Ganesha Moorthy

QC Lead Mechanical Engineer at SEPCO III ELECTRICITY POWER CONSTRUCTION CORPORATION
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
SA
Languages
  • English -
  • Hindi -
  • Tamil -
  • Telugu -

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Credentials

  • ASNT level II
    -

Experience

    • QC Lead Mechanical Engineer
      • Nov 2017 - Present

      Construction (5 x 627MW) Supercritical boiler power plant in Yanbu 3, Kingdom of Saudi Arabia. Construction (5 x 627MW) Supercritical boiler power plant in Yanbu 3, Kingdom of Saudi Arabia.

    • Saudi Arabia
    • Appliances, Electrical, and Electronics Manufacturing
    • 200 - 300 Employee
    • QC Engineer
      • Mar 2015 - Nov 2017

       Execution of jobs and carrying out the inspections by referring various international codes, standards and specifications.  Reviewing the approved quality plans, Manuals, FAT report, Submitals and scope of work to perform the required inspection.  Stage-wise inspections and fabrication of piping, structures and installation of equipment.  Quality check on the material and installation as per the quality specifications/ manual and client quality standards and requirements.  To Interface and Coordinate with Operation and clients for QC Issues and Coordinate with Third Party Inspection agencies for all related Inspection Activities.  To act as a focal and coordination point for ISO internal and external audits and to conduct internal and operation audits.  To ensure all operation and quality aspects concerning welding/piping are carried out in strict accordance with written agreed practices or specification.  Obtain, review and familiarize with client project specification, welding and piping procedure and acceptance standard.  Ensure material preservation and traceability after fabrication as per quality procedure and client requirements.  Line check, preparation of punch list and assist in the test pack operation.  Witnessed hydro test, leak test, pneumatic test, pad test, flushing / air blowing.  Reviewing the applicable instruments for inspection with valid calibration certificates.  Welding of Piping system as per shop and field weld and inspection.  Coordination of NDT crews as per the priorities.  To undertake preparation of Final QC dossier/ Manufactures Record Book as applicable for handing over to the Client and maintain proper filing system (as per Organization procedure) with full traceability for retrieving the QC document.

    • China
    • Oil and Gas
    • 700 & Above Employee
    • QA/QC Engineer
      • Jul 2013 - Mar 2015

       Monitor the implementation of the approved site QC Plan.  Implementing the QA/QC Management system at site.  Coordinate all receipt inspections and Preparation of Checklist for Stage inspection.  Ensure all quality control documentation is complied and competed for as-built hand over through the QC turnover engineer.  Control all Non-conformance reports and undertake remedial action.  Addressed & Witnessed for the Welder Qualification Test and in Preparation of WPS, PQR and WQT.

    • India
    • Oil and Gas
    • 100 - 200 Employee
    • QA/QC Engineer
      • Dec 2012 - Jun 2013

       Carryout Material Inspection of various materials of Ferrous, Non-Ferrous, Alloys, Non- Metallic materials, Valves, Actuators, Flanges, Fasteners, Fittings, Gaskets, etc.  Verify / Witness incoming material for traceability, dimensions, identifications, colour coding, Storage etc in line with MTC and QP specifications.  Reviewing Material Test Certificates, Inspection Release Certificate referring ASTM, ASME/ANSI, API, BS, QP & Specification, International Codes and Standards.  Make sure all relevant Specification, documentation (Method Statement, Material data sheet, ITP) and Drawings are obtain before any job start.  Inspections for various piping activities, visual inspection of spools assembly, various pipe.  Preparation of Mechanical Completion Certificate Packages (MCC), Pipe book, Test packages.  Ensure the erected pipelines/piping/structures/equipments all as per applicable code/specification.  Witness of alignment, orientation and dimensions of installed piping/equipment.  Inspection of gaskets, supports, valves prior to line reinstatement acceptance as per latest drawings for construction, code and specification standards.  Responsible for re-instatement and bolt torque and bolt tightening inspection.  Witness Pipeline cleaning, gauging and GMFL run etc…  Liaise with the construction Manager / Site Engineer in case of non-conformance and ensure corrective actions are taken.

    • QA/QC Engineer
      • Jul 2010 - Nov 2012

       Involved in customer co-ordination, Manpower management, Project implementation schedule.  Coordination with procurement team for release of purchase order as per procurement schedule for Fabrication/Erection Requirement.  Calculating Consumables Requirement for Projects like Welding rod, cutting Disc, Welding Machine, and welding consumables.  Calculating Manpower Requirement for Executing Particular Project as per schedule.  Identification & close monitoring of critical path, critical activities as per schedule.  Monitoring production Report daily wise to Achieve target within schedule as well as cost.  Daily wise conducting meeting with supervisor against Progress.  Involved in Production of Pre fabrication & welding team for progress of both piping & vessels, within controlled man hours.  Organizing for Carrying stage-wise inspection for all pressure vessels and piping.  Organizing awareness program for workers regarding production & safety.  Preparation of Progress Reports / Review Presentation for Management and Client for key project Milestones to team.  Co- ordination with Technical / Design department for necessary changes in Drawing (conflicts regarding pipe routing/Welding fillet size).

Education

  • Anna University
    Bachelor’s Degree, Mechanical Engineering
    2006 - 2010
  • Jawahar Hr.Secondary Matriculation School, Neyveli

Community

You need to have a working account to view this content. Click here to join now