Garri Lloyd

General Manager at Dagger Diving Services Ltd
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Tawstock, England, United Kingdom, GB

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

5.0

/5.0
/ Based on 1 ratings
  • (1)
  • (0)
  • (0)
  • (0)
  • (0)

Filter reviews by:

Glyn Overal

Garri was recruited into the Diving Standards Organisation after several recommendations. He is pasionate about his work, is a good communicator and has an eye for detail. I have enjoyed working with him for the last two years, he has been a fantastic diving inspector. I would recommend him to any future employer.

You need to have a working account to view this content.
You need to have a working account to view this content.

Credentials

  • ADC Inshore Diving Supervisor
    ADC
    Jan, 2015
    - Nov, 2024
  • Assistant Life Support Technician
    IMCA (International Marine Contractors Association)
    Dec, 2014
    - Nov, 2024
  • HSE Closed Bell Diver
    HSE
    Dec, 2014
    - Nov, 2024
  • HSE Surface Supplied Diver (Top Up)
    HSE
    Jun, 2013
    - Nov, 2024
  • RYA level 2 Powerboat
    Royal Yachting Association (RYA)
    Dec, 2011
    - Nov, 2024
  • CSWIP Underwater Inspector 3.2U
    CSWIP
    Jun, 2017
    - Nov, 2024

Experience

    • United Kingdom
    • Civil Engineering
    • 1 - 100 Employee
    • General Manager
      • Apr 2022 - Present

    • Australia
    • Oil and Gas
    • 500 - 600 Employee
    • Diver
      • Feb 2021 - Jul 2022

      DWS cutting and removal of 6" pipeline, valves and flanges from Merganser and Scoter Wells and manifolds.6" pipeline cutting and removal from Shearwater platform with 8 tonne shears and DWS.Tolmount platform Removal of PLR and blind flanges and installation of x 4 20" spool pieces and x 4 3" spool pieces with associated matting and rock filter bag installation. DWS cutting and removal of 6" pipeline, valves and flanges from Merganser and Scoter Wells and manifolds.6" pipeline cutting and removal from Shearwater platform with 8 tonne shears and DWS.Tolmount platform Removal of PLR and blind flanges and installation of x 4 20" spool pieces and x 4 3" spool pieces with associated matting and rock filter bag installation.

    • United Kingdom
    • Oil and Gas
    • 200 - 300 Employee
    • Diver
      • Oct 2020 - Nov 2020

      Installation of a J-Tube riser to Leman 27APincluding leg clamp installation in air and sat range and telemetry for future spool piece.Valve ops Spamming and intensifier installation on Whittle manifold. Installation of a J-Tube riser to Leman 27APincluding leg clamp installation in air and sat range and telemetry for future spool piece.Valve ops Spamming and intensifier installation on Whittle manifold.

    • United Kingdom
    • Oil and Gas
    • 200 - 300 Employee
    • Diver
      • Jul 2020 - Aug 2020

      IRM project for BP working on Clair and Clair Ridge platforms.Riser guide ovalisation clamp installation, grit blasting, MPI and winterisation rigging installation.Caisson repair rigging installation and riser guide centraliser clamp fitment.

    • Diver
      • Jun 2020 - Jul 2020

      Decommissioning project for Crysaor LOGGS platforms, Diamond wire cutting and dredging ops.

    • United Kingdom
    • Services for Renewable Energy
    • 500 - 600 Employee
    • 3.2U Diver
      • Jan 2020 - Feb 2020

      UWILD of the Ensco 101 Jack Up, duties include Clay clearance using 6" Hydrainer, GVI, LP Grit Blasting and Eddie Current of structural welds. UWILD of the Ensco 101 Jack Up, duties include Clay clearance using 6" Hydrainer, GVI, LP Grit Blasting and Eddie Current of structural welds.

    • United Kingdom
    • Oil and Gas
    • 200 - 300 Employee
    • Rigger/Slinger Banksman
      • Oct 2019 - Jan 2020

      Deck support for Saturation and ROV teams

    • Trainee Saturation Diver
      • Jul 2019 - Oct 2019

      SCM replacement

    • Rigger
      • May 2019 - Jul 2019

      Decommissioning project for Fairfield onboard the CSV Normand Clipper, Dunlin Field.

    • Diver/Rigger
      • Apr 2019 - May 2019

      Decommissioning project. Installation of SPAM and barrier testing prior to flushing operation on Hawksley EM.Rigging support for Sat teams, duties included operation of all deck equipment and launch and recovery of tools and equipment to support SPAM installations and flushing operations. Also supporting Standby Diver in the launch and recovery of bells and changing over breathing gas filtrations towers.

    • Security and Investigations
    • 1 - 100 Employee
    • UXO Engineer
      • Mar 2019 - Apr 2019

      Intrusive and non intrusive UXO survey prior to pipeline installation using Vallon GPS and Schonstedt. Intrusive and non intrusive UXO survey prior to pipeline installation using Vallon GPS and Schonstedt.

    • United Kingdom
    • Maritime
    • 1 - 100 Employee
    • Diver/Welder
      • Feb 2019 - Mar 2019

      Welding installation of anodes up to 80kg to new quay walls and marina piles as part of the Dover Western Docks Revival. Welding installation of anodes up to 80kg to new quay walls and marina piles as part of the Dover Western Docks Revival.

    • United Kingdom
    • Oil and Gas
    • 200 - 300 Employee
    • Rigger/Air Diver
      • Dec 2018 - Dec 2018

      Rigging support for Sat teams, duties included operation of all deck equipment and launch and recovery of tools and equipment to support the fitting of x 3 grouted support clamps. Also supporting Standby Diver in the launch and recovery of bells and changing over breathing gas filtrations towers. Rigging support for Sat teams, duties included operation of all deck equipment and launch and recovery of tools and equipment to support the fitting of x 3 grouted support clamps. Also supporting Standby Diver in the launch and recovery of bells and changing over breathing gas filtrations towers.

    • United Kingdom
    • Maritime
    • 1 - 100 Employee
    • Diver/Welder
      • Nov 2018 - Nov 2018

      Welding installation of anodes up to 80kg to new quay walls and marina piles as part of the Dover Western Docks Revival. Welding installation of anodes up to 80kg to new quay walls and marina piles as part of the Dover Western Docks Revival.

    • United Kingdom
    • Oil and Gas
    • 100 - 200 Employee
    • 3.2U/DMT Air Diver
      • Aug 2018 - Sep 2018

      Decommissioning gas platforms in the southern sector Air support for Sat team, carrying out GVI's on conductor guides and placing/removing static rigging for drilling template removal. Decommissioning gas platforms in the southern sector Air support for Sat team, carrying out GVI's on conductor guides and placing/removing static rigging for drilling template removal.

    • United Arab Emirates
    • Oil and Gas
    • 1 - 100 Employee
    • 3.2U/DMT Air Diver/Deck Leader
      • Jul 2018 - Aug 2018

      Supervision of all deck works including simultaneous operations between Panther ROV, Divers and Vessel Crane. Installation of ICCP Retro buoys to designated Turbines, including I tube clamp fitment, cable pull in and mattress laying.

    • 3.2U Air Diver
      • Jun 2018 - Jul 2018

      Complete vessel mobilisation package, Installation of ICCP Retro buoys to Bard1 Substation including cable pull in, VBR installation, continuity cable installation and mattress laying.Inspection package to include cleaning to SA1 and GVI on boat landing clamps and marine growth samples on selected turbines.

    • 3.2U Air Diver/Deck Leader
      • May 2018 - Jun 2018

      Complete vessel mobilisation package, Supervision of all deck works including simultaneous operations between Panther ROV, Divers and Vessel Crane. Installation of ICCP Retro buoys to designated Turbines, including I tube clamp fitment, cable pull in and mattress laying.

    • UXO Supervisor
      • Mar 2018 - May 2018

      Target investigation off all proposed pile positions utilising a full onboard dive team, long reach excavator, dredge hog, airlift, DX300 and AQ1B.Supervision of the T.I. of all pUXO targets.Producing detailed TIR’s for all proposed pile positions with associated SSS and or Mag targets located during initial site investigation survey.Detailed narration of the DPR. Target investigation off all proposed pile positions utilising a full onboard dive team, long reach excavator, dredge hog, airlift, DX300 and AQ1B.Supervision of the T.I. of all pUXO targets.Producing detailed TIR’s for all proposed pile positions with associated SSS and or Mag targets located during initial site investigation survey.Detailed narration of the DPR.

    • United Kingdom
    • Maritime Transportation
    • 1 - 100 Employee
    • Air diver/Supervisor, 3.2U Inspector & DMT
      • Sep 2015 - Mar 2018

      Various inshore diving operations Inc. diving and supervising ABS/DNV-GL UWILD inspections on vessels and rigs, fish farm diving support, sheet pile weld repairs and anode installation, ferry terminal repairs, cooling water inlet pipe valve repairs, Iona to Mull water supply pipeline installation, prop clearances, power station diffuser maintenance, distillery diffuser installation, UWILD and anode replacement on the Maersk Reacher Jack up Drilling Rig, UWILD and anode replacement on the Safe Caledonia Accomodation rig, Installation of the Caithness Moray HVDC Cable, Installation of the Hywind Pilot park HVDC cable

    • United Arab Emirates
    • Oil and Gas
    • 1 - 100 Employee
    • Air Diver/3.1U Inspector
      • May 2015 - Aug 2015

      Post Installation works on the Borwin Beta substation Inc. broco burning and removing grout lines/hydraulic lines, recovery of pile caps and mud mat inspections. Post Installation works on the Borwin Beta substation Inc. broco burning and removing grout lines/hydraulic lines, recovery of pile caps and mud mat inspections.

    • United Kingdom
    • Maritime Transportation
    • 1 - 100 Employee
    • Air Diver/Supervisor & 3.1U Inspector
      • Nov 2014 - May 2015

      Diamond Drilling Ocean Confidence UWILD and fitment of seachest blanks,Pipeline inspection,Removal of Monopiles using Broco,Placement and inspection of boat moorings,Search and recovery of various targets,Ships hull and thruster ABS inspection,Ships thruster clearance. Diamond Drilling Ocean Confidence UWILD and fitment of seachest blanks,Pipeline inspection,Removal of Monopiles using Broco,Placement and inspection of boat moorings,Search and recovery of various targets,Ships hull and thruster ABS inspection,Ships thruster clearance.

    • United Arab Emirates
    • Oil and Gas
    • 1 - 100 Employee
    • Air Diver/3.1U Inspector
      • Mar 2014 - Oct 2014

      Removal of dewatering pumps grout pipes and hydraulic lines from Helwin Alpha SubStation.Inspection of the Bard 1 substation using UT and Eddie Current,Installation of new reference cells for impressed current systems on various turbines in Bard Wind Farm.Preparation of a subsea jacket prior to the installation of the Borwin Beta substation, removing pile caps, cabling and pipework.Continuation of installation after top package arrival, pile cap recovery and removal of anchor heads.

    • United Kingdom
    • Oil and Gas
    • 100 - 200 Employee
    • Air Diver
      • Dec 2013 - Dec 2013

      IRM Package on Fulmar A Platform, workscope included riser clamp earthing continuity cable installation and GVI of riser clamp. IRM Package on Fulmar A Platform, workscope included riser clamp earthing continuity cable installation and GVI of riser clamp.

    • Oil and Gas
    • 1 - 100 Employee
    • Air Diver/Rigger
      • Nov 2013 - Dec 2013

      Periodic maintenance on FSO Asia including Hawser change out and export pipeline maintenance. Periodic maintenance on FSO Asia including Hawser change out and export pipeline maintenance.

    • United Arab Emirates
    • Oil and Gas
    • 1 - 100 Employee
    • Air Diver
      • Aug 2013 - Nov 2013

      Preparation of a subsea jacket prior to the installation of the Borwin Beta Converter Station, removing bridle clamps, dewatering pumps, hydraulic jacks, cabling and pipework. Preparation of a subsea jacket prior to the installation of the Borwin Beta Converter Station, removing bridle clamps, dewatering pumps, hydraulic jacks, cabling and pipework.

    • United Kingdom
    • Civil Engineering
    • 1 - 100 Employee
    • Air Diver
      • Aug 2013 - Aug 2013

      Shallow water trial of the Saipem Brutus flange connection tool, hydraulic crossovers, valve checks and observation of tool operation. Shallow water trial of the Saipem Brutus flange connection tool, hydraulic crossovers, valve checks and observation of tool operation.

    • United Kingdom
    • Oil and Gas
    • 100 - 200 Employee
    • Air Diver
      • Jun 2013 - Jul 2013

      Installation of subsea J-tube to the Leman 27A platform working from DSV Bibby Sapphire, clamp fitment and vertical tie in using Hydratight. Installation of subsea J-tube to the Leman 27A platform working from DSV Bibby Sapphire, clamp fitment and vertical tie in using Hydratight.

    • United Kingdom
    • Maritime Transportation
    • 1 - 100 Employee
    • Air Diver
      • Mar 2013 - Jun 2013

      Seabed clearance prior to Maersk Resillient Rig yard stay at Berth 4 Invergordon,Sewage outfall pile support bracing with hydraulic power pack at Nairn,Inspection and testing of fishplate and chord welds on Maersk Resillient Jack up Rig using UT, A Scan And Eddie Current at Berth 4 Invergordon,Sliding lock gate bogey wheel inspection and lock rail inspection at Leith Docks,Removal of existing wave screen clamps using Broco at MOD Pier Kyle of Lochalsh,Ferry terminal wall inspection at Gourock,Cruciform weld inspection using stills camera on Noble TVL semi sub rig at Berth 4 Invergordon,Removal of damaged footprint from VOS Ships Protector using Broco at Fraserbrough.

    • United Kingdom
    • Oil and Gas
    • Air Diver
      • Jan 2013 - Mar 2013

      Working from a barge on Sierra Re-fueling jetty London Gateway project in the Thames estuary.Sub surface survey and inspection of existing pile walls for clutch damage.Repair of clutches using Speedcrete, Grout socks and Grout bags. Working from a barge on Sierra Re-fueling jetty London Gateway project in the Thames estuary.Sub surface survey and inspection of existing pile walls for clutch damage.Repair of clutches using Speedcrete, Grout socks and Grout bags.

    • United Kingdom
    • Defense & Space
    • 700 & Above Employee
    • Air Diver
      • Jul 2008 - Jan 2013

      Subsea Construction, Demolition, Search, Survey, Instruction and Inspection at Home and Abroad.

    • Soldier
      • Apr 1999 - Jul 2008

      Operations at Home and Abroad including:Op Jacana (Afghanistan)Op Telic (Iraq)Op Herrick 5 (Afghanistan)Qualifications held from rank of Sapper to Corporal:CommandoEOD 0804Army Diving Supervisor

Education

  • Arborfield Army Apprentice College
    Various NVQ's
    1999 - 1999
  • Bishops of Hereford Bluecoat school
    GCSE's
    1994 - 1998

Community

You need to have a working account to view this content. Click here to join now