction area. • In accordance with the work program and on time, application projects were produced, checked and distribute to relevant units. • Projects were controlled according to the Ministry of Health Regulations and related specifications. • The internal and external orientation projects of the hospital were prepared and the production was made by coordination with the company. Show less
-
-
-
Sinpaş Yapı
-
Türkiye
-
Financial Services
-
100 - 200 Employee
-
Design Office Architect
-
Dec 2012 - Sep 2015
Working in Altinoran Project/Ankara as Design office architect. Project scope consist of complex of 10.000 houses, 295.419 m² construction area, commercial area, shopping center, recreation area projects...-Producing detailed workings, drawings and specifications -Preparation of shop-drawings and as built projects -Archiving all application project -Coordination of all discipline’s project such as statical, mechanical, electrical and landscape projects -Approving of aluminium joinerys projects, exterior and facade systems projects -Controlling a project from start to finish-Resolving problems and issues that arise during construction -Working closely with a team of other professionals such as building service engineers, construction managers Show less
-
-
Technical Office Architect
-
Sep 2012 - Dec 2012
Worked in Altinoran Project as a technical office architect;-Control of concept project, application projects,-Assistance in approval process of application projects -Preparation of application drawings
-
-
-
-
INTERN
-
Jun 2011 - Aug 2011
-
-
-
GORDION GROUP
-
Türkiye
-
Wholesale
-
INTERN
-
Jun 2010 - Aug 2010
-
-
Education
-
Gazi Üniversitesi
3.15, Architecture -
Orta Doğu Teknik Üniversitesi / Middle East Technical University
Master of Architecture - MArch, Architecture