George Baykushev

Electrical and I&C systems consultant at ICGB AD – Gas Interconnector Greece-Bulgaria
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Sofia, Sofia City, Bulgaria, BG

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • Bulgaria
    • Oil and Gas
    • 1 - 100 Employee
    • Electrical and I&C systems consultant
      • Aug 2021 - Present
    • France
    • Environmental Services
    • 700 & Above Employee
    • E&IC and Cathodic Protection Expert
      • Apr 2020 - Aug 2021

      Expansion of gas transmission infrastructure of Bulgartransgas EAD parallel to the north (main) gas pipeline to Bulgarian – Serbian border, stage Linear part. ( Balkan stream Project) Expansion of gas transmission infrastructure of Bulgartransgas EAD parallel to the north (main) gas pipeline to Bulgarian – Serbian border, stage Linear part. ( Balkan stream Project)

    • Türkiye
    • Construction
    • 1 - 100 Employee
    • Electrical Manager
      • Jan 2016 - Nov 2019
    • United States
    • Civil Engineering
    • 700 & Above Employee
    • Electrical design and package Manager
      • 2012 - 2015

      450 000 m2 mixed used construction area containing three levels underground cap park area, podium with two towers residential and office and offshore seven star hotel at Caspian see 450 000 m2 mixed used construction area containing three levels underground cap park area, podium with two towers residential and office and offshore seven star hotel at Caspian see

    • Austria
    • Business Consulting and Services
    • Electrical Project Manager
      • 2010 - 2012

      Baku Flame Towers Project Mixed used development with a total construction area 230,000.00 m2, containing three high raised towers with a podium and underground car park area. Baku Flame Towers Project Mixed used development with a total construction area 230,000.00 m2, containing three high raised towers with a podium and underground car park area.

    • Mauritius
    • Construction
    • 1 - 100 Employee
    • Design Manager
      • 2008 - 2010

      Sidra Medical and Research Center 250,000.00 m2 construction area. Hospital and Clinic design development and detail design management of the Hospital and Clinic construction. Sidra Medical and Research Center 250,000.00 m2 construction area. Hospital and Clinic design development and detail design management of the Hospital and Clinic construction.

    • Construction Manager MEP
      • 2006 - 2008

      King Hamad General Hospital 65 000 m2 construction area. King Hamad General Hospital 65 000 m2 construction area.

    • Türkiye
    • Industrial Machinery Manufacturing
    • 1 - 100 Employee
    • Chief Electrical Engineer
      • 2005 - 2006

      Tokuda Hospital 55 000.00 m2 construction area, 1000 beds hospital.Design, construction and commissioning of the electrical systems. Tokuda Hospital 55 000.00 m2 construction area, 1000 beds hospital.Design, construction and commissioning of the electrical systems.

    • Construction
    • 1 - 100 Employee
    • Construction Manager MEP
      • 2003 - 2005

      Construction of Solid Waste Management and treatment Facilities for Al Ain and its region Construction of Solid Waste Management and treatment Facilities for Al Ain and its region

    • Information Technology & Services
    • 1 - 100 Employee
    • Electrical Supervisor
      • 1996 - 2003

      Great Man-made River Project Water Supply Project, supervising detail design development and construction works. Great Man-made River Project Water Supply Project, supervising detail design development and construction works.

    • Entertainment Providers
    • 700 & Above Employee
    • Electrical Engineer
      • 1993 - 1996
    • Electrical Engineer
      • 1986 - 1993

Education

  • Technical University Sofia
    Master's degree, Electrical and Electronics Engineering
    1981 - 1986

Community

You need to have a working account to view this content. Click here to join now