G. Keith Rowe
Operations Essentials Control of Work Facilitator - British Petroleum at Houston Controls- Claim this Profile
Click to upgrade to our gold package
for the full feature experience.
Topline Score
Bio
0
/5.0 / Based on 0 ratingsFilter reviews by:
Experience
-
Houston Controls
-
Construction
-
1 - 100 Employee
-
Operations Essentials Control of Work Facilitator - British Petroleum
-
Jun 2013 - Present
Facilitator delivering specific Control of Work workshops (HITRA Hazard Identification / Task risk Assessment & Isolations) Facilitator delivering specific Control of Work workshops (HITRA Hazard Identification / Task risk Assessment & Isolations)
-
-
-
BP
-
France
-
Business Consulting and Services
-
1 - 100 Employee
-
O E Facilitator
-
Jun 2013 - Present
-
-
-
-
Senior Data Analyst
-
Nov 2011 - May 2012
I am the Functional Consultant currently working to complete the data collection and preparation for a pilot Maximo implementation on Terminal A @ Logan Airport in Boston Mass. I am creating the load tables for Location / Assets, Job Plans / PM's, Items, Classifications, Failure Codes. I am the Functional Consultant currently working to complete the data collection and preparation for a pilot Maximo implementation on Terminal A @ Logan Airport in Boston Mass. I am creating the load tables for Location / Assets, Job Plans / PM's, Items, Classifications, Failure Codes.
-
-
-
GLOBAL CONSULTING MANAGEMENT GROUP
-
United States
-
Senior Data Analyst / Lead Consultant
-
Jan 2009 - Aug 2011
Completed a custom implementation of Aspen Retail for British Petroleum's San Juan South Asset. The software was used to optimize the trucking and disposal of Produced water from BP's gas wells. This pilot project netted an estimated 40% savings and was carried into sustainability and is current being rolled out to the remainder of BP's North American Gas assets. Completed a custom implementation of Aspen Retail for British Petroleum's San Juan South Asset. The software was used to optimize the trucking and disposal of Produced water from BP's gas wells. This pilot project netted an estimated 40% savings and was carried into sustainability and is current being rolled out to the remainder of BP's North American Gas assets.
-
-
-
M & H Energy Services
-
United States
-
Construction
-
Implementation Consultant
-
2006 - 2008
-
-