Gaurav Kanwar
Resident Engineer at S. P. Singla Constructions Pvt Ltd- Claim this Profile
Click to upgrade to our gold package
for the full feature experience.
-
English -
-
HINDI -
Topline Score
Bio
Experience
-
S. P. Singla Constructions Pvt Ltd
-
India
-
Civil Engineering
-
300 - 400 Employee
-
Resident Engineer
-
May 2018 - Present
Construction of marine Cable Stayed Bridge 900m long between Okha and Beyt Dwarka with approaches 1420m long in Arabian Sea Construction of marine Cable Stayed Bridge 900m long between Okha and Beyt Dwarka with approaches 1420m long in Arabian Sea
-
-
-
Ircon International Ltd. (Govt. of India Undertaking)
-
India
-
Construction
-
700 & Above Employee
-
Works Engineer
-
Sep 2016 - May 2018
Construction of Cable Stayed bridge 483m long with 20m Dia well foundation and 193 m long Pylon and 96 cables which will hold down the superstructure of Bridge between Tunnel T2 & T3 on USBRL Project in the State of Jammu & Kashmir. Construction of Viaduct 120 m long for Anji khad Bridge. Slope stabilisation of Slopes of Anji khad bridge.Construction of Central Embankment with Retaining wall having micropiles 240mm Dia 9.9 m depth embed in the raft.Central embankment will be used as a… Show more Construction of Cable Stayed bridge 483m long with 20m Dia well foundation and 193 m long Pylon and 96 cables which will hold down the superstructure of Bridge between Tunnel T2 & T3 on USBRL Project in the State of Jammu & Kashmir. Construction of Viaduct 120 m long for Anji khad Bridge. Slope stabilisation of Slopes of Anji khad bridge.Construction of Central Embankment with Retaining wall having micropiles 240mm Dia 9.9 m depth embed in the raft.Central embankment will be used as a launching platform for Superstructure of CSB and Viaduct. Show less Construction of Cable Stayed bridge 483m long with 20m Dia well foundation and 193 m long Pylon and 96 cables which will hold down the superstructure of Bridge between Tunnel T2 & T3 on USBRL Project in the State of Jammu & Kashmir. Construction of Viaduct 120 m long for Anji khad Bridge. Slope stabilisation of Slopes of Anji khad bridge.Construction of Central Embankment with Retaining wall having micropiles 240mm Dia 9.9 m depth embed in the raft.Central embankment will be used as a… Show more Construction of Cable Stayed bridge 483m long with 20m Dia well foundation and 193 m long Pylon and 96 cables which will hold down the superstructure of Bridge between Tunnel T2 & T3 on USBRL Project in the State of Jammu & Kashmir. Construction of Viaduct 120 m long for Anji khad Bridge. Slope stabilisation of Slopes of Anji khad bridge.Construction of Central Embankment with Retaining wall having micropiles 240mm Dia 9.9 m depth embed in the raft.Central embankment will be used as a launching platform for Superstructure of CSB and Viaduct. Show less
-
-
-
AMEYAS BUILDCONS PVT LTD PUNE
-
HP DEHAR SITE
-
SITE ENGG
-
Jun 2014 - Sep 2016
CONSTRUCTION OF MAJOR BRIDGE 260m long.20m dia & 12 m deep well foundation for Pier P1,open foundation for Pier P2 and Abutment with span 130+115+15m steel Truss AT DEHAR BARMANA ACC LINK ROAD OF KNCEL expressway .Construction of Major Bridge at Ghasinala 123m long with open foundation & slip form shuttering.RCC 24m long and Steel Girder 46m long composite superstructure. CONSTRUCTION OF MAJOR BRIDGE 260m long.20m dia & 12 m deep well foundation for Pier P1,open foundation for Pier P2 and Abutment with span 130+115+15m steel Truss AT DEHAR BARMANA ACC LINK ROAD OF KNCEL expressway .Construction of Major Bridge at Ghasinala 123m long with open foundation & slip form shuttering.RCC 24m long and Steel Girder 46m long composite superstructure.
-
-
Education
-
hpu shimla
Bachelor of Technology (BTech), Civil Engineering -
DAV Sr Sec School Ghumarwin Distt Bilaspur HP
12th, Non Medical