Ganga Ram Verma

Vice President (Mines) at Hira Group of Industries
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Ranchi, Jharkhand, India, IN
Languages
  • English Native or bilingual proficiency
  • Hindi Full professional proficiency

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

5.0

/5.0
/ Based on 2 ratings
  • (2)
  • (0)
  • (0)
  • (0)
  • (0)

Filter reviews by:

NIRMAL CHANDRA JHA

Mr Ganga Ram Verma has expertise in mine planning using MINEX software and plans diligently. I had watched his work closely during my advisory to SAIL and found him to be a very intelligent planner. I wish him all success in his works.

Arvind Singh Chauhan

Mr. Gangaram Verma is a very simple person but highest standard of integrity, sincerity and technical knowledge. He is expert in mine planning related softwares like SURPAC, Mine Sched, Whittle

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • Mining
    • 1 - 100 Employee
    • Vice President (Mines)
      • Sep 2019 - Present

      Heading the Mining Division of Hira Group of Industries. Heading the Mining Division of Hira Group of Industries.

    • Mining
    • 700 & Above Employee
    • Manager (Mining)
      • Jul 2016 - Sep 2019

      1. Mentoring Jr. Executives, Businesses Development.2. Technical Co-ordination with multi-disciplinary engineering team for different Mining Projects 3. Preparation of DPR, FR. TCVR, Mine Plan, Mine Closure Plan etc. 4. Opencast coal mine planning & design using MINEX softwares.5. Mine Planning & Design using SURPAC, MineScheduler, Whittle, Datamine softwares.6. Visit to mines, Interaction with stackholders of different mining companies.

    • Senior Design Engineer (Mine Planning)
      • Jun 2013 - Jun 2016

      Major Responsibilities:1. Project co-ordination for various mine plans.2. Computerised Mine Planning & Design using SURPAC, MineSched & Datamine Software.3. Feasibility/ Pre-feasibility Study, Technical Due Diligence for various Greenfield & Brownfield mining projects, JORC Reserves estimation, JORC technical evaluation.4. Interaction with stackholders of different mining companies.5. Business Development.

    • Design Engineer (Mine Planning)
      • Apr 2009 - Jun 2013

      Major Responsibilities : 1. Visit to Mine Sites, Interaction with stakeholders of different Engineering disciplines at site, Government organizations etc.2. Mine Planning & Design using SURPAC, MINEX, Mine Scheduler software of GEMCOM & Datamine studio 3.0. Review of collected data, review & validation of borehole data.  Preparation of Geological Database. 3-Dimentional Orebody modeling (Solid Modeling), Statistical & geo-statistical analysis of ore deposit, Block modeling, Ore reserve estimation and Reserve Categorisation as per UNFC Norms. Pit Optimisation with different scenarios using Whittle 4X & Ultimate Pit Design. Production Scheduling, Short term/medium term (quarterly, monthly & year-wise) & long term production planning (five yearly production plans upto mine life), Open pit mine design. Waste dump planning including external dump & backfill design. Techno-economic selection & sizing of HEMM. Assessment of consumables requirement. Assessment Capital Cost & Operating Cost for opencast mines.3. Route cause analysis for Mine Productivity improvement studies.4. Preparation & approval of Reports Statutory reports “Mining Plan/Mining Scheme” as per guidelines of Indian Bureau of Mines. Pre-feasibility Study, Feasibility Report, Detailed Project Report, Detailed Project Execution Report, Technical Due Diligence of open pit mines, Long term mine plans etc.5. ISO – 9001 Audit activities.6. Co-ordination with different interdependent service/engineering sections like Power, Water, Civil & Structural Works, Techno-economics etc. of the organisation to accomplish the given assignment.7. Business Development

    • Assistant Design Engineer (Mine Planning)
      • Jun 2006 - Apr 2009

      Successfully completed mine planning & design of various open pit Iron Ore, Limestone, Coal, Chromite & Bauxite mines using SURPAC, Minesched & Datamine Software.

    • India
    • Environmental Services
    • 1 - 100 Employee
    • Faculty (Mining)
      • Sep 2001 - Jun 2006

      Academic, Research & Promotion of Consultancy Services for :1. Ground Vibration Monitoring, Establishment of predictor equation.2. Assessment of continuous down-the hole and unconfined Detonation Velocity of of SME, SMS & ANFO explosives.3. Blast Design & blast monitoring. Assessment of Drilling & Blasting Cost.4. Assessment of Rock Fragmentation using WipFrag software.5. Development of Computer program for rock fragmentation prediction

Education

  • NIT Raipur (Erstwhile GEC Raipur)
    B.E.(Mining), Mining Engineering
    1997 - 2001

Community

You need to have a working account to view this content. Click here to join now