Gemma Chapman

Office Manager at VolkerStevin
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Wigan, England, United Kingdom, UK

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Credentials

  • Microsoft Excel - Basic and Advanced
    GoSkills.com
    May, 2015
    - Nov, 2024

Experience

    • United Kingdom
    • Civil Engineering
    • 300 - 400 Employee
    • Office Manager
      • Dec 2020 - Present

      HS2 Colne Valley Viaduct -Temporary Jetty & Causeway Temporary jetty and access platforms for Align JV as part of the HS2 Colne Valley Viaduct

    • Office Manager
      • Jan 2020 - Present

    • Office Manager
      • Nov 2020 - Jun 2021

      As the ground level and required flood defence levels vary along the length of the scheme, the flood defence construction will vary depending on the specific site arrangement and constraints. Typically, the wall construction will be precast concrete walls, with insitu reinforced concrete panels used to accommodate significant changes in alignment, steel sheet pile walls are also proposed for specific sections to mitigate seepage under the flood defence wall. At various locations it will be necessary to provide Up and Over structures to ensure continued access along the cycle path while still providing a continuous passive flood defence. These locations will be very visible and prominent post construction and the landscape design of these areas will include additional planting and wall cladding or patterned form liners as already mentioned to lessen the visual impact of the structures. As part of the works it will be necessary to close the existing cycle path for the duration of the works. In order to facilitate this, a formal cycle path diversion will be created to safely move cyclists from the current route to an alternative outside of the construction area. Show less

    • Office Manager
      • Jan 2021 - Mar 2021

      EA CDF - Gosling Sike The scope is to upsize an existing culvert over an approximate length of 130m. The route is through an existing residential estate and approx. 30m through Morrisons carpark in Carlisle. Flows to be managed by over-pumping to install the new culvert and manholes Start on Site 4th Jan 2021

    • Office Manager
      • May 2020 - Oct 2020

      VSL Services to VBA - EA - Mytholmroyd FAS – The Mytholmroyd FAS is a flood alleviation scheme in the town of Mytholmroyd in the Upper Calder Valley which was subjected to extreme flooding over many years but more recently 2012, 2013 and 2015. The scheme is a design and construct commission to construct flood defences along the river Calder which runs through the centre of town and involves the following elements. Construction of new 30m span highway bridge and removal of the existing narrow bridge and diversion of all associated services. Removal of footbridge adjacent to the existing twin arch bridge and replace with new single span footbridge. Part demolition of upholstery factory and rebuild to the rear to facilitate the widening of the river by 9m. Take down and build new flood walls along a 1.3km of the A646 highway. 500m of bored concrete piled walls on the right bank of the river and 1000m of walls less than 1.1m high on right bank. Public real works to include seating, new toilet block, planer areas to create new open spaces in Mytholmroyd, removal of old steel bridge upstream of the works. Rendering from river bed to flood level to rear of properties which are directly connected to the river including flood doors, glazing and replacement of balconies. Demolition of various structures around town to accommodate the works and various culvert repair works, new pump station and surface water pipework to improve the surface water drainage system. Downstream of Mytholmroyd there is potentially a new fish pass to be installed at Brearley weir, protection works to affect properties around the weir including 300m wall and protection works to bungalows at Luddenden Foot as a result of downstream impacts assessment. Show less

    • Office Manager
      • Jun 2020 - Sep 2020

      3 Mills Studio River Wall Replacement Project External construction • Construction of a reinforced concrete flood defence wall supported on augered piled foundations; • Construction of a self-supported reinforced concrete flood defence wall with security fence; • Installation of a sheet pile wall with a concrete infill to tie back to the river wall; • Installation of demountable flood defences; • Installation of flaps on existing water outfalls; • Part demolition of boundary wall; • Rebuilding of boundary wall • Installation of pedestrian balustrade. • Construction of an earth bund with security fence • Demolition and repair of retaining wall • Demolition of ramp External repair/refurbishment • Removal of vegetation; • Repairs and repointing to existing river wall, boundary wall and Clock Mill Building (Grade 2 listed); • Resurfacing of the existing tow path Show less

    • Office Manager
      • Jan 2020 - May 2020

      AMP 6 - Ellesmere Port Essar Project The new wastewater treatment facility to be built at Ellesmere Port WwTW is intended to provide wastewater treatment for the additional biological load expected from Essar’s Stanlow refinery and for growth in the catchment. It will provide a holistic engineering solution to address the multiple quality and maintenance drivers at the wastewater treatment works.

    • United Kingdom
    • Construction
    • 700 & Above Employee
    • Cost Manager
      • Jun 2016 - Jan 2020

      o First point of contact for all escalated Labour Payment Queries and responsible for all payments to be accurate and made on time.o Analysis of costs, jobs, overdue invoices, escalations dealt with in a professional mannero Prepare month end cost reports and provide accurate accrualso Oversee any new suppliers that have to be transitioned to our department o Liaison with Site Managers, Quantity Surveyors, Suppliers, Procurement, Auditors, etco Checking off of invoices and collation of sub-contract payment certificates o Approval of labour invoices o Production of monthly reportso Collation of timesheets and recording on spread sheets and recording of labour orders on excelo Manage cost administrators for labour, plant and materials on the general day to day runnings of the office ensuring deadlines are achieved in a productive mannero Use Excel to a high standard-vlookups, pivot tables, graphs, formulas, etco Integral part of COINs being implemented-ongoing Show less

    • Senior Cost Administrator
      • Mar 2014 - Jun 2016

      o First point of contact for all escalated Labour Payment Queries and responsible for all payments to be accurate and made on time.o Prepare month end cost reports and provide accurate accrualso Oversee any new suppliers that have to be transitioned to our department o Liaison with Site Managers and Quantity Surveyorso Checking off of invoices and collation of sub-contract payment certificates o Approval of labour invoices o Production of monthly reportso Collation of timesheets and recording on spread sheets and Recording of labour orders on spread sheets Show less

    • United Kingdom
    • Construction
    • 700 & Above Employee
    • SITE COST ANALYST FOR KMI
      • Jan 2013 - Mar 2014

      Systems used- COINs and INVU 6 • Attend site set up meetings to ensure good knowledge of site activities and impact on finance resources • Review and assist sites to maintain an accurate list of plant and materials orders outstanding on site ensuring internal controls are maintained with appropriate requisitions • review with Site and commercial team the project resources plan and question material orders and plant orders that deviate from the plan • Input Goods Received notes into COINS • Match purchase invoices to goods receipt notes identify unmatched items price/quantity hire period etc. ensure all unmatched items are queried and appropriate action taken to resolve, e.g. order altered in line with revised site authorisation, credit notes obtained from suppliers GRN approval received from site • Prepare month end cost reports and provide accurate accruals Show less

    • IT Services and IT Consulting
    • 700 & Above Employee
    • BUYER AND EXPEDITOR
      • Jan 2010 - Jan 2013

      Retail Buyer and Expeditor (August 2010 to January 2013) • SAP System-Inputting and processing orders, stock control, etc • Contacting suppliers with regards to shipments, delivery dates, queries, monthly concalls, etc. • Maintaining price files, checking stock levels, forecasting stock, etc. • Dealing with day-to-day queries including invoice problems and escalations. • Sustaining good relationships with overseas suppliers in the US, Far East and Europe. As a reseller I purchased electronic equipment (Kiosks, cash machines, ID machines, etc) for our customers who were based in the UK and Europe. (H&M, Vodafone, Carrefour and many more). • Expediting all orders delivery dates. • Communicating daily with all departments, from sales managers, Finance, Logistics and customers. • Good Rapport with customers and suppliers alike. Previously, I worked for Fujitsu (a Global I.T. Company) based in Warrington as the Retail Buyer and Expeditor. My role was varied, ranging from placing the orders, arranging the transport to processing daily reports. As the Retail buyer I dealt with overseas suppliers in the US, Far East and Europe. As a reseller I purchased electronic equipment (Kiosks, cash machines, ID machines, etc) for our customers who were based in the UK and Europe. I placed batch orders, direct delivery orders ,MRP and generic orders including forecasting stock for our warehouse using SAP. My role also included expediting all delivery dates. I had to work closely with DHL to ensure a quick delivery by air and sea shipments from and to worldwide destinations, as well as within the UK. As the Retail buyer I managed over 2000 parts on the price file, ensuring all prices, uplifts,etc are always correct. I started working for the company in the Finance department, as an accounts payable administrator which also included processing claims, making BACS payments, etc. Show less

    • May 2007 to October 2009 moved to Mallorca and worked several different jobs
      • May 2007 - Oct 2009

  • HMP RISLEY
    • RISLEY, WARRINGTON
    • Administrative Officer
      • Jun 2001 - May 2007

      Worked on systems-Oracle, COMMS and CAMMS - Performed various administrative duties in several departments such as Request and Complaints, Security Department, Procurement, Finance (including Cashiers Department) and Personnel. Here are just a few examples of my duties over the 6 years: - Develop and maintain effective and efficient administrative and office systems, Including recording and filing systems. - Maintain accurate records, process documentation, analyse data/produce reports as required. - Communication by telephone, fax, email and letter, providing a courteous and helpful service. - Liaison with Prison Service personnel/outside agencies as appropriate. Support other team members in maintaining continuity of service delivery. - Ensure compliance with all Prison Service Orders so correct procedures are followed for the area in which I was employed. - Take an active role in any mandatory training as required. - For 3 months I was temporarily appointed as Executive Officer for 3 months in charge of the Procurement Department with 7 staff for a colleagues sick period Show less

Community

You need to have a working account to view this content. Click here to join now