Gangesh Sahu

at ALM Rail Solutions Est - KSA
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Yamunanagar, Haryana, India, IN

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Credentials

  • Confined Space Rescue Team Training
    DISS Restoration
  • First Adder
    ECSI System Integrators
  • Lifting Supervisor
    DISS Restoration
  • Scaffolding Inspector
    BACS Riyadh Metro Project

Experience

    • Saudi Arabia
    • IT Services and IT Consulting
    • 1 - 100 Employee
      • Jun 2021 - Present

      CIS Department Responsibility (June 2021 to Present) Line 1&2-Installation of Speakers & ANS & Installation of PID(Passenger Information Display).-UPS & PDC power cable termination & CTN box data cable termination with RJ 45 connector.-COMT Room PAVA cabinet SPK, ANS cable pulling, and termination.-SPK, PID, PDC cable label fixing & PAVA cabinet cable termination.-SMR room microphone and printer cable termination.-Stabling building and Vehicle wash building RTU to door control cable pulling and termination.-East Depot workshop building, vehicle wash building, and Stabling building SPK, ANS installation, and cable termination Show less

      • Sep 2019 - May 2021

      Signalling Department Responsibility (September 2019 to May 2021) Line 1&2-Installation and test of Signaling equipment like CTC, ACC, ECC, CPAI, WCN, IOC, PDC, Relay Rack, Switch-Machines, Cables Tray, Axle counter, Access Point (AP) encloser, and Antenna poles, Signal poles, JB boxes.-Direct the effort on site by the contractor installing the wiring and signaling equipment.-Ensure that work is completed according to plans and specifications for the project.-Ensure that the working methods and the quality of the finished product are according to the rules of art.-Ensure that work is carried out safely & Prepare daily progress reports.-Ensure that work is completed within time and on budget, without incurring additional costs.-Coordinate with Engineers and disciplines on the project to establish common priorities.-Coordinate with representatives of the manufacturers of the equipment on site.-Coordination with the Site Manage & persons in charge of disciplines and inspectors QC for the inspections and the tests.-Cables glanding & termination & Installation of earthing system.-Cable Laying and Cable Dressing indoor and outdoor equipment like UPS, TESPM, TES, etc. Show less

    • Qatar
    • IT Services and IT Consulting
    • 1 - 100 Employee
    • Signalling Engineer
      • Jan 2018 - Aug 2019

      -Led the Installation Team for the Installation of all Indoor and Outdoor Signalling equipment such as Aspect signals, Axle counters, WRU Antenna, Point machines, Transponder Tags and proximity plate, Zone controller (IXL and NIXL), DCS system, PDC, Relay Racks, Isolation Transformer, etc. as per design. -Performing fibre splicing and testing ( OTDR and Power meter). -Installation of VDR antenna (VHF Data Radio antenna). -Installation of CCTV, Tel-Cab, IAS door sensor, DSS Sign Board, BLS, etc. -Installation of FDAS tamper switches. -Laying of Radiating Cable (i.e. VDR, ORS, MOI ) for public communication across the tunnel area by following the updated version of the SLD drawing. -Responsible for installation of the IAS door Sensor in the emergency exit. -Installation of Fire alarm Speakers across the tunnel area. -Validating and testing of wire termination Site acceptance test. -Planning of Man, Machine, and Materials on basics of project target specified by the Client. -Planning a weekly plan schedule work with the project manager and sending reports to the Client. Show less

    • India
    • Truck Transportation
    • 1 - 100 Employee
    • Technical Support Engineer
      • Aug 2015 - Dec 2017

      -Responsible for and Supervise all types of equipment installation, testing, and cable laying Indoor and Outdoor as well as commissioning. -Installation of outdoor equipment such as Balise, point machine, signal, DCS pole, etc. -Installation of indoor equipment such as cabinet, Relay rack, PDC, ACE rack, etc. -Verify the installation should be installed as per SOD & Preparation for Installation verification documents. -Responsible for Red correction drawing which is to be submitted to DMRC & Preparing a weekday schedule plan work. -Installation of outdoor equipment (i.e. WRS antenna, CCTV antenna pole, FCB JB, FCB sensor, signal, point machine, Balise. -Testing of cables with the help of continuity and megger tests & preparing the PAT and SAT reports for the clients. -Indoor testing activities like Bell testing, panel wiring, PICO testing, and power testing. Show less

    • India
    • Consumer Services
    • 700 & Above Employee
    • Data Entry Operator
      • Aug 2013 - Jul 2015

      Airtel and Tata Docomo. Airtel and Tata Docomo.

Education

  • IIMT Studies - International Institute of Management and Technical Studies
    Bachelor of Engineering - BE, Electrical Engineering
    2020 - 2022
  • Seth Jai Parkash Mukand Lal Inst. of Engineering & Technology
    Diploma, Electrical Engineering
    2010 - 2013

Community

You need to have a working account to view this content. Click here to join now