Garry Doyle

Contract Manager at Michael Doyle Civil Engineering Ltd
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Irland, IE

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

5.0

/5.0
/ Based on 1 ratings
  • (1)
  • (0)
  • (0)
  • (0)
  • (0)

Filter reviews by:

lee watson „.

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • Ireland
    • Construction
    • 1 - 100 Employee
    • Contract Manager
      • Mai 2022 - –Heute

    • Construction
    • 100 - 200 Employee
    • Construction Manager
      • Jan. 2021 - Feb. 2022

      Deputy Project Manager and Construction ManagerBallycoolin to Forrest Little Truck Watermain Jan 2021 to Nov 2021Value 15.4 million, Duration 24 months. Client - Irish Water The works included 7.9km of 1200mm ductile iron truck main pipe installation, of which 6.5km was in fields and 1.5 was in roads including sections within Northwest Business Park at depths up to 5,5m in depth. The scope included 3 tunnel sections which were changed to open cut following negotiations with private business owners and Value Engineering Proposals. The works also included the crossing under/over High-Pressure gas mains (70 bar), high voltage ESB cables (110KV and 220KN underground cables) and the existing 900mm concrete Ballycoolin truck main which supplied water to 500,000 people. 1.5km of the works were within Dublin Airport Authority lands (DAA) with height restrictions as low as 5m.

    • Construction Manager
      • Juli 2020 - Dez. 2020

      City Block 9 – North Wall Quay July 2020 – Dec 2020 Value 28.2 million, Duration 18 monthsClient – Ronan GroupThe Phase 1 works included the installation site hoarding, diversion of existing services and installation of over 630 1200mm diameter secant piles up to 22m deep along the site boundary and adjacent to the existing red Luas line and installation of Dewatering wells. The work package also included the removal of over 300,000m3 of excavations up 17m deep as part of Phase 2. Phase 2 was proposed and did not proceed following objections to the Planning application.My responsibilities included: Communication with service providers regarding the diversion of existing services, application for hoarding licences, Temporary works design, compiling and submission of method statements, arranging additional Site investigation and testing of materials, coordination of the specialist piling subcontractor. Manging the installation of vibration, noise and dust monitors. Arranging precondition surveys of all adjoining structures and buildings. Submission of weekly progress reports and attending meeting with the client Coordination of works with TII and the Luas Operator and arranging outages for overnight works.

    • Deputy Project Manager
      • Feb. 2019 - Juni 2020

      Upper Liffey Valley 2A project Feb 2019 – June 2020Value 15.7 million, Duration 24 monthsClient – Irish WaterThe works included 8km of pipeline including 600mm and 700mm ductile Iron rising mains and 900mm and 1050mm concrete gravity sewers at depths up to 6.5m. approximately 4km of the pipeline was in road and included a 200m long twin 560mm PE directional drill under the river Liffey. Three pump stations, Control buildings and underground Storm attenuation tanks up to 2000m3.My responsibilities included: Method statement and Project Plan submissions, consultations with Kildare County Council roads, Gardai and local businesses, landowners, and residents regarding upcoming works, planned road closures and diversions. All road opening licence applications. Consultations with Inland Fisheries Ireland concerning the crossing of the river Liffey and other important fisheries watercourses. Procurement and programming of specialist subcontractors. Programming the works and coordination of the Plant, Labour, materials, Specialist Subcontractors, and site management team. Day to day communication with Client staff, twice weekly whiteboard meeting, weekly design meetings, compiling and submission of monthly progress reports and attending all meetings. Arranging all required quality testing and reports, submission of quality reports to Client. Submission of Material approval; requests. Assisting in all Value Engineering Proposal, monthly account submissions, technical submissions, claim and variation submission

    • Deputy Project Manager
      • Okt. 2017 - Jan. 2019

      Vartry to Callowhill Link main Oct 2017 – Jan 2019 Value 14.4 million, Duration 15 monthsClient – Irish WaterThe works included 4km of 1200mm truck main, 800m of 800mm main, high lift pump station, energy distribution building, energy recovery building, 2nr Break tanks (1500m3)My responsibilities included, Method statement and Project Plan submissions, consultations with Wicklow County Council roads, Gardai and local businesses, landowners, and residents regarding upcoming works, planned road closures and diversions. Consultations with Inland Fisheries Ireland concerning the crossing of the river Vartry and other fisheries watercourses. Procurement and programming of specialist subcontractors. Programming the works and coordination of the Plant, Labour, materials, Specialist Subcontractors, and site management team. Day to day communication with Client staff, twice weekly whiteboard meeting, weekly design meetings, compiling and submission of monthly progress reports and attending all meetings. Arranging all required quality testing and reports, submission of quality reports to Client. Submission of Material approval; requests. Assisting in all Value Engineering Proposal, monthly account submissions, technical submissions, claim and variation submissions.

    • Deputy Project Manager
      • Feb. 2016 - Okt. 2017

      Facebook Data Centre Clonee – Phase 1 & 2 Feb 2016 – Oct 2017 Value 47 million, Duration 24 monthsClient - FacebookThe contract included all infrastructure works, Roads, Paths, duct banks, services, drainage, Earthworks, attenuation and settlement ponds, paving and hard and soft landscaping works. The works package also included excavation, blinding and concrete to foundations of two data centre buildings over 50,800m2 and all associated concrete yards and loading bays My responsibilities included: Management for all the civil elements including technical submissions, compiling and submission of method statement, issues register, testing of materials, material approval submissions, coordination with all concurrent contract works. Management and coronation of the Roadbridge site management team. Design review, attending daily and weekly meeting with the client. Assisting in procurement and coordination of the materials, specialist subcontractors, plant and labour resource need to complete the works.

    • Contract Manager
      • Aug. 2015 - Jan. 2016

      Gas Pipeline to Wexford Town – Lot 1 Feeder Main Aug 2015 – Jan 2016 Value 12.7 million, Duration 15 monthsClient – Gas Networks Ireland40.5km of 400mm PE 100 Medium Pressure gas pipeline.1.4km of 180mm PE 100 Medium Pressure gas pipeline3km of other pipe ranging from 90mm-300mm PE 100 Gas MainHorizontal Direction Drilling and Horizontal Rock Drill at several locations under existing rivers, streams, and structures.Extensive Traffic Management, consultation, design, and installation to ensure the works are carried out safely and efficiently along over 40km of existing National, Regional and Local Road network. There are also several towns and villages along the route.My Responsibilities included: Submission of materials for approval to the client including all technical and quality documentation. Preparation of the Monthly progress report and account submission. Liaison with client and Engineers staff concerning quality, environmental, safety and design issues. Preparing, submitting, and implementing method statements. Submission of Contactors alternative design proposals and Value Engineering solutions for acceptance. Co-ordination of the works, plant and labour resources and specialist subcontractors ensuring the works are completed in a timely manner and the high quality required by the Client Authority.Programming and planning the works including preparation of the contract programme for submission.

    • Construction Manager
      • Aug. 2013 - Aug. 2015

      Construction Manager and Deputy Contractor manager for the Grangregorman Site Infrastructure and Public Realm Contract,the new college Campus for the Dublin Institute of Technology (DIT). Works included the following: 130,000m3 of soil removal, Installation of 11.0km of drainage,190km of ducting, 800m PE truck watermain,8 HDD crossing under protected structures and trees, Installation of MV, LV, Gas, Water, ICT, Telecoms, Security and Wifi, Foul and storm water pipework, 2.5km of District heating pipework and construction of the energy building,12000m 2 of granite and Permeable paving. Construction of grass and Astroturf playing pitches, tennis courts,sports lighting, fencing and equipment, Public gardens, walkways and playground.Responsibilities include;• Programming and coordination of the Roadbridge works with specialist subcontractors to carry out the mechanical, electrical, security, landscaping and paving works. Coordinating our works with other Contractors working within the site.• Preparation and submission of Material Approval Requests and Contractors works Proposals • Site Quality manager NCR and coordination of laboratory and site works. Extensive soil analysis (Murphy Suite testing) was required to establish the possible extent of contaminated soils on site and establish the appropriate use/disposal of the material depending on the results. Ensuring that the works were constructed in accordance with the Contract Requirements and to the Clients satisfaction, in a safe and efficient manner• Correspondence to/from Client and Client Authority• Liaison with Client, Design staff and Statutory Authorities, concerning coordination, quality, environmental, safety and design issues• Attending Public meetings to meet, greet , explain and discuss the various stages of the project with the Public

    • contract manager
      • März 2010 - Aug. 2013

      Contract Manager for SRB on 30km of motorway. Contract includes 1.5million m3 excavtion, 2.7million m3 of embankments, 27 structures, 2 interchanges and 45km of secondary roads. Responsible for the managememt of all roadworks elements, programming, resourse estimation and procurement, subcontractors, staff management, negociations with client and suppliers and site claims management.

    • roadworks manager
      • Mai 2007 - März 2010

      Responsibitily for the programming and management of 40km of Motorway including earthworks, drainage, substructure and pavement layers, safety and accoustic barriers, landscaping, signage and completion works.Resonsibilities included, estimation of plant and labour requirements, procurement of materials and subcontractors, programming works,day to day management of contract, preparation of reports, submissions to client and statutory authorities and attending meetings as Contractors represenative.

    • Construction Manager - Site Engineer
      • Sept. 1988 - Mai 2007

      Other Key Projects:N9/N10 Knocktopher to Powerstown motorway D&B Project. Roadworks Manager, 41km Motorway, Valve 227m. N8 Cashel to Mitchelstown motorway ECI Project. Roadworks Manager, 38km Motorway, Valve 258 million.N8 Cashel Bypass motorway, D&B Project, Construction Manager, 7km Motorway, Value 28 millionN18/N19, Bunratty to New Market on Fergus motorway, Site Agent, 12km motorway, ValueN8 Fermoy to Watergrass motorway PPP Project. Roadworks Manager, 17km motorway, Value 200 million Lisheen Lead and Zinc Mine, Kilkenny. Site Agent. All site infrastructure works, including 650,000m2 lined tailings pond, access roads, group watermains and site development works.Shannon-Erne waterway. Site agent. Reconstruction and automation of 13 locks and excavation of over 25 km of canal channel, including moorings, weirs, installation of new lock gates and floating jetties. Value 13 million.

Community

You need to have a working account to view this content. Click here to join now