Gilang Arrahman

Vice President of Technical Development at Azure Investama Group
  • Claim this Profile
Contact Information
Location
Jakarta, Jakarta, Indonesia, ID

Topline Score

Bio

Generated by
Topline AI

0

/5.0
/ Based on 0 ratings
  • (0)
  • (0)
  • (0)
  • (0)
  • (0)

Filter reviews by:

No reviews to display There are currently no reviews available.

0

/5.0
/ Based on 0 ratings
  • (0)
  • (0)
  • (0)
  • (0)
  • (0)

Filter reviews by:

No reviews to display There are currently no reviews available.
You need to have a working account to view this content. Click here to join now

Experience

    • Investment Management
    • 1 - 100 Employee
    • Vice President of Technical Development
      • Jul 2022 - Present
    • Indonesia
    • Construction
    • 1 - 100 Employee
      • Jun 2020 - Jul 2022

      PT Rapid Infrastruktur Indonesia awarded to lead the Project Management Team of PT MSM (PT Muria Sumba Manis) for Sugar Factory Project 6.000 TCD capacity (Expandable to 12.000 TCD) at Sumba, East Nusa Tenggara, Indonesia.Sugar Factory Project processing both Cane and / or Raw Sugar into final product of GKP (Gula Kristal Putih) and GKR (gula Kristal Rafinasi) with capacity of 6.000 TCD which expandable to 12.000 TCD. Facilities prepared for processing the GKP or GKR are as follows: Boiler (Bagasse and / or coal fueled), WTP, Turbine Generator, Emergency Diesel Generator, Cane Milling, Weight Bridge, Sugar Processing Factory, ETP, Coal Handling system, Raw Sugar Handling System, Bagasse Handling system, and Finish Good Handling system completed with other non-factory building such as Warehouse, Workshop, Engineering Building, Laboratory, Coal and Bagasse yard, main office, etc.PMT, which is a central point as a Project Integrator, responsible to integrated each parties starting from the Project Owner (PT MSM), the vendor, consultant, and licensor (ISGEC Heavy Engineering) and the direct Contractor (PT TATA Mulia, PT WEN, PT SKP, and others).PMT responsible to run the project within expected time and cost, while maintaining the quality and safety factor for more than 1.500 people and 5.000.000 expected manhours. Show less

      • Mar 2020 - Jun 2020

    • Indonesia
    • Construction
    • 700 & Above Employee
    • Piping Engineer
      • Nov 2012 - Mar 2020

      OGAWA KARAWANG FACTORY - (Feb' 2013-present) OGAWA KARAWANG FACTORY - (Feb' 2013-present)

    • Indonesia
    • Motor Vehicle Manufacturing
    • 700 & Above Employee
    • EPP
      • Jan 2012 - Jul 2012

Education

  • Universitas Indonesia (UI)
    S1, mechanical Engineering
    2007 - 2011

Community

You need to have a working account to view this content. Click here to join now