PPS International Limited
-
United States
-
Business Consulting and Services
-
1 - 100 Employee
-
Consultant
-
Mar 2019 - Present
-
-
-
Meinhardt (Hong Kong) / MGM Grand
-
Hong Kong / Macau
-
Senior Construction Manager
-
Jan 2014 - Feb 2018
Construction of MGM Grand Hotel and Casino Project in Macau.The construction comprises of 3 levels of basement, 3 levels of mixed development and 2x37 hotel towers. Construction of MGM Grand Hotel and Casino Project in Macau.The construction comprises of 3 levels of basement, 3 levels of mixed development and 2x37 hotel towers.
-
-
-
AFCONS Infrastructure Limited - A Shapoorji Pallonji Group Company
-
India
-
Construction
-
700 & Above Employee
-
Project Manager Chennai Metro Pkg 1 Stations
-
Nov 2011 - Nov 2013
Package1 of the Chennai Metro comprised of 5 underground stations D Wall ERS Construction. All stations were top down design which incorporated the D Walls as part of the permanent structure. The launch shafts were bottom up construction with internal strutting. 3 TBM's were assigned to Package1 to excavate and construct the tunnel using P/C liners which were manufactured in-house. Delays were expected due to the nature of the strata and the sensitive buildings within the zone of inference. These delays were managed and extended time was granted by the client. The project was headed up by Mr. Klaus Munz a brilliant Engineer,strategist,forward planner and tunnel expert. Design team was Parsons Brinkenoff out of Singapore. Show less
-
-
-
PT Newmont Nusa Tenggara
-
Mining
-
400 - 500 Employee
-
Senior Project Manager
-
Apr 2011 - Nov 2011
This project is well outside my normal scope of experience. Newmont Nusa Tenggara is a huge gold and copper mine. This site has very corrosive elements which has affected the major steel infrastructure with loss of section due to corrosion.. Project set up by Newmont to survey all steel structures with a view to repatriate all structures. The project entailed the programming of all steel renewal or repairs required to ensure safety for the structure, estimate quantities and costs, managing steel packages and finally grit blast and coat all surface areas with a non-corrosive paint system. The major setback with this project was the political unrest from the local contractors including their on site support staff. Still very interesting and only adds to my experience as I had to rely on support staff experience to successfully manage the project. Show less
-
-
-
Marina Bay Sands
-
Singapore
-
Hospitality
-
700 & Above Employee
-
Construction Manager
-
May 2008 - Mar 2011
Engaged in the project to assist with the new multi- billion dollar project for Venetian comprising a new state of the art science museum, casino, three 57 storey hotels, theatres, International conference and entertainment areas etc all built to the specifications expected within a very tight construction programme. My role to assist with the South Podium RC superstructure including interfacing and installation and provision of major support infrastructure. (Tower cranes, hoists and safe access ways) manage daily requirements of all interfacing issues and ensure safe and smooth progress.Was tasked to manage critical path activities when it was evident the time line was extending. Set up interfacing programmes for support infrastructure and manage all end users. General trade interfaces for concrete casting and steel erection, including managing the close work sequences between the Infrastructure and cladding teams in conjunction with the day to day deliveries. Upon completion of superstructure was involved in defect rectification and hand-over to section heads. Was given further management opportunities when upgraded to Senior Construction Manager. Show less
-
-
Senior Construction Manager
-
May 2008 - Mar 2011
I was given the opportunity to manage a very capable motivated team of professionals during the completion stages of the mega project... This team supported me to successfully close out the project...
-
-
-
-
Project Manager
-
May 1996 - Mar 2008
Involved mainly with heavy civil projects elevated rail system, expressway tunnel, bridge construction. As this was my initial company when commencing in Singapore I worked my way from a Construction Engineer to Senior Manager and gathered so much experience during this journey of my career. Involved mainly with heavy civil projects elevated rail system, expressway tunnel, bridge construction. As this was my initial company when commencing in Singapore I worked my way from a Construction Engineer to Senior Manager and gathered so much experience during this journey of my career.
-
-
-
-
Capital Works Engineer
-
Jun 1966 - Oct 1993
Involved in the capital works bridge upgrading program which was budgetted over a 20 year time frame for the renewal of all timber bridges on main lines to steel and concrete including all associated earthworks. Was involved with all site activities from contract supervsion to managing support staff. Involved with basic bridge and culvert design for secondary structures... This was the start of my career which lasted 27 years and the founding of my excitement for daily challenges. Involved in the capital works bridge upgrading program which was budgetted over a 20 year time frame for the renewal of all timber bridges on main lines to steel and concrete including all associated earthworks. Was involved with all site activities from contract supervsion to managing support staff. Involved with basic bridge and culvert design for secondary structures... This was the start of my career which lasted 27 years and the founding of my excitement for daily challenges.
-
-