Gica Dudu

Rig Electrical Auditor/ Commissioning/ Inspection at DNV GL
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
RO
Languages
  • English Professional working proficiency

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

5.0

/5.0
/ Based on 1 ratings
  • (1)
  • (0)
  • (0)
  • (0)
  • (0)

Filter reviews by:

Marcu Cristian

I have known Dudu on a professional basis for about 15 years, during our time working together for Santa Fe in Kuwait, when he was Field Foreman and later at Gulf Drilling International. I have always found Dudu to work to a very high standard of Safety and personal integrity. He has always been the type of person who would not give up in finding a solution to whatever challenges he faced. He is extremely reliable under pressure and can work independently therefore I highly recommend Dudu as a very valuable asset to the company.

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • Norway
    • Oil & Energy
    • 1 - 100 Employee
    • Rig Electrical Auditor/ Commissioning/ Inspection
      • Oct 2020 - Present

    • United States
    • Retail
    • 700 & Above Employee
    • PMS Engineer, Electrical Supervisor, Chief Electrician
      • Dec 2019 - Present

    • Qatar
    • Oil and Gas
    • 700 & Above Employee
    • PMS Engineer, Maintenance Electrical Supervisor
      • Aug 2010 - Dec 2019

      • In charge with Preventive Maintenance System program (MAXIMO PMS) for all Gulf Drilling International Offshore/Onshore Rigs, Lift Boats and Accommodations.• Developing and Scheduling Job Plans as per OEM Recommendation, Industry Rules, Best Practice, Equipment History and Experience for all Equipment’s and Systems from rigs.• Create Condition Monitoring system for critical equipment’s, where equipment condition trend can be monitored.• Analysing equipment’s failures and improve the maintenance program job plans/schedules based on the root cause identified.• Develop SOW (Scope of work) for equipment’s planned for periodically maintenance or for the one which are sent for major repairs on third party workshops.• Review commissioning procedures and attend the tests after equipment’s are overhauled/repaired on third party workshops.• Develop Integration Tests for the rigs after 5 years major overhaul or if the client is requiring it when new contract is started.• Field support and on-site troubleshooting when necessary if the rig crew failed.• Carry out technical audits as per planned/unplanned requirements for drilling unit, equipment, department, craft.• Part of the team in charge for technical surveys when new drilling units are planned to be purchased Show less

    • Maintenance Electrical Supervisor
      • Aug 2006 - Aug 2010

      • Created Maintenance Department in Gulf Drilling International, and define Chart Organization, Personnel Job Description and Responsibilities. • Created and implemented Maintenance Policies. • In charge with monitoring and maintaining electrical systems Offshore platforms and Onshore rigs.• Field support and troubleshooting on site if required if the rig is in shutdown/down time.• Implemented temporary (T-Card Manual System) Preventive Maintenance System for the Onshore and Offshore Rigs. • Part of the reviewing team for OPEX/CAPEX budget. • 5 Years Maintenance Plan team member where all proposed equipment’s for Major Overhaul are analyzed and Scope of Work are developed. Show less

    • Field Foreman Electrical
      • Jan 2002 - Aug 2006

      • Promoted as Maintenance Field Foreman and I coordinate Electrical Department on Maintenance Department over nine land rigs. • In charge with day by day maintenance, upgrades plan, troubleshooting unexpected rig issues on electrical systems. • Verifying all Preventive Maintenance Job Plans results and identifies possible issues which can generate unexpected failures on electrical systems. • Coordinate Electrical Rig Maintenance team and in charge with Maintenance Electrical team Material Requisition reviewing and maintenance plans. Show less

    • Rig Chief Electrician
      • Mar 2001 - Jan 2002

      • I was working with CAT 3512 engine, KATO SR4 generators (1200kva). • SCR Ross Hill, SULLAIR compressor, • GE 752 DC Motors and a lot of auxiliary AC motors and controls. • Carry out Preventive Maintenance assigned Jobs as per PMS schedule (Rig Management System- Maintenance PMS Program) • Troubleshoot equipment’s while failed to operate and report to the direct Maintenance Electrical Supervisor. • I was working with CAT 3512 engine, KATO SR4 generators (1200kva). • SCR Ross Hill, SULLAIR compressor, • GE 752 DC Motors and a lot of auxiliary AC motors and controls. • Carry out Preventive Maintenance assigned Jobs as per PMS schedule (Rig Management System- Maintenance PMS Program) • Troubleshoot equipment’s while failed to operate and report to the direct Maintenance Electrical Supervisor.

    • Chief of Technical Department
      • Sep 2000 - Mar 2001

      - Planning & executing electrical systems for domestic use as per end user requirements - Planning & executing electrical systems for domestic use as per end user requirements

    • Assistant Electrician
      • Jul 2000 - Sep 2000

      - Worked on JACK-UP OFFSHORE (Key Hawaii) in charge with day by day equipment monitoring and maintenance for electrical systems. EMD power Generators, Ross Hill SCR system, GE 752 Traction Motors, MD Totco Instrumentation System, MCC for all rest equipment's from the rig - Worked on JACK-UP OFFSHORE (Key Hawaii) in charge with day by day equipment monitoring and maintenance for electrical systems. EMD power Generators, Ross Hill SCR system, GE 752 Traction Motors, MD Totco Instrumentation System, MCC for all rest equipment's from the rig

    • Chief of Technical Department
      • Jun 1999 - Jul 2000

      - Planning & executing electrical systems for domestic use as per end user requirements. - Planning & executing electrical systems for domestic use as per end user requirements.

  • ADMASCO
    • Kuwait
    • Rig Chief Electrician
      • Apr 1999 - May 1999

      - Worked with S.C.R Ross Hill with P.L.C control, CAT engine 398, KATO generator, G.E 752 D.C motors and a lot of auxiliary motors. Drilling Instrumentation MD Totco. - Worked with S.C.R Ross Hill with P.L.C control, CAT engine 398, KATO generator, G.E 752 D.C motors and a lot of auxiliary motors. Drilling Instrumentation MD Totco.

    • Chief of Technical Department
      • Sep 1997 - Mar 1999

      - Planning and execution for domestic electrical installation. - Planning and execution for domestic electrical installation.

    • Rig Chief Electrician
      • Oct 1983 - Sep 1997

      - Worked for repairing and maintaining different types of electrical system with SCRs for controlling the D.C motors 752 KW for draw works and mud pumps - Air conditioning systems, S.C.R systems exploitation, semiconductors replacement, SCR PC Boards repairing, electric AC motors controls for different drilling equipment's , different power pack generators used as a backup in the rig , transformers with working power from 160 KWA until 2000 KWA and working voltage from 0,4 KV until 20 KV. - Type of rigs: T-50, F 100ec, F 125ec, F 200ec, F 320ec, F 400ec. - During this time in 1992-1993 I worked as Land Rig Electrician in Sudan (F 125 2DH) where FORSECO S.A has a drilling contract. Show less

Community

You need to have a working account to view this content. Click here to join now