Gabriel Peña Beltran
Automation Engineer at Axelgaard Manufacturing Company- Claim this Profile
Click to upgrade to our gold package
for the full feature experience.
-
Español -
-
Inglés -
-
Italiano -
Topline Score
Bio
Credentials
-
AutoCAD Electrical: Implementing PLCs
LinkedInApr, 2020- Nov, 2024 -
Excel para principiantes: Tablas dinámicas
LinkedInApr, 2020- Nov, 2024 -
Learn Industrial Automation
LinkedInApr, 2020- Nov, 2024 -
Learning PLC Ladder Logic
LinkedInApr, 2020- Nov, 2024 -
PLC Ladder Logic Essential Training
LinkedInApr, 2020- Nov, 2024
Experience
-
Axelgaard Manufacturing Company
-
Medical Equipment Manufacturing
-
1 - 100 Employee
-
Automation Engineer
-
Jul 2022 - Present
-
-
PLC Software Engineer
-
Jun 2020 - Jul 2022
-
-
-
Eastlake Manufacturing de Mexico
-
Tijuana y alrededores, México
-
Maintenance and Engineering Manager
-
Aug 2017 - Jul 2019
Reported directly to the general manager and responsible for 3 supervisors, 3 engineers, 4 technicians and 6 auxiliary technicians. In charge of the designing machines in order to automate process and used Microsoft Project to analyze costs, time projection, and labor. A major accomplishment was the automatization of the balloon printing department, as all was previously done by hand. Utilized Lean Six Sigma to analyze process times and area of opportunities that could be substituted by a machine. As maintenance manager I was in charge of the preventive, corrective and improvement activities. Implemented the CMMS MP9 software to create all the activities and routines. Executed projects with Allen Bradley and Mitsubishi PLC. Worked with electronic devices like; drivers to control frequency of motors, sensors, timers, relays, power supplies and electro-valves. Worked with different type of electricity 480v, 220v, 120v and 24v. Worked with Pneumatic systems like compressors Kaeser, pistons and valves. Show less
-
-
-
Rain Bird Corporation
-
United States
-
Manufacturing
-
700 & Above Employee
-
Ingeniero de mantenimiento
-
May 2017 - Aug 2017
-
-
-
Bachoco
-
Mexico
-
Food and Beverage Manufacturing
-
700 & Above Employee
-
Jefe de Mantenimiento
-
Jun 2015 - Jun 2016
Responsible for managing personnel and holding maintenance team accountable for duties and responsibilities. Responsibilities included; reviewing of maintenance costs, preventive and corrective maintenance, reviewing standard times of maintenance routines while reviewing and verifying failure analysis. Made audiovisuals in different areas in order to detect anomalies, all while optimizing energy resources and analyzing deviations. In charge of 6 maintenance supervisors and 41 technicians. A major accomplishment was running the autonomous maintenance of the company and decreasing the labor of maintenance technicians by 15%. Reduce the costs of maintenance by 9% equivalent of $540,000 dollars a year. Worked with more than 3,400 devices controlled by the software SAP as our CMMS, refrigeration by ammonia with compressors Mycon, industrial steamers by Cleaver Brooks and did routine maintenance for thermoforming machines like MULTIVAC. Show less
-
-
-
PepsiCo
-
United States
-
Food and Beverage Services
-
700 & Above Employee
-
Maintenance Coordinator
-
Jan 2013 - Dec 2014
Lead a maintenance department that includes front line specialist operators and a team of mechanics. Responsible for motivating, developing, and coaching team members to utilize the processes and facilitate problem solving on the floor to ensure quality performance. Responsibilities included; plan and supervise preventive and corrective activities, cost efficiency by following KPI’s, continuous improvement on processes, work with outsourced vendors and safety for the entire business unit across all shifts. Achieving site performance for uptime, equipment reliability, equipment effectiveness, and building/ground maintenance. Coordinator of the packaging area where I acquired experience on labeler machine like Kronos, Ink markers like VideoJet, box formers like Combi, conveyors by Intralox, and automatic tapers by 3M. A major accomplishment was installing a new production line in the packaging area that included; partnering with vendors from Italy and England, electricity installation, bolting machines to the floor, make the commissioning of the line. Show less
-
-
Education
-
Universidad del Valle de México
Ingenieria Mecatronica, Ingeniería electrónica, robótica y mecatrónica -
CETYS Universidad
Master of Business Administration - MBA, Alta Gerencia