Garry Myler
Maintenace Technician at FAMCO- Claim this Profile
Click to upgrade to our gold package
for the full feature experience.
Topline Score
Bio
Experience
-
FAMCO
-
United States
-
Wholesale Building Materials
-
1 - 100 Employee
-
Maintenace Technician
-
Jun 2020 - Present
-
-
-
OnTrac
-
United States
-
Transportation, Logistics, Supply Chain and Storage
-
700 & Above Employee
-
Maintenance Technician
-
May 2012 - Jun 2020
-
-
-
Applied Materials
-
United States
-
Semiconductor Manufacturing
-
700 & Above Employee
-
Engineering Technician
-
Dec 2005 - Feb 2008
Systems Integration of electrical, robotics, PLCs and mechanical systems into designs of prototype machines. Installed video surveillance systems to view prototype machines during 24 hour testing. Systems Integration of electrical, robotics, PLCs and mechanical systems into designs of prototype machines. Installed video surveillance systems to view prototype machines during 24 hour testing.
-
-
-
SCP Global Technologies
-
(4500 West park, Boise ID)
-
Electronics Test Technician
-
Feb 2000 - Aug 2005
Testing clean room processing equipment produced by SCP for customers like Intel, Texas Instruments, Micron, AMI, to mention a few. Design, build, and debugging mechanical, electrical, and software of Prototype equipment for production. Electrical design and PLC programming for prototype machines. Installed several tools in the field for customers listed above. Testing clean room processing equipment produced by SCP for customers like Intel, Texas Instruments, Micron, AMI, to mention a few. Design, build, and debugging mechanical, electrical, and software of Prototype equipment for production. Electrical design and PLC programming for prototype machines. Installed several tools in the field for customers listed above.
-
-
-
US Transformer (West)
-
Pocatello, Idaho
-
Test/Controls Technician
-
Sep 1999 - Dec 1999
Pre tested transformer coils by calculating tap and coil ratios, power factors, resistances, and excitation currents to insure all are within specifications and were wound correctly. Transformer sizes were from 30 KVA to 400 MVA. Tests were performed throughout the manufacturing process including all incoming transformers, CT’s, bushings, and control components to determine if replacement or repair is needed. Pre tested transformer coils by calculating tap and coil ratios, power factors, resistances, and excitation currents to insure all are within specifications and were wound correctly. Transformer sizes were from 30 KVA to 400 MVA. Tests were performed throughout the manufacturing process including all incoming transformers, CT’s, bushings, and control components to determine if replacement or repair is needed.
-
-
Education
-
Idaho State University
Electrical, Electronic and Communications Engineering Technology/Technician -
ICS Electrical/Electronic Engineering Technology Course
Electrical and Electronics Engineering Technology, Certificate of completion