Garvit Agrawal

Section Engineer at AECOM INDIA PRIVATE LIMITED
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Pune, Maharashtra, India, IN

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • India
    • Architecture and Planning
    • 400 - 500 Employee
    • Section Engineer
      • Mar 2022 - Present
    • India
    • Civil Engineering
    • 700 & Above Employee
    • Site Inspector - Civil
      • Jul 2017 - Feb 2022

      ● Design and Construction of Elevated Viaduct of Length 7.150 Kms from CH: (-)625 to CH: 6525 between Vanaz and Civil Court on the East-West Corridor of Pune Metro Rail Project. ● 08 nos. of Elevated Stations. ● Foundation: Open/Raft foundation, Pile and Pilecap. ● Substructure: Pier, Pier Cap, Pedestal & Seismic Arrestor. ● Superstructure: Viaduct - Precast Segmental Girder including lifting, gluing, pre-stressing and grouting. ● Design and Construction of Elevated Viaduct of Length 7.150 Kms from CH: (-)625 to CH: 6525 between Vanaz and Civil Court on the East-West Corridor of Pune Metro Rail Project. ● 08 nos. of Elevated Stations. ● Foundation: Open/Raft foundation, Pile and Pilecap. ● Substructure: Pier, Pier Cap, Pedestal & Seismic Arrestor. ● Superstructure: Viaduct - Precast Segmental Girder including lifting, gluing, pre-stressing and grouting.

    • India
    • Construction
    • 700 & Above Employee
    • Sr. Engineer
      • Mar 2017 - Jul 2017

      ● Laying of Embankment, Subgrade & Blanket in a stretch of 30Km. Main Line and 12.66Km. Connecting Line. ● Construction of RUBs, ROBs, RFOs, Minor & Major Bridges. ● Laying of Embankment, Subgrade & Blanket in a stretch of 30Km. Main Line and 12.66Km. Connecting Line. ● Construction of RUBs, ROBs, RFOs, Minor & Major Bridges.

    • Construction
    • 400 - 500 Employee
    • Sr. Engineer
      • Nov 2015 - Mar 2017

      • Construction of Arterial Trunk Road (9 Km.), Sub-arterial Roads (8 Km.), Intra-sectoral Roads (1.5 Km.) • Construction of Box-culverts, Pipe Culverts, Minor Bridge, VUP, ESR. • Construction of Arterial Trunk Road (9 Km.), Sub-arterial Roads (8 Km.), Intra-sectoral Roads (1.5 Km.) • Construction of Box-culverts, Pipe Culverts, Minor Bridge, VUP, ESR.

Education

  • Motilal Nehru National Institute Of Technology
    Bachelor of Technology - BTech, Civil Engineering
    2008 - 2012
  • Resonance, Kota, Rajasthan
    Preparation for IITs & NITs College Entrance Exams
    2007 - 2008
  • Central Academy Sr. Sec. School, Kota, Rajasthan
    Intermediate, Physics, Chemistry & Math
    2006 - 2007
  • Bal Vidya Mandir Senior Secondary School, Sambhal, U.P.
    Matriculation, Physics, Chemistry & Math
    2004 - 2005

Community

You need to have a working account to view this content. Click here to join now